27 October 2023
SEPTEMBER 2023 QUARTERLY REPORT
Active quarter sees substantial progress in Astute’s critical minerals strategy
HIGHLIGHTS
Lithium Projects, Nevada USA
Altair Project
•
•
First hole in maiden program intersected two zones of significant lithium 1mineralisation:
•
33.5m @ 481ppm Li from 80.8m and 33.5m @ 508ppm Li from 147.8m (AL01)
•
Hole ended in lithium 1mineralisation, indicating further potential beyond hole depth.
Mineralisation occurs within regionally significant Siebert formation claystone, known to host lithium
deposits.
Cobre Project
Staking of the Cobre Project completed, with mapped Ts3 sedimentary host rocks prospective for
lithium clay mineralisation and soil sample results of up to 1,640ppm Li.
Red Mount Project
•
Staking of the Red Mountain Project completed, containing mapped Ts3 sedimentary host rocks.
Governor Broome Mineral Sands Project, WA
Acquisition of Fouracres
•
Acquisition of Retention Licence R70/22 (the “Fouracres Deposit”) completed, located along strike
•
Indicated Resource of 0.72Mt @ 11.4% HM and Inferred Resource of 0.22Mt @ 3.6% HM.
•
High-value Heavy Mineral suite comprising 75% ilmenite, 3% secondary ilmenite, 4% leucoxene/rutile
from the Jack Track Heavy Mineral Deposit.
and 8% zircon for a valuable HM content of 90%.
Completion of Wet and Dry Plant testwork program
•
Testwork program completed on 2t bulk sample from the cornerstone Jack Track deposit.
•
Successful processing using conventional mineral sands processing techniques delivered a high
•
Ilmenite, Rutile and Zircon products produced using conventional methods, with additional Monazite
85.5% recovery to produce a concentrate with an HM grade exceeding 90%.
(rare-earth element mineral) concentrate by-product.
Scoping Study
•
Highly-regarded international mineral sands consultancy group, TZMI, appointed to undertake the
Governor Broome Scoping Study, which is on track for completion in Q1 2024.
Georgina Basin
•
ExoSphere Ambient Noise Tomography (ANT) Survey underway to delineate structural features and
identify zones of potential IOCG alteration to assist with drill targeting.
Corporate
•
$3.403M raised through completion of “Tranche 2” and placement to Holdmark Property Group.
•
Shareholders approve change of name from “Astro Resources” to “Astute Metals”.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report on exploration and
development activities across its projects in Australia and the USA for the period ended 30 September 2023.
Lithium Projects
Background
Nevada hosts a number of large claystone-hosted lithium deposits and is home to North America’s only
lithium mining operation, Albermarle’s Silver Peak lithium brine operation. Other major deposits in the district
include Ioneer’s (ASX: INR) Rhyolite Ridge Project3 and Lithium America’s Thacker Pass deposit, the largest
lithium deposit in North America4 (Figure 1).
Claystone-hosted deposits differ from hard-rock pegmatite deposits (such as are common in Australia) in
that they form in soft rocks, with a semi-tabular shape that can be both strike extensive and thick.
If situated at surface or under shallow cover, this tabular morphology may facilitate low strip-ratio mining.
Processing of ore from claystone hosted deposits does not require roasting and is therefore less energy
intensive. These differences result in lithium claystone projects having lower production costs than most
hard-rock spodumene projects 3,4.
Altair and Polaris Projects
The Altair and Polaris Projects were staked by the Company in Q3 2022 following a systematic review of
regional open file data, such as mapped geology, topography, stream sediment geochemistry, land
administration and an assessment of suitable claim-free areas. The projects are located in the southern
extent of the Big Smoky Valley, south-west of the township of Tonopah, Nevada, in the heart of one of the
world’s most active lithium exploration districts. Close to the projects, the Siebert formation (Ts3) hosts large
claystone lithium deposits, including American Battery Technology Corporation’s (OTCMKTS: ABML) 15.8Mt
Lithium Carbonate Equivalent (LCE) Inferred category Tonopah Flats Lithium Clay Deposit1 and American
Lithium Corporation’s (TSX.V: LI) 9.79Mt LCE Measured and Indicated category TLC Lithium Project2 (Figure 2).
Figure 1. Project locations and lithium deposits.
