Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
28 July 2023
QUARTERLY REPORT – 30 JUNE 2023
Transformational quarter with successful capital raising
company rebrand and progress across Astute’s asset base
– creating a strong platform for value creation
Highlights
•
•
•
•
Lithium Nevada, USA
•
Strong start to Astute’s maiden 4,000ft (1,220m) drilling program at the Polaris and
Altair Projects.
•
Lithium-bearing Siebert Formation claystone intersected in all assayed holes at
Polaris.
•
Highly anomalous lithium intersected in Hole PL01 with potential for higher grades in
the vicinity.
•
Polaris and Altair located near outcropping tertiary sedimentary host rock units that
are known to host major claystone lithium deposits around Nevada.
•
Drilling resumed at the end of the quarter following a short pause, with a pivot to
deeper drilling.
•
Astute’s Nevada lithium footprint currently being expanded with further details
expected shortly.
Governor Broome Mineral Sands Project, WA
•
In-fill drilling successfully completed with the drilling of the eastern portion of the Jack
Track Deposit.
•
The program totalled 502 holes•across the four deposits for a combined 5,351 metres.
•
Assay results to be incorporated in a Mineral Resource update scheduled for Q3 2023.
•
Scoping Study scheduled for Q1 2024.
Georgina Basin
•
Geophysical Gravity and HVSR Passive Seismic surveying completed over the Ranken
Project, paving the way for drill target definition.
•
Additional gravity data acquired to complement existing datasets.
•
Co-funding grants secured in Round of 16 of the Northern Territory Geological Survey
Geophysics and Drilling Collaborations Program- value of $261,106.
Corporate
•
Successful capital raising completed, comprising a $3.5 million, two-tranche
placement and $0.4 million Share Purchase Plan (SPP).
•
Simplification of the Board structure and name change to Astute Metals NL reflecting
the Company’s reinvigorated and streamlined business strategy and focus on
employing astute business practices to create shareholder value
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) and formerly known as “Astro Resources
NL” is pleased to report on exploration and development activities across its projects in Australia and the
USA for the period ended 30 June 2023.
Lithium interests
Polaris and Altair Projects
The Polaris and Altair Projects were staked by the Company in Q3 2022 following a systematic review of
regional open file data, such as mapped geology, topography, stream sediment geochemistry, land
administration and an assessment of suitable claim-free areas.
Figure 1. Project Locations and lithium deposits.
Figure 2. Project locations and select neighboring projects
The projects are located in the southern extent of the Big Smoky Valley, south-west of the township of
Tonopah, Nevada, in the heart of one of the world’s most active lithium exploration districts. The Polaris
and Altair Projects are located proximal to outcropping tertiary sedimentary host rock units (the Ts3)
that are known to host claystone lithium deposits around Nevada.
Nevada hosts a number of large claystone-hosted lithium deposits and is home to North America’s only
lithium mining operation, Albermarle’s Silver Peak lithium brine operation. Other major deposits in the
district include Ioneer’s (ASX: INR) Rhyolite Ridge Project3 and Lithium America’s Thacker Pass deposit, the
largest lithium deposit in North America4.
Close to the Polaris and Altair projects, the Siebert formation hosts large claystone lithium deposits,
including American Battery Technology Corporation’s (OTCMKTS: ABML) 15.8Mt Lithium Carbonate
Equivalent (LCE) Inferred category Tonopah Flats Lithium Clay Deposit1 and American Lithium
Corporation’s (TSX.V: LI) 9.79Mt LCE Measured and Indicated category TLC Lithium Project2.
Claystone Lithium Deposits
Claystone hosted deposits differ from hard-rock pegmatite deposits (such as are common in Australia)
in that they form in soft rocks, with a semi-tabular shape that can be both strike extensive and thick.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
If situated at surface or under shallow cover, this tabular morphology may facilitate low strip-ratio
mining. Processing of ore from claystone hosted deposits does not require roasting and is therefore less
energy intensive. These differences result in lithium claystone projects having lower production costs
than most hard-rock spodumene projects3,4.
