Highlights
• Revised JORC-compliant Exploration Target established for the Red Mountain Lithium
Project following the recent announcement of the maiden Inferred Mineral Resource Estimate
of 500Mt @ 1,139ppm Li for 3.03Mt contained Lithium Carbonate Equivalent (LCE)31
.
• The Exploration Target comprises 10 discrete prospective areas based on exploration work
completed to date, across the Red Mountain and Red Mountain Extension claim blocks.
• Exploration designed to evaluate the Exploration Targets in 2026 comprises;
o Four Red Mountain claim block Exploration Target areas to be drill tested; and
o Six Exploration Target areas to undergo further rock chip sampling.
Venari Minerals NL (ASX: VMS) (“VMS”, “Venari” or “the Company”) is pleased to announce a revised
JORC 2012 compliant Exploration Target for its 100%-owned Red Mountain Lithium Project, located in
Nevada, USA. The global Exploration Target is estimated to range from 2,020Mt to 2,690Mt at an
average grade range of between 1,000 and 1,300ppm Li, or 0.53 and 0.69% Lithium Carbonate
Equivalent (LCE)27
, for a range of contained lithium of between 10.7 and 18.6Mt LCE.
Cautionary Statement
The potential quantity and grade of the Exploration Targets set out in Table 1 is conceptual in
nature. There has been insufficient exploration in the target areas to date, to estimate a Mineral
Resource and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The Exploration Target has been prepared and reported in accordance with the 2012
edition of JORC Code.
Exploration
Target
Tonnage (Mt) Grade (ppm Li) Grade (% LCE) LCE (Mt)
Red Mountain 1,200 – 1,600 1,000 – 1,300 0.53 - 0.69% 6.39 – 11.1
Red Mtn Ext.*
816 – 1,090 1,000 – 1,300 0.53 - 0.69% 4.35 – 7.53
Project 2,020 – 2,690 1,000 – 1,300 0.53 - 0.69% 10.7 – 18.6
Table 1. Combined revised Exploration Target for the Red Mountain Lithium Project.
Note – The Red Mountain Extension Claims are located on a Wilderness Study Area which is part of a draft Nye County
Public Lands Bill that recommends this land be re-classified for multiple use, including exploration, however this requires
approval by Congress. Currently no ground disturbing exploration (i.e. drill pad preparation) is possible, however surface
sampling may be undertaken.
2
newmurchgold.com.a
The Company has undertaken significant exploration at the Red Mountain Project, including soil and
rock chip sampling, geological mapping of rock types, structural orientation measurements, Reverse
Circulation (RC) and diamond exploration drilling. The announcement of the maiden MRE for the Red
Mountain Lithium Project rendered the previous Exploration target redundant.As a result, the Company
has now established a revised Exploration Target, based on exploration results from across the Project.
The Company intends to systematically explore the Exploration Target areas through selective drilling
and rock chip sampling in 2026, and further drilling in 2027.
Venari Chief Executive Officer, Matthew Healy, said: “The Company recently released a landmark
maiden Mineral Resource Estimate for the Red Mountain Lithium Project, revealing a large lithium
Resource with a very high-grade component in the north of the broader Project area.
“The announcement of a revised Exploration Target complements the maiden MRE by demonstrating
the substantial upside potential at the project.
“With the Trump Administration prioritising fast-tracked permitting and development of domestic
critical metals projects, Venari is exceptionally well-placed to continue rapidly unlocking the significant
value of the Red Mountain discovery for our shareholders.
I look forward to getting the drill rigs back on site as soon as possible to focus on upgrading the MRE
category, increasing the size of the MRE and drill testing a portion of this outstanding Exploration Target,
bringing new zones of mineralisation into the Resource pipeline.”
Background
The Red Mountain Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known
locally as the Horse Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium
deposits (see Figure 2) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project25
and
American Battery Technology Corporation’s (NASDAQ: ABAT) 18.7Mt LCE Tonopah Flats deposit26
.
The Maiden Inferred Mineral Resource Estimate for the Project of 500Mt @ 1,139ppm Li for 3.03Mt
contained Lithium Carbonate Equivalent (LCE)31
reported above the preferred 700pm Li cut-off grade
(Table 1), includes a Northern Zone with an exceptionally high-grade internal component of 47.9Mt @
2,193ppm Li for 0.56Mt LCE31
, at a 1,300ppm lithium cut-off.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration, and beneficiation
test-work has highlighted the potential to upgrade the Red Mountain mineralisation15-19
.
