Governor Broome Mineral Sands Project- Scoping Study
Released
Released
Announcement PDF
4 April 2024
OUTSTANDING SCOPING STUDY RESULTS FOR
GOVERNOR BROOME MINERAL SANDS PROJECT
Key Study Highlights:
•
Economically robust 10-year dredge mining project
producing zircon, chloride and sulfate-grade Ilmenite,
rutile, garnet and a rare earth mineral concentrate
through third-party toll treatment of the Heavy
Mineral Concentrate.
•
Scoping Study has outlined a project boasting strong
returns and a positive valuation
•
Third-party toll treatment of the Heavy Mineral
Concentrate will be used to increase the value of the final
products.
•
Opportunities for substantial upside in assaying low-grade
overburden and undertaking exploration along strike from
the Fouracres deposit and north-east of the Jack Track
deposit.
•
Outcomes warrant advancement of the Governor Broome
Project to a Pre-Feasibility Study.
.
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report exceptionally positive
results from an updated Scoping Study (“2024 Scoping Study") which was undertaken following the
November 2023 Mineral Resource Estimate update for the Governor Broome Heavy Mineral Sands
Project (“Governor Broome Project” or “the Project”), located in the South West of Western Australia.
The 2024 Scoping Study evaluates mining and processing options for the Governor Broome Project and
updates the study previously published in 2018. Key outcomes from the 2024 Scoping Study are
presented in this announcement, together with the underlying material assumptions.
The Scoping Study was undertaken by leading international Heavy Mineral Sands consultancy group,
TZMI, using results and data provided by Astute, those of other explorers/developers and incorporating
the extensive experience and knowledge of the Mineral Sands sector that TZMI are renowned for.
The purpose of the study was to assess the economic viability of the project at a Scoping Study level,
which would in turn assist the Company in establishing the next steps for the Project and to optimize
value-creation for shareholders in alignment with Astute’s long-term strategic direction as a critical
metals explorer.
Astute Chairman, Tony Leibowitz, said:
“The completion of this Scoping Study marks a critical milestone in our value-realisation strategy
for the strategically located Governor Broome Mineral Sands Project. The base-case scenario of a
10-year mine life at a mining rate of 7.6 million tonnes-per-annum, using low-cost dredge mining,
highlights the robustness of Governor Broome as a potential mining project, with excellent capacity
for generating strong cash-flows and upside from further technical and exploration work.
“The Scoping Study outcomes showcase a high-quality mineral sands development opportunity in
a Tier-1 location which we believe has the potential to generate significant value for Astute
shareholders. We look forward to progressing our value-creation strategy for Governor Broome to
the next stage, building on the strong foundations established by this Scoping Study.”
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Cautionary Statement
The Scoping Study has been undertaken to ascertain whether a business case can be made to
proceed to more definitive studies on the viability of the Governor Broome Project, which is based
on the extraction of Heavy Mineral products from a Heavy Mineral Concentrate produced on-site
with toll treating of the heavy mineral concentrate to produce the final products.
According to the JORC (2012) Code, a Scoping Study is an “order of magnitude technical and
economic study”. It is based on low-level technical and economic assessments, generally to a level
of +/- 50% accuracy, that is not sufficient to support the estimation of Ore Reserves or to support
any financial investment or development decision, or to provide certainty that the conclusions of
the Study will be realised. Further exploration and evaluation work, test work and studies are required
before the Company will be in a position to estimate any Ore Reserves, to provide any assurance of
an economic development case, or to provide certainty that the conclusions of the Scoping Study
will be realised.
Pre-Feasibility and Feasibility studies will be required to confirm the project viability including drilling
to upgrade the remaining Inferred Mineral Resource to Measured or Indicated category, further
metallurgical test work and process optimisation, detailed mine design, mine planning, evaluation
of mining methods, engineering, updated and more accurate capital and operating cost estimates,
environmental studies and permitting, land access and compensation agreements, toll treating
agreements, community engagement and the establishment of ore reserves.
The Company believes it has reasonable grounds to report the results of the Scoping Study
including the forward-looking statements and the forecast financial information that are based on
the material assumptions outlined in the Scoping Study. The 10-year mine plan on which this
Scoping Study is based contains 36% Measured Mineral Resources, 60% Indicated Mineral Resources
and 4% Inferred Mineral Resources over the life of the Project. The first 5 years of mining are based
on 51% Measured Mineral Resources and 47% Indicated Mineral Resources and 2% Inferred Mineral
Resources. The Inferred Mineral Resources are not a determining factor in estimating the viability of
the Governor Broome Project.