Figure 2. Project locations and select neighbouring projects
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Work During the Quarter
The Company embarked on its maiden scout drill campaign over Q2-Q3 2023, exploring for lithium
mineralisation within the Siebert formation claystone under alluvial (gravel) cover at the two projects.
Initial drilling was successful, confirming the presence of lithium-bearing claystone at Polaris and a thick
intersection of Siebert formation claystone in the first hole at Altair4.
Drill Results
Drill-hole AL01 at Altair was drilled to a total depth of 181.4m, ending in Siebert formation claystone. It
intersected 109.7m of Siebert Formation that contained two significant zones of lithium mineralisation,
with the final, end-of-hole sample grading 585ppm Li, indicating further potential for lithium beyond the
current drill-hole depth.
Assays from the drill-hole, reported at a 300ppm Li intersection cut-off (with allowance for 5ft of internal
dilution) are:
•
•
33.5m @ 481ppm Li from 80.8m (265ft); and
33.5m @ 508ppm Li from 147.8m (485ft) to End-of-Hole (181.4m/595ft)
33.5m (110ft) @ 508ppm Li from 147.8m (485ft) to End Of Hole
33.5m (110ft) @ 481ppm Li from 80.8m (265ft)
The two intersections are both hosted mostly by blue-green claystones, and are separated by a lowergrade zone dominated by clayey gravels (Figure 3). Both intersections lie within a broader lower-grade
envelope of 109.7m @ 389ppm Li that constitutes the full Siebert formation claystone intersected by AL01.
Figure 3. Chip tray samples at 5-foot (Approx. 1.5m) depth intervals from Altair drill-hole AL01 and colour-coded arrows
indicating zones of lithium mineralisation.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
In addition to the results from AL01, assay results were also returned for PL04A, the re-drill of Polaris Project
drill-hole PL04. The deepening of hole PL04A was designed to test for higher-grade lithium mineralisation
beyond the original PL04 intersection of 3.05m (10 feet) grading 140.8ppm lithium at end-of-hole. The
successful re-drill continued to intersect highly anomalous lithium results, up to a maximum grade of
236ppm Li over a single 1.5m (5-foot) sample from 158.5-160.0m (520-525ft). The full intersection of
Siebert formation claystone of 59.5m (195ft) graded 82.8ppm Li on average.
Interpretation
The intersection of two thick zones of lithium mineralisation in the first hole drilled at Altair is an excellent
result that highlights the potential of the Altair Project for thick claystone-hosted lithium mineralisation.
Next Steps
A plan to further build on the initial success of AL01 at Altair includes the drilling of two already permitted
drill holes in quarter 4 this year. These two holes are designed to test for continuity of lithium
mineralisation to the east over a 7km strike extent (Figure 4). Due to the challenging ground conditions
encountered during drilling of the initial sites at Polaris and Altair, the Company has prioritised sourcing
a higher-powered rig to drill the remaining holes at Altair.
Figure 4. East-west cross-section showing AL01, lithium geochemistry and remaining planned holes.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Expansion of Lithium Footprint
During the quarter, the Company completed the
physical staking of a new project, known as the Cobre
Lithium Project, in northeast Nevada (Figure 5). The
Cobre Project is located east of Wells and close to the
locality of Cobre, a historical interchange between the
Southern Pacific Railroad and the Nevada Northern
Railway, which historically serviced the copper mining
industry in Ely, Nevada. The claims are considered
prospective for claystone-hosted lithium deposits.
Cobre Soil Sampling
Following the staking of the Cobre Project, the
Company conducted a soil sampling program to
detect the presence of lithium in soil. Lithium in the soil
may indicate the presence of lithium-bearing
claystone.
The Company collected a total of 229 samples
covering the staked project area on a 400m x 100m
sampling grid pattern, mostly overlaying mapped
outcropping tertiary sedimentary (Ts3) host rocks,
considered prospective for lithium claystone
mineralisation.
Figure 5. Map showing the location of Cobre Project
and its proximity to the Polaris and Altair Projects
The results returned were highly encouraging, with a
peak value of 1,640ppm lithium, and 23 results of over
100ppm lithium, which is considered highly
anomalous
(Figure
6).
The
lithium-in-soil
geochemistry, which highlights the prospective nature
of the Project, will be used to inform drill locations for
permitting and subsequent drill testing. Full results
can be found in Appendix 1 of the ASX release dated 18
September 2022.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 6. Soil sample lithium geochemistry, Cobre Project claims outline and aerial image.