The Red Mountain Project is well-serviced by infrastructure, being immediately adjacent to the
transcontinental Route 6, 20km west of 525kV high-voltage transmission line and with 592,000m3
per
annum of water rights secured associated with a 113-acre acre private property located only 6km from
the Project29
.
Red Mountain Claim Block Exploration Target
The Red Mountain Exploration Target comprises eight distinct areas labelled A through H, all of which
are located on the Red Mountain Claim Block (Figures 1 to 4).
3
newmurchgold.com.a
Basis for Exploration Target
The basis for digitising the exploration target areas is surface sample geochemistry and mapped
geology20-24
. Coherent zones of >50ppm Li anomalism in soils were digitised across rock types deemed
prospective for sedimentary lithium mineralisation, taking into account the presence of alluvium that
may mask prospective bedrock. These eight distinct areas range in surface area from 0.024km2
to
2.12km2
.
To establish the upper target tonnage ranges, a nominal density of 2g/cm3
and a depth extent of 200m
was applied, with the lower tonnage range calculated as 75% of the upper tonnage range. The lower
grade range is equal to the 50th
percentile value of all 1,790 drill samples assaying ≥500ppm Li on the
Project to date (1,035ppm Li), rounded to the nearest 100ppm (1,000ppm Li)1-14
. The upper grade range
is equal to the 70th
percentile value of all drill samples assaying ≥500ppm Li on the Project to date
(1,335ppm Li), rounded to the nearest 100ppm (1,300ppm Li).
Exploration
Target Area
Claim Block
Tonnage
(Mt)
Grade (ppm
Li)
Grade (%
LCE)
LCE (kt)
A Red Mountain 7 - 10 1,000 – 1,300 0.53 - 0.69% 39 - 67
B Red Mountain 37 - 49 1,000 – 1,300 0.53 - 0.69% 196 - 339
C Red Mountain 27 - 35 1,000 – 1,300 0.53 - 0.69% 141 - 245
D Red Mountain 77 - 103 1,000 – 1,300 0.53 - 0.69% 411 - 712
E Red Mountain 141 - 188 1,000 – 1,300 0.53 - 0.69% 751 – 1,302
F Red Mountain 103 - 137 1,000 – 1,300 0.53 - 0.69% 548 - 950
G Red Mountain 171 - 228 1,000 – 1,300 0.53 - 0.69% 909 – 1,575
H Red Mountain 637 - 850 1,000 – 1,300 0.53 - 0.69% 3,392 – 5,879
Total Red Mountain 1200 - 1600 1,000 – 1,300 0.53 - 0.69% 6,386 – 11,069
Table 2. Exploration Target for the Red Mountain Claim block
Cautionary Statement
The potential quantity and grade of the Exploration Targets set out in Table 1 is conceptual in nature. There
has been insufficient exploration in the target areas to date, to estimate a Mineral Resource and it is
uncertain if further exploration will result in the estimation of a Mineral Resource. The Exploration Target
has been prepared and reported in accordance with the 2012 edition of JORC Code.
Exploration to Date
The Red Mountain claim block has had substantial exploration to date, including an 819-point soil
sampling campaign, conducted at 400m-spaced east west lines covering the majority of the project
area, with 100m-spaced sampling points along those lines20
.A total of 250rock chip samples have been
collected over several campaigns21-23
. These rock chip samples are from outcropping or shallowly
subcropping rocks.
Drilling comprising 32 diamond and RC drill-holes has been completed on the project1-14
. Two of these
holes were collared in the Exploration Target area. These holes, RMRC010 and RMRC011, were both
located in Exploration Target Area H, and both intersected significant lithium mineralisation3
.
Geological mapping has been completed over the claim block area23
.
4
newmurchgold.com.a
RMRC010: 33.5m @ 1,260ppm Li / 0.67% LCE from 19.8m
30.5m @ 898ppm Li / 0.48% LCE from 74.7m
RMRC011: 44.2m @ 905ppm Li / 0.48% LCE from Surface
48.8m @ 834ppm Li / 0.44% LCE from 51.8m
13.7m @ 1,260ppm Li / 0.67% LCE from 120.4m to End of Hole
Red Mountain Extension Exploration Target
The Red Mountain Extension Exploration Target comprises two distinct areas labelled I and J, both of
which are located on the Red Mountain Extension Claim block (Figures 1 to 4).