Work During the Quarter
During the quarter, the Company actively progressed its strategy to establish a significant portfolio of
lithium claystone projects in Nevada USA. In April 2023, the Company commenced drilling of a maiden
8-hole, 4,000ft (1,220m) air-core program at the recently staked Polaris and Altair Lithium Projects.
Figure 3. Planned hole location map – Altair Project.
The vertical-hole campaign was designed to test for lithium mineralisation in prospective Siebert
formation claystone host rocks, which hosts two lithium mineral resources north of Astute’s projects. The
drilling was designed as an early ‘scout’ program to establish the presence of lithium-in-clay
mineralisation at strategic locations on the project areas, with results to dictate subsequent exploration
drilling at the projects.
Assays from initial scout drill-holes confirmed that the prospective Siebert Formation intersected is
highly anomalous for lithium mineralisation. Key intersections to date in the campaign are as follows:
PL01 intersected 40 feet (12.2m) at 145ppm Li from 425 feet (129.5m) within a broader Siebert Formation
anomalous zone of 225 feet (68.6m) at 70.1ppm Li.
PL04 intersected 10 feet (3.05m) at 140.8ppm Li from 505 feet (153.9m) to end-of-hole.
PL02 final sample of 5 feet (1.52m) at 261ppm Li from 505 feet (153.9m) to end-of-hole.
The presence of highly anomalous lithium in all three holes assayed is considered to be an excellent
result for the Company’s initial foray into lithium clay exploration in Nevada. In particular, the increasing
lithium grade seen towards the end-of-hole in both PL02 and PL04 (see section below) is interpreted as
highly prospective, and an indication that drilling may have stopped short of a higher-grade zone of
lithium mineralisation. Testing of this concept has warranted an immediate return to drilling at these
sites.
A re-drill strategy was put into place given that the depth of drilling at these initial sites was limited by
the rig configuration at the time.
Renewed plans to continue drilling at Polaris, following the receipt of exciting initial assays, include drilling
to 700 feet (213.4m) at PL02 and PL04 as well as PL03, which was terminated during the quarter, due to
poor ground conditions.
Drilling re-commenced at the end of the quarter at Polaris, executing this re-drill strategy. Drilling of the
three planned holes at Altair will now take place once the rig has completed drilling at Polaris.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 4. Schematic cross-section of Polaris holes, Siebert Formation host rocks and lithium assay results.
Siebert Formation
The Miocene-aged Siebert Formation, the local name for the Ts3 sedimentary rocks mapped across
Nevada, is composed of tuffaceous, fine-grained, calcareous lacustrine (lake) sediments. Internal thin
gravel beds are observed within the broader claystone-dominant sedimentary package.
Lithium mineralisation is not evenly distributed throughout the Siebert, with parts of the formation being
only anomalous while other parts have high-grade zones that have been intersected by other explorers.
The Siebert Formation is known to host two of the largest lithium resources in the United States –
American Battery Technology Corporation’s 15.8Mt LCE Tonopah Flats deposit1 and American Lithium
Corporation’s 9.79Mt LCE TLC Lithium project2.
Initial assay results clearly indicate that the Polaris Project has highly anomalous lithium mineralisation
within the Siebert Formation and that further drilling is required to evaluate the project area. Below are
chip tray samples of the Siebert formation claystones:
Figure 5. Chip trays of 5-foot intervals of Siebert Formation claystones
intersected in hole PL01 from 425-645 feet (end-of-hole).
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
CAUTIONARY STATEMENT ON VISUAL ESTIMATES OF MINERALISATION
References in this announcement to visual results are from geological logging of percussion chip
samples from aircore drilling. The claystone-dominant lithology intersected in drilling is interpreted to
be the Siebert formation, a claystone-dominant formation in which claystone lithium deposits are
observed to form elsewhere in the region. Visual estimates are based on geological logging and thus
are preliminary in nature. No attempt is made to predict the lithium content of the intersected claystone
and laboratory assays are required to determine the presence of lithium mineralisation. Representative
samples from select parts of the intervals that have intersected the interpreted Siebert formation have
been despatched to a third-party Laboratory for analysis.
Expansion of Lithium Footprint
During the quarter, work continued on identifying new areas to expand the Company’s footprint. The
Company was in the process of securing new areas and further details will be provided during Q3 2023.