Red Mountain Project Staking
During the quarter, the Company also completed physical staking of a project in eastern central Nevada
named ‘Red Mountain’ (Figure 7). The Project is located 195 kilometres from the Polaris and Altair Projects. The
Project was an area of interest to the Company based on the presence of mapped Ts3 sedimentary rocks,
known to host lithium deposits elsewhere in the state of Nevada, and anomalous lithium geochemistry in two
historical stream sediment samples collected in 1980 as part of the National Uranium Resource Evaluation
(NURE) program2. The samples were re-assayed for a full suite of elements, with the latest revised data
publicly released in 2021. These results included analysis for lithium4.
At quarter-end, the Company was in the final stages of processing its claims forms, with the matter finalised
subsequent to the end of the reporting period.
The Company noted that a competitor has staked claims in the same area and it is possible that a number
of the claims may be the subject of dispute. However, based on information to hand, the Company considers
that it will be in a position to secure at a minimum, a substantial part of the area.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 7. Astute Metals Nevada Lithium Project locations and lithium deposits.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Governor Broome Mineral Sands Project, WA
Project Overview
The 100%-owned Governor Broome Mineral Sands Project is located approximately 95km by sealed road
south of Busselton, 105km south of Iluka’s processing plant at Capel, and 135km from Bunbury Port and from
Picton, where Doral has a heavy mineral separation plant.
Figure 8. Governor Broome Project Location, WA.
A 132kV power line is located just 5km to the north and a three-phase power line passes through the Governor
Broome Project, giving it significant strategic advantages from an infrastructure and access perspective.
Astute is progressively de-risking the project development, with the first stage of this process completed in
Q2 with the successful execution of in-fill drilling to upgrade high-value Inferred Mineral Resources to
Indicated status. The Company expects to report an updated Mineral Resource Estimate for Governor Broome
in Q4. This updated Mineral Resource estimate will underpin a Scoping Study, scheduled for completion Q1 of
2024.
The Scoping Study is expected to deliver strong output metrics, based on the shallow, high-grade nature of
the Mineral Resources that form the foundation of the Project, and the demonstrated ability to separate the
valuable heavy minerals into marketable products.
Previous bulk sample results from the western part of the Governor Broome Project demonstrated the ability
to produce premium-grade Zircon, chloride-grade Ilmenite and sulphate-grade Ilmenite (ARO
Announcement 16th June 2021).
During the September Quarter, Astute undertook bulk sample testwork on Indicated Resource material from
the Jack Track Deposit, in the eastern part of the Project, which confirmed the ability to produce high-value
Ilmenite, Rutile and Zircon products using conventional dry plant mineral separation equipment.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Acquisition of the Fouracres Deposit
During the quarter, the Company completed the acquisition of the Fouracres Deposit, which hosts an
Indicated Resource with a very high grade of 11.4% heavy minerals (“HM”).
The heavy mineral assemblage of the Fouracres Deposit is also high value, comprising 75% ilmenite, 3%
secondary ilmenite, 4% leucoxene/rutile, and 8% zircon for a 90% VHM content. The ilmenite has a high TiO2
content of 60%.
The Fouracres Deposit was explored using air-core drilling by Cable Sands during 1991. Cable Sands carried
out a resource estimation and mineralogical studies.
The Fouracres Resources were re-estimated in 2011 to comply with the reporting standards of the JORC code,
using the results of the drilling and mineralogical studies that had been previously reported to the
Department of Mines and Petroleum.
Details of the drilling and resource assessment are set out in JORC Code Table 1 in Appendix 1 to the ARO
announcement dated 13 July 2023.
Below (Figure 9) is a map showing the expanded Governor Broome Project area, including the Fouracres
Deposit, which now forms part of the expanded Governor Broome Project:
Figure 9. Governor Broome Project – Resources and Licences, including Fouracres
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Governor Broome Project Updated Resources
The Governor Broome Project’s updated Mineral Resources are summarised in Table 1 (refer to ASX ARO
release 13 July 2023). Based on the previously announced resource table (ASX release 19 September 2022),
set out below are the updated resources inclusive of the Fouracres Deposit.