The Project is viable on the basis of the Measured and Indicated Mineral Resources and the payback
period of the Project of less than two years post construction. There is a low level of geological
confidence with Inferred Mineral Resources and there is no certainty that further exploration work
will result in the determination of Indicated Mineral Resources or that the production target itself will
be realised. Metallurgical recoveries used in this Scoping Study are based on test work results and
industry benchmarking for the key stages of the process flowsheet.
The Scoping Study is based on the material assumptions outlined in the Scoping Study. These
include assumptions about the availability of funding. While the Company considers all the material
assumptions to be based on reasonable grounds, there is no certainty that they will prove to be
correct or that the outcomes anticipated by the Scoping Study will be achieved. To achieve the
outcomes of the Scoping Study, funding in the order of A$91 million is estimated to be required for
the Project development capital with an expected construction period of 2 years, in addition to predevelopment funding of approximately A$2.5-3 million to convert the Mineral Resources to an Ore
Reserve and to complete a Prefeasibility study.
Assuming a positive Pre-Feasibility study outcome, a Feasibility Study would also be required.
Investors should note that there is no certainty that the Company will be able to raise that amount
of funding when needed. It is also possible that such funding may only be available on terms that
may be dilutive to or otherwise affect the value of the Company’s existing shares. It is also possible
that Astute could pursue other ‘value-realisation’ strategies, such as direct financing into the
Governor Broome Project via a joint venture or partial sale. If it does, this could materially reduce
Astute’s relative ownership of the Project. Given the uncertainties involved, investors should not make
investment decisions based solely on the results of the Scoping Study.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Key assumptions and results of the study include:
The Governor Broome Project combined Mineral Resource Estimate (MRE) of 101Mt @ 4.5% HM, comprising
28.4Mt @ 4.4%HM of Measured category, 66Mt @ 4.5%HM of Indicated category and 7Mt @ 3.5%HM
Inferred category Mineral Resources. Heavy mineral recovery to HMC of 84% for Governor Broome and
88% for Jack Track. Wet concentrator plant (WCP) and Mineral Separation Plant (MSP) mineral recovery
assumptions for Governor Broome (GB) and Jack Track (JT) are tabulated below:
Mineral Product
Ilmenite:
Secondary Ilmenite:
Rutile:
Zircon:
Garnet:
Monazite:
WCP Recovery GB/JT
85% / 90%
85% / 80%
80%
90% / 98%
90%
95%
MSP Recovery GB/JT
90% / 90%
90% / 90%
75%
80% / 85%
65%
60%
The recovery assumptions for Governor Broome and Jack Track have been based on a combination of
sighter testwork results and industry benchmarks to take account of recovery gains brought about by
recirculating loads found in commercial scale plants and further flowsheet optimization work. Mining and
processing rates of 7.62Mtpa and total mine life of 10 years. Returns are most sensitive to product prices
and resource grades.
Revenue
A$ 1,254 M
Total EBITDA1
A$ 426 M
Operating cost
A$ 306/ t HMC
EBITDA Margin2
34%
Annual Average Free Cash Flow3
A$ 43 M
Initial Capex
A$ 91 M
NPV10 Pre-tax
A$ 139 M
IRR Pre-tax
54%
Capital Payback3
<2 years
Mine Life
10 years
Table 1. Key Scoping Study Outputs
Notes
1
Includes royalties and landowner compensation
2
EBITDA/Revenue
3
Post-construction
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Project Overview
The 100%-owned Governor Broome Heavy Mineral Sands Project is located in the mineral sands-rich
coastal areas of the South West of WA. The Project is accessible by sealed road and located about 95km
south of Busselton, 105km south of Iluka’s processing plant at Capel, and 135km from Bunbury Port and
from Picton, where Doral Australia has a heavy mineral separation plant. The area is well serviced by
electrical infrastructure with a 132kV line located just 5km to the north and a three-phase power line
passing through the Project.
The 2024 Scoping Study is based on the updated Mineral Resource Estimate for the Governor Broome
Project (refer ASX release 27 March 2024), associated mineral assemblage analysis and Bulk Testwork
for the Jack Track deposit (refer ASX release 23 August 2023).