Governor Broome Mineral Sands Project, WA
Project Overview
The 100%-owned Governor Broome Mineral Sands Project is located approximately 95km by sealed road
south of Busselton, 105km south of Iluka’s processing plant at Capel, and 135km from Bunbury Port and
from Picton, where Doral has a heavy mineral separation plant.
Figure 6. Governor Broome Project Location, WA.
A 132kV power line is located just 5km to the north and a three-phase power line passes through the
Governor Broome Project, giving it significant strategic advantages from an infrastructure and access
perspective. The Project Mineral Resources are summarised in Table 1. The resources were reported in
detail to the ASX on 19th September 2022 (ASX: ARO).
Work During the Quarter
During the quarter, the Company took further important steps to progress development studies for the
Governor Broome Project. The Governor Broome Project tenements and resources are shown on Figure
7.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Tenement
Category
Tonnage
HM
Slimes
Oversize
(Mt)
(%)
(%)
(%)
R70/58 - Jack
Indicated
26
4.0
8.6
7.1
Track
Inferred
43
4
9
3
R70/53 - Governor
Indicated
52
4.8
13
8.5
Broome
Inferred
6
4
15
6
Project
Indicated
78
4.5
11
8.0
Project
Inferred
48
4
10
4
Project
Total Resources
126
4.3
11
Note that the above figures have been appropriately rounded
6.5
Table 1. Governor Broome Project Resources – at 2% HM lower block-cut-off grade
Figure 7. Governor Broome Project Resources and Licences.
In-fill drilling was completed across the four areas of Inferred Mineral Resources within R70/58, including
the eastern zone of the high-value Jack Track Deposit. The drilling was designed to upgrade these
Inferred Resources to the higher confidence Indicated Resource status.
The programme comprised 502 air-core holes for 5,351m, with 3,083 samples delivered for assay
The Jack Track Deposit, the western portion of which contains an Indicated Resource of 26Mt @ 4.0% HM
(see Figure 7), has a high-value mineral assemblage, with testwork results announced in November
2022 revealing a Heavy Mineral Assemblage containing 96.5% valuable Heavy Minerals, including 10.5%
zircon and 85.5% titanium minerals, with the primary ilmenite containing 58% TiO21.
The additional drill data collected as part of the program is required in order to upgrade Mineral
Resource estimates for these areas from Inferred to Indicated categorisation. The estimation of an
upgraded Mineral Resource is an important prerequisite for unlocking the value in the Governor Broome
Project as part of a Scoping Study scheduled for Q1 2024.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Resource and Project Development Timeline
With the completion of the final section of the in-fill drilling program, laboratory results, which include
Heavy Mineral grades, for drill samples from Jack Track East are expected to be received by the end of
Quarter 3, 2023.
Once these results have been returned to the Company, Mineral Assemblage analysis will be undertaken.
An updated Mineral Resource Estimate will be undertaken once these results have been returned, which
is anticipated to be complete by the end of August. These milestones will allow the Company to embark
on a Scoping Study, to be completed in Q1 2024.
The updated Mineral Resource is an important prerequisite to unlock the value of the Governor Broome
Project as part of a Scoping Study scheduled for Q1 2024.
Georgina Basin, Northern Territory IOCG Project
Project Overview
Located in the highly prospective East Tennant province in the Northern Territory, the Georgina Project,
which is 80% owned by the Company and the remaining 20% is owned by Greenvale Energy Limited (ASX:
GRV), comprises seven granted Exploration Licences and three under application, for a combined total
of approximately 4,500km.
The East Tennant province has been the subject of intense geoscientific investigation by both
Geoscience Australia and the Northern Territory Geological Survey for over five years. Pre-competitive
work undertaken as part of the Federal Government’s $225 million Exploring for the Future program (EFTF)
included solid geology interpretation, alteration proxy mapping and mineral prospectivity mapping for
Iron Oxide Copper Gold (IOCG) deposits; and
The collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the highly
prospective nature of the region by intersecting prospective host rocks, IOCG-style alteration and
sulphide mineralisation as part of a 10-hole program at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some smaller highgrade variants – most notably those at Tennant Creek. This style of deposit contains elevated levels (1060wt %) of the iron oxide minerals magnetite and hematite, which gives rise to their (typically) elevated
magnetic and gravity (density) properties.