Basis for Exploration Target
The basis for digitising the Exploration Target areas is surface sample geochemistry and mapped
geology20-24
. Coherent zones of >50ppm Li anomalism in soils were digitised across rock types deemed
prospective for sedimentary lithium mineralisation, taking into account the presence of alluvium that
may mask prospective bedrock. Target Areas I and J have surface areas of 2.48 and 0.24km2
,
respectively.
To establish the upper target tonnage ranges, a nominal density of 2g/cm3
and a depth extent of 200m
was applied, with the lower tonnage range is calculated as 75% of the upper tonnage range. The lower
grade range is equal to the 50th
percentile value of all 1,790 drill samples assaying ≥500ppm Li on the
Project to date (1,035ppm Li), rounded to the nearest 100ppm (1,000ppm Li)1-14
. The upper grade range
is equal to the 70th
percentile value of all drill samples assaying ≥500ppm Li on the Project to date
(1,335ppm Li), rounded to the nearest 100ppm (1,300ppm Li).
Exploration
Target Area
Claim Block
Tonnage
(Mt)
Grade (ppm
Li)
Grade (%
LCE)
LCE (kt)
I Red Mtn Ext. 744 - 992 1,000 – 1,300 0.53 - 0.69% 3,960 – 6,865
J Red Mtn Ext. 72 - 97 1,000 – 1,300 0.53 - 0.69% 386 - 668
Total Red Mtn Ext. 816 – 1,089 1,000 – 1,300 0.53 - 0.69% 4,346 – 7,533
Table 3. Exploration Target for the Red Mountain Extension Claim block
Cautionary Statement
The potential quantity and grade of the Exploration Targets set out in Table 1 is conceptual in nature. There
has been insufficient exploration in the target areas to date, to estimate a Mineral Resource and it is
uncertain if further exploration will result in the estimation of a Mineral Resource. The Exploration Target
has been prepared and reported in accordance with the 2012 edition of JORC Code.
Exploration to Date
The Red Mountain Extension claim block has had substantial exploration completed to date, including
a 297-point soil sampling campaign, conducted at 400m-spaced east west lines covering the entirety
of the claim block area, with 100m-spaced sampling points along those lines24
. A total of 9 rock chip
samples have been collected from the Red Mountain Extension24
. These rock chip samples are from
outcropping or shallowly subcropping rocks. Geological mapping has been completed over the claim
block area23
.
5
newmurchgold.com.a
Figure 1. Red Mountain and Red Mountain Extension soil sample geochemistry, MRE and Exploration Target Areas
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 1 is conceptual in nature.
There has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Target has been prepared
and reported in accordance with the 2012 edition of JORC Code.
6
newmurchgold.com.a
Figure 2. Red Mountain and Red Mountain Extension mapped geology, MRE and Exploration Target Areas
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 2 is conceptual in nature.
There has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Target has been prepared
and reported in accordance with the 2012 edition of JORC Code.
7
newmurchgold.com.a
Figure 3. Rock chip geochemistry, MRE and Exploration Target Areas over gridded soil sample geochemistry image
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 3 is conceptual in nature.
There has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Target has been prepared
and reported in accordance with the 2012 edition of JORC Code.
8
newmurchgold.com.a
Figure 4. Exploration drill intersections on Exploration Targets, MRE, and Exploration Target Areas
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 4 is conceptual in nature.
There has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Target has been prepared
and reported in accordance with the 2012 edition of JORC Code.
9
newmurchgold.com.a
Exploration Target Summary
The Company has calculated separate Exploration Targets for the Red Mountain claim block and Red
Mountain Extension claim block, which together form a combined Red Mountain Lithium Project
Exploration Target (Table 4). Grade ranges are provided as Lithium (ppm) and Lithium Carbonate
Equivalent weight percent (% LCE).
Exploration
Target
Tonnage (Mt) Grade (ppm Li) Grade (% LCE) LCE (Mt)
Red Mountain 1,200 – 1,600 1,000 – 1,300 0.53 - 0.69% 6.39 – 11.1
Red Mtn Ext. 816 – 1,090 1,000 – 1,300 0.53 - 0.69% 4.35 – 7.53
Project 2,020 – 2,690 1,000 – 1,300 0.53 - 0.69% 10.7 – 18.6
Table 4. Combined revised Exploration Target for the Red Mountain Lithium Project
Cautionary Statement
The potential quantity and grade of the Exploration Targets set out in Table 1 is conceptual in nature. There
has been insufficient exploration in the target areas to date, to estimate a Mineral Resource and it is
uncertain if further exploration will result in the estimation of a Mineral Resource. The Exploration Target
has been prepared and reported in accordance with the 2012 edition of JORC Code.