The Governor Broome Project has been systematically de-risked by Astute over a number of years. Work
to date demonstrates that the Project has capacity to produce a Heavy Mineral Concentrate (HMC)
which includes a number of marketable minerals including sulfate and chloride-grade ilmenite, zircon,
rutile, garnet and monazite, which can be separated using toll-treatment by third party HMC processors.
The Project includes the Jack Track tenements, R70/58 and E70/5200, that are subject to a Royalty
agreement with Iluka Resources Ltd and the Fouracres tenement, R70/22, which is subject to a Royalty
agreement with Cable Sands Pty Ltd. A 1% gross royalty applies to the royalty agreement tenements.
The Scoping Study base case scenario was selected on the basis of assessing a number of project
development options including toll-treatment of the HMC at a nearby mineral separation plant (MSP), a
partial MSP producing ilmenite, garnet and a non-magnetic concentrate and an option to sell the HMC
to processors in China. The toll-treatment of HMC at an MSP close to Bunbury presents a low technical
risk to the project as well as having a reduced time to implementation and a lower capital cost compared
to constructing and operating an MSP on site.
Figure 1. Governor Broome Project tenement location, access and infrastructure.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
The key outputs of the Scoping Study are as follows:
Metric
Unit
A$
Capital cost
million
Average annual revenue
Average annual operating cost
Pre-tax NPV (at 10% discount rate)
A$
million
A$
million
A$
million
Pre-tax IRR
%
Weighted average revenue to cash cost ratio
(payback period)
Capital Payback Period
Value
91
125
83
139
54
1.9
Years
<2
Table 2. Scoping Study Material outputs
Geology and Mineralisation
The Governor Broome Project mineralisation is hosted in unconsolidated beach sands occurring on the
Scott River Coastal Plain. The geological character of the mineralisation is like that of other heavy mineral
deposits occurring along the Swan Coastal Plain, which have a long history of mining and processing.
The mineralisation is hosted in beach placer facies sediments of the Pleistocene aged Barlee Shore-line
on the southward facing Scott Coastal Plain. The host unit to the Jack Track Deposit mineralization – and
that of the other deposits in the eastern section of R70/58 – is the Warren Sands, which do not contain
significant clay.
Figure 2. Schematic geological cross-section.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
A sub-surface Bunbury Basalt headland is present to the west of the Jack Track Deposit (see Figure 2).
The characteristics of both the Warren Sands-hosted mineralisation and of the underlying Beenup Beds,
are markedly different on either side of the headland. To its east, both the Warren Sands and the
immediately unconformably underlying Beenup Beds of the Cretaceous Warnbro Group are very fine
grained, as are the heavy minerals.
To the west the grain sizes are larger, with most of the mineralisation within the western section of R70/58
and within R70/53 also being within the Warren Sands, but its lower portions are hosted within the Beenup
Beds. The Beenup Beds sediments are of two main facies in the area: clayey sands and organic clays.
The clayey sands contain medium- to coarse-grained, angular to sub-angular, unconsolidated quartz
and minor feldspar grains. The clay content, which is variable, tends to increase downward. Generally, it
contains between 1% and 8% of valuable HM. Common accessory minerals are garnet, pyrite, and fine
coal fragments.
Mineral Resource Estimates
Mineral Resources used as the basis for this Scoping Study are current as of the most recent Mineral
Resource Update released on 27 March 2024 and are tabulated below and shown in Figure 2. The
mineralisation that has been reported as Mineral Resources is based upon a minimum heavy mineral
content of 2% over a thickness of 2m and a maximum slimes content of 20% in any one intersection.
Figure 3. Governor Broome Project tenements and Mineral Resources.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Tenement
Category
R70/58 - Jack Track
R70/53 - Governor
Tonnage
HM
Slimes
(Mt)
(%)
(%)
Measured
20.2
4.2
8.5
Indicated
21
3.5
7.9
Total
41
3.9
8.2
Measured
8.0
5.0
13
Indicated
44
5.0
13
Inferred
7
3.5
12
Total
59
4.8
12.5
Indicated
0.72
11.4
6.5
Inferred
0.2
3.5
9
Total
0.93
9.6
7.1
Measured
28.4
4.4
9.7
Indicated
66
4.5
12
Inferred
7
3.5
12
Total Resources
101
4.5
11
Broome
R70/22 - Fouracres
Project
Table 3. Governor Broome Project Resources – at 2% HM lower block-cut-off grade2
2
Note that the above figures have been appropriately rounded.