Australian IOCG’s include the South Australian Olympic Dam, Prominent Hill, and Carrapateena deposits,
Ernest Henry in north-west Queensland, and the high-grade Northern Territory Warrego and Juno
deposits, located west of the Georgina Project at Tennant Creek.
In the December 2022 quarter, Astute acquired 80% of the Georgina Basin owned by a company called
Knox Resources Pty Ltd (Knox) from Greenvale Energy Limited (ASX: GRV or Greenvale). Knox is the 100%
owner of the Georgina Project tenements project. The key terms of the acquisition were set out in the
Company’s announcement of 1 June 2023.
Work During the Quarter
EL33375 Gravity Surveying
During the quarter, the Company commenced a gravity surveying across its highly prospective Central
Georgina Project tenement EL33375. The prospect-scale gravity survey is designed to enhance gravity
data resolution between recent drilling and previous National Drilling Initiative drill-holes, as well as to
align with coverage of the forthcoming Ambient Noise Tomography (ANT) survey, which is one of two
recently awarded Exploration Grants as part of the NT Government’s Resourcing the Territory Geophysics
and Drilling Collaborations Program.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 8. Georgina IOCG Project and general gravity survey Location
Previous prospect-scale gravity surveying in this area, conducted by the previous operator Greenvale
Energy Ltd (ASX: GRV) resulted in the generation of three distinct IOCG targets, namely Banks, Leichhardt
West and Leichhardt East, all of which were drill tested in mid-late 2022.
The drill-holes intersected variably altered metasedimentary rocks, with assay results revealing
significant anomalism in copper, as well as uranium, silver and bismuth, which are known to be
associated with IOCG deposits.
Figure 9. Existing prospect-scale gravity imagery, planned in-fill gravity stations
and Ambient Noise Tomography (ANT) survey outline.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
The gravity stations are strategically located to improve the resolution of gravity data between the
existing datapoints, extended both to the north and south to incorporate drill-holes NDIBK05 and NDIBK10
which were drilled by Minex CRC as part of the inaugural National Drilling Initiative (NDI) drill program in
2020.
This drill program was the culmination of many years of investment and work by Geoscience Australia
and the NT Geological Survey, and resulted in confirmation that the East Tennant region is highly
prospective for IOCG deposits. By extending coverage to the NDI holes, this will allow the Company to
incorporate drilling data from those locations into the broader interpretation for the region, leveraging
the additional information into future interpretations.
The results of the survey and the ANT survey will be fundamental to guiding future work and are expected
to result in the identification of further drill targets in this highly prospective region. The 548-station
survey is due to be completed within a week.
Ranken Geophysical Surveying
During the quarter, the Company completed geophysical surveying at its Ranken Project area, in the
eastern part of its Georgina IOCG Project in the Northern Territory. The commencement of the survey
followed the recent release of Geoscience Australia’s National mineral potential for sediment hosted
zinc-lead mineral systems in Australia mapping and extended abstract, which highlights the Ranken
Project area as being highly prospective for sediment-hosted base metal mineralisation.
The geophysical surveying, which was co-funded by the NT Government Resourcing the Territory
initiative, was designed to identify gravity (density) anomalies and establish depth to prospective
basement rocks.
The Ranken Project area is located to the east of the main part of the Georgina Project, close to the NTQueensland border. Possessing different interpreted basement geology, the Ranken area is interpreted
to cover host-rocks prospective for sediment-hosted base metal deposits such as the world-class
Century and Mount Isa deposits.
The completion of geophysical surveying at Astute’s Ranken Project area, in the eastern part of its
Georgina IOCG Project in the Northern Territory. Data from the two-part survey, which comprised both
gravity and HVSR Passive Seismic surveying, is being processed to allow for interpretation over the
coming months.
This interpretation will be used to guide the final design and collar location for the Company’s first drillhole at the Ranken Project, which was also the subject of a recently awarded Exploration Grant as part
of Round 16 of the NT Government’s Resourcing the Territory Geophysics and Drilling Collaborations
Program.