Planned Forward Exploration
The Company has developed the following plans to systematically explore the Red Mountain and Red
Mountain Extension Exploration Targets.
Red Mountain Claim Block
In 2026 the Company intends to conduct exploration drilling on target areas B, D, E and H, and conduct
rock chip sampling on target areas A, C, F and G. Assuming the rock chip sampling results warrant
drilling, the Company intends to drill target areas A, C, F and G in 2027.
Red Mountain Extension Claim Block
The Red Mountain Extension claims are located on a Wilderness Study Area (WSA), where surface
disturbance is not currently permitted. However, the WSA has been recommended for return to
multiple uses (which would allow for ground disturbing exploration) by the Federal Bureau of Land
Management, although this requires an Act of Congress in order to come into effect.
A Nye County Public Lands Bill is currently being drafted. If the bill is passed by Congress in its current
form, this would result in ground-disturbing exploration being allowed on the Red Mountain Extension
Claim Block. The Company has expressed its support for the Lands Bill and will seek to rapidly advance
the Red Mountain Extension area if and/or when this occurs.
Given the above, the Company intends to continue rock chip sampling activities on target areas I and J
in 2026 with a plan to commence drilling as soon as ground disturbing exploration is permitted on the
Red Mountain Extension Claim Block.
10
newmurchgold.com.a
Next Steps
The Company is well-progressed in finalising drill-hole designs for the 2026 drilling campaign at the Red
Mountain Project which is proposed to commence after the Nevada winter.
The Company intends to conduct in-fill drilling, to upgrade part of the MRE from the Inferred to the
higher-confidence Indicated category, undertake extensional drilling, to increase the size of the MRE
and commence exploration drilling to test new areas of potential mineralisation to expand its
exploration and growth pipeline at the Project.
Figure 5. Location of Red Mountain and other Nevada Lithium projects.
11
newmurchgold.com.a
References
Drilling Results
1 - ASX: ASE, 18 June 2024, Significant lithium discovery at the Red Mountain Project
2 - ASX: ASE, 22 July 2024, Further high-grade lithium intersections at Red Mountain
3 - ASX: ASE, 7 August 2024, Receipt of final assays for the Red Mountain Lithium Project
4 - ASX: ASE, 16 December 2024, Signficant new zones of lithium mineralisation discovered at Red Mountain Project, USA
5 - ASX: ASE, 20 January 2025, Lithium discovery extended with exceptional 86.9-metre intercept at Red Mountain
6 - ASX: ASE, 19 May 2025, Exceptional lithium intercept extends Red Mountain discovery further to the North
7 - ASX: ASE, 29 May 2025, Two lithium zones confirmed in latest Red Mountain drill hole
8 - ASX: ASE, 25 June 2025, Widest lithium mineralisation intersected at Red Mountain
9 - ASX: ASE, 25 July 2025, Exceptional Drill-hole Intersects combined 170m of Lithium Mineralisation at Red Mountain
10 - ASX: VMS, 17 November 2025, Initial Red Mountain Assays confirm High-grade Lithium
11 - ASX: VMS, 24 November 2025, More High-Grade lithium results from Red Mountain drilling
12 - ASX: VMS, 11 December 2025, High-Grade lithium confirmed at Red Mountain North
13 - ASX: VMS, 16 December 2025, Highest-Grade lithium intersection to date at Red Mountain
14 - ASX: VMS, 12 January 2026, Final assays received and Maiden MRE advances - Red Mountain
Metallurgical Test-work
15 - ASX: ASE, 22 April 2025, Beneficiation test-work successfully upgrades mineralisation at Red Mountain
16 - ASX: ASE, 10 June 2025, Beneficiation Delivers 4,480ppm Lithium Clay Concentrate at Red Mountain
17 - ASX: ASE, 9 December 2024, Positive initial metallurgical results from Red Mountain
18 - ASX: VMS, 15 October 2025, Metallurgical test-work delivers 132% upgrade to lithium mineralisation at Red Mountain, Nevada
19 - ASX: VMS, 27 January 2026, Further positive metallurgical test-work results from Red Mountain Lithium Project
Surface Sampling
20 - ASX: ASE, 20 November 2023, Large lithium soil anomalies discovered at Red Mountain
21 - ASX: ASE, 27 November 2023 Outstanding Rock-Chip Assays at Red Mountain Project
22 - ASX: ASE, 8 July 2024, High-grade rock chip assays extend prospective lithium horizon at Red Mountain Project, USA