The Fouracres Resources estimated at a 3% Heavy Mineral (HM) lower block-cut-off grade
Governor Broome and Jack Track Resources estimated at a 2% HM lower block-cut-off grade
Figure 4. Jack Track Deposit OBM coloured by HM% grade.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 5. Jack Track Deposit OBM; 363000E Cross-section coloured by HM% grade; V.E. 10:1.
Figure 6. Governor Broome West and North Deposits OBMs coloured by HM% grade.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 7. Governor Broome West and North Deposits OBMs coloured by HM% grade; 6210720N Cross-section
looking north.
Mining
The project concept for the Scoping Study assumes a combination of dry and dredge mining, as a
function of the most appropriate mining method applying to particular parts of the Mineral Resource.
Topsoil and overburden is removed and stockpiled using dry mining methods. Dredge mining would be
completed down to a maximum of 13m below the level of the dredge pond. The dredge will feed a
floating wet concentration plant (WCP) that trails behind the dredge, similar to many other mineral sand
mining operations.
The HMC would then be dewatered and stockpiled by an onshore concentrate stacker prior to being
trucked to a local MSP for toll treating. Products from this process are transported to the local port for
storage and export with the MSP waste returned to the mine. The proposed dredge paths for Jack Track
and Governor Broome are shown in Figure 8.
Dry Mining was selected for areas including Fouracres which are not suitable for dredging, as the Mineral
Resources were narrow or too far off an economic dredge path.
Limitations and assumptions on the dredge mining sequence considered appropriate for this level of
Scoping Study were:
•
Avoid large infrastructure and environmental areas, as much as possible.
•
The dredge advances using a mining strip generally 200m wide but widening up to 350m for short
zones where necessary.
•
A toe to crest angle of 30 degrees from horizontal.
•
Pillars between mining strips with 50m crest separation.
•
Where possible, mine the most profitable mineralisation early in the life-of-mine.
Fines from the WCP will be mixed with flocculant to aid the settling of the solids and immediately returned
to the dredge pond. Sand tails will be discharged from the WCP to the trailing edge of the dredge pond
void to re-establish a landform for progressive rehabilitation. The overburden will then be pushed back,
returning the ground profile to its original form.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Governor Broome
Governor
Broome Rd
Jack Track
Fouracres
Figure 8. Mine schedule dredge paths and dry-mining areas.
Production Schedule
The production schedule has been calculated based on targeting a constant mining rate of 7.6 million
tonnes per year. Other mining and processing constraints such as maximum slimes, oversize or HM rates
have not been considered in detail in this stage. The proposed production schedule for Jack Track,
Fouracres and Governor Broome are shown in Table 4.
Dry
Dredge
Mining
Mining
(Mt)
(Mt)
1.8
0.0
5.4
O/burden
Avg ore
HM
Slimes
(%)
(%)
5.3
4.1%
7.6%
1.4%
4.5
0.0
7.6
3.5%
7.7%
1.4%
4.5
4.4
0.8
7.6
3.6%
6.5%
1.4%
5.9
7.5
0.0
7.6
3.6%
7.8%
1.4%
4.8
4.1
0.0
7.0
2.5%
6.0%
1.8%
3.8
Year 6
4.6
0.0
7.6
3.7%
10.7%
2.7%
4.7
Year 7
3.6
0.0
7.6
4.3%
10.8%
2.7%
5.0
Year 8
4.5
0.0
7.6
4.8%
9.7%
2.7%
5.4
Year 9
3.3
0.0
7.6
4.4%
10.4%
2.7%
5.1
Year 10
4.2
0.0
6.2
5.6%
14.5%
2.7%
5.0
Year
(Mm3)
Year 1
Year 2
Year 3
1
Year 4
Year 5
2
Oversize (%)
3
thickness
(m)
Table 4. Mining production schedule
1
Includes the dry mining of Fouracres
Includes transit from Jack Track to Governor Broome
3
Oversize based on testwork results
2
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Metallurgy and Bulk Testwork
Bulk testwork was undertaken by Perth-based specialist laboratory Allied Mineral Laboratories (AML). A
2.6-tonne bulk sample testwork program was completed in mid-2021 with sample sourced from the
western portion of the Governor Broome Deposit, and a further 2-tonne bulk sample from Jack Track was
evaluated in mid-2023.