In mid-March 2023, there was a release of new nationwide mineral potential maps from Geoscience
Australia, which assesses for the prospectivity of four types of sediment-hosted base metal mineral
systems across Australia.
Astute previously highlighted the prospectivity of the Ranken Project area (EL32285 and EL32286 in Figure
10) for Century-style and Mount Isa-style sediment hosted deposits, and confirmation of this assessment
by Geoscience Australia further strengthens the rationale underpinning the geophysical gravity and
HVSR passive seismic surveys. The mapping, shown in Figure 10, predicts mineral potential via a ‘heat
map’ style whereby the hotter the colour the more prospective the area.
The study assessed for potential for clastic-dominated siliciclastic carbonate, clastic-dominated
siliciclastic mafic, Mississippi Valley-type and Irish type sediment hosted deposits, using a Mineral
Systems approach which considers the source of metals and fluids, energy sources and fluid flow drivers,
fluid flow pathways and depositional mechanisms.
The Ranken area is most prospective for the clastic-dominated sub-type of deposits, with major
deposits including Hilton-George Fisher (24.2Mt contained Zn and 12.4Mt contained Pb), Century (13.7Mt
contained Zn and 2.0Mt contained Pb) and Mount Isa Zn-Pb (10.5Mt contained Zn and 9.0Mt contained
Pb)1. Each of these deposits also contain significant silver.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 10. Georgina IOCG Project tenements and Geoscience Australia
mineral potential ‘heat map’, with hotter colours more prospective - noting
Ranken Project tenements EL32285 and EL32286 to the far east of the project.
Northern Territory Government Co-funding Grants
During the quarter, the Company was awarded two co-funding grants through the Geophysics and
Drilling Collaborations (GDC) program, which is administered by the Northern Territory Geological Survey
(NTGS). The Company took part in the Round 16 Geophysics and Drilling Collaborations program, with
the following successful applications having been made:
•
Grant 1 is for $100,000 toward an Ambient Noise Tomography (ANT) survey on the Central
tenement area EL33375, where recent drilling intersected copper and uranium mineralisation;
and
•
Grant 2 is for $161,106 (representing 50% of eligible drilling costs) towards a 700m deep drill hole
at the Company’s Ranken area
Needles Gold Project, Nevada
No work was undertaken during the quarter on the Needles Gold Project.
East Kimberley Diamond Project
The Company announced suspension of a spin-off and that it is now re-assessing its strategy.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Corporate
Capital raising
During the quarter, the Company undertook the following capital raising initiatives:
Placement
The Company completed the following placements for fully paid ordinary shares (Shares) in the
Company before costs, at a price of 5.3 cents per Share, which have contributed to improving its financial
position:
Tranche 1 - Sophisticated Investors, totalling 66,628,404, raising a total of $3,531,305; and
Tranche 2 to the entities/persons listed below, which is to be settled following shareholder approval
(received on 17 July 2023):
•
•
•
a further issue to Sophisticated Investors of 7,307,692 Shares, to raise a total of $387,308;
8,490,566 Shares to the Directors to raise a total of $450,000; and
9,615,384 Shares to substantial shareholder, Mining Investments raise $509,615
Share Purchase Plan
In conjunction with the above, the Company made an offer to eligible shareholders who held shares in
the Company at 5 on 5 April 2023 (Record Date) to apply for up to $30,000 worth of Shares an issue price
of $0.054 per share (New Shares) under a SPP.
Despite the fact that the Company’s share price traded below the SPP offer price for most of the time
during the offer period, the SPP received solid support from eligible shareholders with a total of 25
individual shareholders participating raising a total of $416,000. The Directors participated in the SPP.
Change in Company name
The Company announced that it intended to change its name from “Astro Resources NL” to Astute Metals
NL, subject to shareholder (received on 17 July 2023).
The decision to change the name follows a number of important corporate and strategic developments
at the Company, including:
the expansion of the Company’s portfolio of highly prospective claystone-hosted lithium exploration
licences in Nevada, USA. This follows the appointment of highly respected lithium industry executives
Tony Leibowitz and John Young respectively as Executive Chairman and Non-Executive Director, to help
drive the Company’s North American lithium strategy;
substantial progress with the Governor Broome Mineral Sands Project in WA, which is advancing towards
a Scoping Study, and the Georgina Basin IOCG Project in the Northern Territory; and
a clearly articulated strategy to focus on exploring for and developing critical minerals required for
electrification and the global energy transition (notably, lithium and copper) while crystallising value
from other strategic assets such as the Governor Broome Project in WA.