Tenement
Category
Indicated
Inferred
Tonnage
(Mt)
26
43
HM
(%)
4
4
Slimes
(%)
8.6
9
Oversize
(%)
7.1
3
R70/58 - Jack Track
R70/53 - Governor Broome
Indicated
Inferred
52
6
4.8
4
13
15
8.5
6
R70/22 – Fouracres1
Indicated
Inferred
0.72
0.2
11.4
4
6.5
9
1.7
0.8
Project
Indicated
Inferred
79
48
4.5
4
11
10
8
4
Total Resources
127
4.3
11
6.5
Table 1. Governor Broome Project Resources – at 2% HM lower block-cut-off grade for Jack Track and
Governor Broome and 3% for Fouracres
Notes: 1. The Fouracres resources were estimated at a 3% HM lower block-cut-off grade
2. The values in the table have been appropriately rounded
Acquisition Terms
The terms of the acquisition with Cable Sands are as follows:
• a cash payment on settlement of $150,000; and
• a 1% gross royalty on all future product arising from the Fouracres Deposit.
Completion of the transaction occurred on 3 August 2023.
Work During the Quarter
Bulk sample testwork Program
During the quarter, a testwork program was completed by Allied Mineral Laboratories (“AML”) in Perth (ASE
Announcement 23rd August 2023). The purpose of the program was to evaluate grades and recoveries of
potential heavy mineral products separated from the Jack Track Deposit (Figure 10). The testwork comprised
Feed Preparation Plant (FPP), Wet Concentrator Plant (WCP) and Dry Plant sighter testwork on a 2-tonne bulk
sample from the Jack Track Deposit.
The Wet Concentrator Plant (WCP) is the second stage of typical Mineral Sands processing, whereby heavy
minerals are concentrated from the sand by exploiting the differences in the density of the various minerals
present in the feed. This process rejects the lighter low value minerals such as quartz, which are not of
economic interest. Dry Plant testwork separates the Heavy Mineral Concentrate (HMC) produced by the WCP
stage into mineral products using conventional magnetic, gravity and electrostatic processes. The mineral
products produced are then tested for quality. Products produced as part of the testwork included TiO2
feedstocks including primary ilmenite, secondary ilmenite and rutile, as well as zircon and monazite
concentrates.
Results
Feed preparation plant test-work
Feed preparation is the first stage in Mineral Sands processing, whereby coarse material (>2mm) and fine
clays/slimes (the <45µm fraction) are separated and rejected from the sand fraction containing the valuable
heavy minerals. The processing employed a trommel, screen, and desliming cyclone. Table 2 shows the
proportions of the size fractions recovered from the bulk sample.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Size
Jack Track
Fraction
Deposit Mass %
Coarse
1.5%
Sand
89.8%
Slimes
8.6%
Table 2. Size proportions of Bulk Sample
As with the Governor Broome West and East material previously tested6, this stage of the testwork successfully
demonstrated the amenability of the material sourced from the Jack Track Deposit to processing through
the feed preparation circuit using conventional mineral sands processing equipment.
The material was processed without difficulty with the sand fraction containing the valuable heavy minerals
readily liberated from the slimes without the need for energy intensive processing equipment. A
photomicrograph of the heavy mineral concentrate produced during the trial is shown in Figure 10.
Figure 10. Photomicrograph of heavy mineral concentrate produced during testwork (scale approximate)
Wet Concentrator Plant test-work
The metallurgical performance of the sand-fraction through the WCP circuit was assessed using full-scale
gravity concentration spirals in a five-stage circuit followed by an attritioning/gravity upgrade stage. The
processing successfully demonstrated that a heavy mineral concentrate containing valuable heavy
minerals could be produced with a high recovery of valuable heavy minerals to the concentrate. The lowdensity ‘gangue’, or valueless, minerals were successfully rejected to tails producing a heavy mineral
concentrate containing greater than 90% heavy minerals.
Overall, recovery of heavy minerals to the heavy mineral concentrate at 85.5% exceeded the previous results
achieved for the Governor Broome West and Governor Broome East bulk testwork6.
Estimates of the recoveries of minerals across the FPP and WCP, based on a mineralogical assessment were
determined to be:
•
•
•
•
Zircon: 97.5%
Primary Ilmenite 89.7%
Rutile 74.7%
Secondary ilmenite 58.0%
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
The testwork results indicated the potential to isolate several TiO2 mineral products of differing TiO2 grades,
and the opportunity exists to improve the recovery of valuable heavy minerals by optimisation of the WCP
circuit. Overall, the wet circuit testwork demonstrated the amenability of the material sourced from the Jack
Track Deposit to processing using conventional mineral sands processing equipment and that high
recoveries of valuable heavy mineral to a high-grade heavy mineral concentrate could be achieved.