The testwork programs were designed to evaluate grades and recoveries of potential heavy mineral
products separated from the Project. The testwork comprised Feed Preparation Plant (FPP), Wet
Concentrator Plant (WCP) and Dry Plant sighter testwork.
These testwork programs demonstrated that for both the Governor Broome and Jack Track Deposits:
•
Oversize and slimes were readily removed using conventional processing techniques;
•
Heavy Mineral Concentrates (HMC) were successfully produced using conventional techniques;
and
•
Heavy Mineral Products (primary ilmenite, secondary ilmenite, zircon, rutile, garnet rare earth
mineral concentrate rich in monazite) were separated from the HMC that possessed quality
characteristics consistent with Heavy Mineral products from existing suppliers in the market.
Further optimization metallurgical testwork would be required for more advanced feasibility level studies.
Governor Broome Testwork
Jack Track Testwork
Figure 9. Governor Broome Project Bulk Testwork general sample locations.
The average mineral assemblage for each MRE domain is shown in Figure 10.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
GBW
GBE
GBS
Ilmenite
JTNW
Sec. Ilmenite
JTW
JT
JTE
Rutile
Zircon
Monazite
JTSWN
JTSWE
Garnet
JTSWS
FA
Other
Figure 10. Average Mineral Assemblage by MRE domain (Governor Broome West, East and South,
Jack Track, West, East, Southwest-North, Southwest-East and Southwest-South, and Fouracres).
Processing
The processing will involve a wet concentration plant (WCP) with a desliming stage to remove the fine
material (<45µm), screening to remove the oversize (>2mm) particles, followed by a series of gravity
spirals to produce a Heavy Mineral Concentrate.
The HMC will be attritioned before being stockpiled and transported to a local MSP (presumed to be near
Bunbury for the study) for toll treatment. The final products are then transferred to port (see Figure 11).
As a function of the scale and indicative nature of testwork conducted to date at the Governor Broome
Project, TZMI expects improved recoveries could be reasonably achieved from further flowsheet
optimization testwork. Therefore, the mineral recovery assumptions used in the Scoping Study have been
based on a combination of testwork and industry benchmarks to take account of the recovery gains
brought about by flowsheet optimsation and recirculating loads found in commercial scale plants (see
Table 5 and Table 6).
It is noted that further flowsheet optimisation testwork is required in order to demonstrate the base-case
metallurgical assumptions can be achieved and that lower metallurgical recoveries remain a possibility
until such testwork is completed. Lower metallurgical recoveries may significantly impact the economic
outcomes of the Project.
Process Recoveries
Heavy Mineral Product
Gov. Broome, Jack
Jack Track and
Track W, NW and SE
Fouracres
Ilmenite
85%
90%
Secondary Ilmenite
85%
80%
Rutile
80%
80%
Zircon
90%
98%
Garnet
90%
N/A
Monazite
95%
95%
Table 5. WCP mineral recovery assumptions by resource
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Toll Treatment Recoveries
Heavy Mineral Product
Gov. Broome, Jack
Jack Track and
Track W, NW and SE
Fouracres
Ilmenite
90%
90%
Secondary Ilmenite
90%
90%
Rutile
75%
75%
Zircon
80%
85%
Garnet
65%
65%
Monazite
60%
60%
Table 6. Toll treatment mineral recovery assumptions by resource
Figure 11. Conceptual process flowsheet.
The estimated production volumes by year are shown in Figure 12.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
250,000
200,000
tonnes
150,000
100,000
50,000
0
1
2
3
4
5
6
7
8
9
10
Production year
Primary ilmenite
Rutile
Garnet
Secondary ilmenite
Zircon
Rare earth mineral concentrate
Figure 12. Product volumes by year.
Product Pricing and Markets
A product quality and market assessment of the Governor Broome Project products were undertaken by
TZMI with an updated pricing estimate completed as part of the Scoping Study. Supply/demand and
price forecasts were developed for each product were developed as part of this assessment.