The proposed new name is considered to reflect the Company’s core focus on astute business
development and growth activity, with an emphasis on optimising the risk/reward profile of its asset
base and unlocking value for shareholders.
Board and management appointments
Retirement of Jacob Khouri
During the quarter, Mr Jacob Khouri retired from the board. This was part of the Board’s strategy to
simplify the Company.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
ASX Additional Information
The Company provides the following information pursuant to ASX Listing Rule requirements:
1.
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was
$1,793,410. Full details of exploration activity during the 30 June 2023 quarter are set out in this
report.
2.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and
development activities for the quarter.
3.
ASX Listing Rule 5.3.5: Payment to related parties of the Company and their associates during
the quarter was $232,332 in cash.
The Company advises that this relates to remuneration of Directors only. Set out below is the following
additional information in relation to the cash flow statement:
Name of
Nature of Payment
Director
Amount ($)
[excluding any GST]
Tony Leibowitz
Ongoing Executive Chairman fees
75,000
John Young
Ongoing Non-Executive Director fees
14,500
Vincent Fayad
Executive Director and Company
111,000
Secretarial and Chief Financial Officer (6
months)
Jacob Khouri
Resignation benefit and superannuation
31,832
entitlements
Total
232,332
Table 2. Director’s remuneration
Tenements
In accordance with Listing Rule 5.3.3, Astute provides the following Information concerning its exploration
licences.
Appendix 1 sets out a list of the Company’s exploration licences held at the end of the quarter.
End Notes
The information contained in this announcement related to the Company’s past exploration results is
extracted from, or was set out in, the following ASX announcements which are referred to in this Quarterly
Activities Report:
References
Information contained in this announcement in relation to this transaction relates to past exploration
results is extracted from, or was set out in, the following ASX announcements which were all published
under the name “Astro Resources NL”, ASX code ARO:
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Date of
Name of announcement
announcement
4 April 2023
Astro Board Reorganisation and Incentivised
Remuneration Structure
6 April 2023
Astro completes $4.8 million Share Placement and
Launches a Share Purchase Plan
24 April 2023
Strong Progress with infill drilling underpins value
creation pathway
26 April 2023
Maiden Drilling Program Commences at Highly
Prospective Nevada Lithium-Clay Projects
4 May 2023
Key Infill Drilling Program at Governor Broome
Mineral Sands Project Is Complete
15 May 2023
Significant Zones of Prospective Lithium Claystone
Host Rocks Intersected in Initial Drilling Polaris
Project, Nevada USA
22 May 2023
Geophysical Survey Commences Targeting Base
Metal Potential At Rankin Project
25 May 2023
Completion of Share Purchase Plan
5 June 2023
Georgina IOCG Project Awarded Norther Territory
Exploration Co Funding
21 June 2023
Gravity Survey Commences At Georgina
27 June 2023
Strong Lithium Anomalism In Initial Nevada Assay
As Drilling Resumes
Table 3: Summary of announcements
References in this report to public third-party announcements are as follows;
OTCMKTS: ABML 26 February 2023 ‘Technical Report Summary For The Tonopah Flats Lithium Project,
Esmeralda..’
2
TSX.V:LI 17 March 2023 ‘Tonopah Lithium Claims project NI 43-101 technical report – Preliminary Economic
Assessment’
3
ASX: INR 30 April 2020 ‘Ioneer Delivers Definitive Feasibility Study.’
4
TSX: LAC 31 January 2023 ‘GM and Lithium Americas top Develop US-sourced Lithium Production’
1
Authorisation
This announcement has been authorised for release by the Board of Astute.
More Information
Tony Leibowitz
Executive Director
tleibowitz@astutemetals.com
+61 (0) 410 687 910
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Competent Persons
The information in this report that relates to:
Polaris and Altair
The information in this report that relates to Polaris and Altair project Sampling Techniques
Share your feedback
Discover