23 - ASX: ASE, 4 February 2025, New Zone of lithium-bearing rocks identified at Red Mountain
24 - ASX: ASE, 3 September 2025, Outstanding lithium anomalism in surface sampling at Red Mountain Extension
Other References
25 - NYSE: LAC, 31 December 2024, Updated NI 43-101 Technical Report for the Thacker Pass Project
26 - NASDAQ: ABAT, 4 September 2025, Tonopah Flats Lithium Project S-K 1300 Technical Report and Preliminary Feasibility Study,
27 - Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm)
x 5.323 /10,000
28 - ASX: VMS, 29 October 2025, Exploration Plan of Operations lodged for expanded Red Mountain Drilling
29 - ASX: VMS, 10 December 2025, Red Mountain lithium project de-risked with water rights secured
30 - ASX: INR, 2 June 2025, Ore Reserve Quadruples for Rhyolite Ridge Project
31 – ASX: VMS, 2 Feb 2026, Maiden Mineral Resource Estimate for the Red Mountain Lithium Project
12
newmurchgold.com.a
Authorisation
This announcement has been authorised for release by the Board of Venari Minerals NL.
Join the Venari Minerals Investor Hub
Engage with Venari Minerals through accessing reports, presentations, interviews
and other Company content. Ask Questions and browse responses to other
investors’ questions. Click here and follow the prompts to sign up.
For further information, please contact:
Matthew Healy Nicholas Read
Executive Director & CEO Media & Investor Relations
T: +61 (0) 431 683 952 T: +61 (0) 419 929 046
E: matt@venariminerals.com E: nicholas@readcorporate.com.au
Exploration Targets
The information in this report that relates to Exploration Targets is based on information compiled by
Mr. Richard Newport, principal partner of Richard Newport & Associates – Consultant Geoscientists.
Mr. Newport is a member of the Australian Institute of Geoscientists and has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person under the 2012 Edition of the
’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves‘. Mr.
Newport consents to the inclusion in this announcement of the matters based on this information in
the form and context in which it appears.
This revised exploration target included in this release is wholly based on previously announced
exploration results for the Red Mountain Project. The ASX releases for these results, including the
relevant JORC Table 1 disclosures, are listed as follows:
• ASX: ASE, 20 November 2023, Large lithium soil anomalies discovered at Red Mountain
• ASX: ASE, 27 November 2023 Outstanding Rock-Chip Assays at Red Mountain Project
• ASX: ASE, 8 July 2024, High-grade rock chip assays extend prospective lithium horizon at Red
Mountain Project, USA
• ASX: ASE, 4 February 2025, New Zone of lithium-bearing rocks identified at Red Mountain
• ASX: ASE, 3 September 2025, Outstanding lithium anomalism in surface sampling at Red
Mountain Extension
• ASX: ASE, 7 August 2024, Receipt of final assays for the Red Mountain Lithium Project
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a full-time employee
of Venari Minerals NL and is eligible to participate in share-based incentive schemes of the Company.
Mr Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
13
newmurchgold.com.a
and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) and Mineral
Resource Estimates is based on information compiled by Mr. Richard Newport, principal partner of
Richard Newport & Associates – Consultant Geoscientists. Mr. Newport is a member of the Australian
Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person under the 2012 Edition of the ’Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves‘. Mr. Newport consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
Mineral Resource Estimates
Where the Company references previously disclosed Mineral Resource Estimates it confirms that the
relevant JORC Table 1 disclosures are included with the original referenced ASX Announcements and
that it is not aware of any new information or data that materially affects the information included in
those ASX Announcements and in the case of Mineral Resources, that all material assumptions and
technical parameters underpinning the estimates in the Announcements continue to apply and have
not materially changed.
Area Category Tonnes (Mt) Li (ppm) LCE (%) LCE (Mt)
North Inferred 91.6 1,618 0.86% 0.79
Central Inferred 408 1,031 0.55% 2.24
TOTAL Inferred 500 1,139 0.61% 3.03
Table 5. Red Mountain maiden MRE at the preferred reporting cut-off grade of 700ppm Li.