Based on December 2023 TZMI forecasts the global titanium feedstock supply is expected to peak in
2025, decreasing thereafter as existing mine grades decline and resources are depleted. The underlying
demand is expected to grow at a compounded annual rate of 2.2% between 2024 and 2035. The market
is therefore expected to move into a deficit in 2029 if new no new sources of supply are commissioned.
The supply/ demand balance for the zircon market shows that while the market is well supplied to 2028,
significant new capacity is required to meet demand after this date. This is due a decline in supply from
existing operations of 1.9% (CAGR) between 2024 and 2035.
The garnet market is expected to remain relatively balanced with growth in demand being matched by
supply out to 2030. Demand for the rare-earth metals, which are contained within monazite, is expected
to remain strong as the world continues its transition to clean energy technologies, in which rare earths
are an important component.
The price of the final products was assessed by TZMI based on the quality of the mineral products
produced during the metallurgical testwork undertaken by AML. The average price of each product over
the life of the mine is shown in Table 7, which takes any applicable premiums or discounts into account
based on the quality of the final products.
Negotiations with potential toll processers and off-take partners are yet to be undertaken. It is considered
appropriate that such negotiations be undertaken during the Pre-Feasibility stage of the Project in order
to confirm that nearby capacity exists to process the HMC as well as sufficient appetite for final mineral
products.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Heavy Mineral Product
Average USD/t FOB
(real 2023)
Primary ilmenite
286
Secondary ilmenite
338
Rutile
1,694
Zircon
1,745
Garnet
302
Rare earth mineral concentrate
1,400
Table 7. Average product prices used in the 2024 Scoping Study
Note: As part of the sale agreement of the Jack Track deposits, Iluka Resources Limited has a last right of refusal in its favour from
any products of these deposits.
Capital Cost Estimates
Capital costs (CAPEX) for the project are estimated at A$91 million, comprising direct costs of A$66.7
million and indirect costs of A$24.4 million. Sustaining capital is estimated at A$1.0 million per year.
These have been estimated in line with ±50% accuracy appropriate for Scoping level analysis and are
tabulated below.
Metric
A$ million 1
Mining Equipment
24.9
Wet concentrator plant
33.8
Infrastructure
8.0
Total direct costs
66.6
EPCM
7.5
Spares
1.7
Contingency (20%)
15.2
Total capital cost estimate
91.0
Table 8. Itemised CAPEX Estimates
1
Rounding errors may apply.
Capital Funding
To achieve the range of outcomes indicated in the Scoping Study, funding in the order of A$91 million will
be required for Project development. In addition, pre-development funding of approximately A$2-3
million would be required to convert Mineral Resources to an Ore Reserve and to complete a PreFeasibility Study, with further funding required to complete a Feasibility Study.
While there is no certainty that Project development funding will be obtained on satisfactory terms, at the
time required, or at all, the Astute Metals Directors believe that providing the Project economics indicated
by the Scoping Study are confirmed by the next stages of studies on the Project, it is reasonable to
assume that sufficient future funding for the development of the Governor Broome Heavy Mineral Sands
Project will be available when required.
The grounds on which this is reasonable basis is established include:
•
The Project has strong technical and economic fundamentals which provides an attractive return
on capital investment and generates robust cashflows based on market pricing. This provides a
strong platform to source the debt and equity funding required.
•
The Company has a strong track record of raising equity funds as and when required to further
the exploration and evaluation of the Governor Broome Project.
•
The Astute Board and management have a strong track record in developing projects.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Investors should note that there is no certainty that Astute will be able to obtain sufficient funding when
needed. It is possible that funding may dilute or otherwise affect the value of Astute’s existing shares.
It is possible that Astute may pursue other ‘value-realisation’ strategies such as sale, partial sale or joint
venture of the Project. If it does, this could materially reduce the Company’s ownership of the Project.
Operating Cost Estimates
Operating costs have been estimated as part of the Scoping Study using a combination of bottom-up
approach and estimates from the TZMI database based on industry benchmarks which are in line with
similar mineral sands processing operations in Australia. Operating costs include contract earthmoving
and dry mining, power, labour, maintenance, transport, storage, ship loading, rehabilitation, landholder
compensation and royalties.
The Scoping Study assumes that HMC is toll-treated at a nearby under-utilised mineral separation plant
located near the township of Bunbury and includes a corresponding HMC haulage cost.
The operating costs have been estimated in line with ±50% accuracy appropriate for Scoping level
a
Share your feedback
Discover