Dry Plant Test-work
The HMC produced from the Jack Track Deposit bulk sample was then processed through a drymill flowsheet,
making use of conventional mineral sands processing techniques and equipment, to investigate the
potential quality of the final mineral products.
The dry plant process was simulated at a pilot scale by employing multiple magnetic separation stages (RED
and RER) followed by electrostatic separation and a screening stage to investigate the potential to isolate
several ilmenite products of differing TiO2 grades.
The non-magnetic stream, rich in zircon and rutile, was upgraded through stages of gravity, electrostatic and
high-intensity magnetic separation to isolate zircon and rutile products. A by-product monazite concentrate
product was also produced which assayed 7.46% CeO2 (cerium oxide).
The testwork demonstrated that the HMC produced responded well to the dry circuit processing with ilmenite,
rutile and zircon minerals readily isolated into final products.
Mineral Products
The drymill processing of the HMC successfully demonstrated that a range of ilmenite, leucoxene, rutile, and
zircon products could be recovered from the HMC. Monazite was also recovered to a para-magnetic
concentrate stream.
Highly-regarded international mineral sands consultancy group TZMI has assessed the TiO2 feedstock
products generated during the testwork program and is of the opinion that:
• The combined ilmenite (58.7% TiO2) product will be suitable for direct use in chloride feedstock markets
or for chloride slag manufacture.
• The CaO, MgO and MnO of the combined ilmenite are within the generally accepted thresholds for direct
use in chloride pigment manufacture or as an ilmenite feed for chloride slag or SR manufacture,
particularly as the MgO content (at ≤0.3%) compares favourably against competing products.
• The rutile product meets the criteria of a premium-grade rutile product and will be suitable for use in
pigment production. Low levels of key impurities make it suitable for welding applications for sale as a
higher value product.
The composition of the TiO2 products generated during the trial is given in Table 3.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Element
Primary
Secondary
55.9
63.3
79.6
Ilmenite
TiO2 (%)
Ilmenite
Leucoxene
Combined
Rutile
Ilmenite Product
Product
58.7
96.5
Fe2O3 (%)*
41.1
30.9
14.7
37.2
0.79
Al2O3 (%)
0.41
0.99
1.15
0.62
0.28
CaO (%)
0.04
0.08
0.11
0.06
<0.01
Cr2O3 (%)
0.05
0.11
0.14
0.07
0.13
MgO (%)
0.29
0.19
0.10
0.26
<0.01
MnO (%)
0.98
0.88
0.34
0.94
<0.002
Nb2O5 (%)
0.12
0.17
0.34
0.14
0.33
P2O5 (%)
0.07
0.14
0.15
0.10
0.03
SiO2 (%)
0.87
0.51
0.66
0.80
0.44
V2O5 (%)
0.20
0.24
0.28
0.22
0.48
U+Th
64
205
260
116
66
(ppm)
*Total iron expressed as Fe2O3
Table 3. TiO2 product compositions
A photomicrograph of a sample of the ilmenite produced is shown in Figure 11.
Figure 11 Photomicrograph of ilmenite produced during the testwork (Scale approximate)
TZMI has also assessed the zircon products and is of the opinion that:
•
•
•
At a ZrO2 + HfO2 content of 65%, the zircon product generated is considered a standard grade product.
The Fe2O3 and TiO2 contents of the Jack Track zircon product are within the acceptable threshold for
ceramics and foundry applications.
TZMI estimates that a price discount of about 5% relative to premium-grade zircon may be applicable.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Element
ZrO2+HfO2 (%)
Zircon
Product
65.0
SiO2 (%)
32.8
Al2O3 (%)
0.68
TiO2 (%)
0.14
Fe2O3 (%)
0.04
CaO (%)
0.03
CeO2 (%)
<0.01
U+Th (ppm)
530
Cr2O3 (%)
0.01
MgO (%)
0.01
MnO (%)
0.01
Nb2O5 (%)
0.01
P2O5 (%)
0.14
K2O (%)
0.01
SO3 (%)
<0.01
LOI1000
0.17
Table 4. Indicative Zircon product composition
Figure 12. Photomicrograph of zircon produced during the testwork (Scale approximate)
Bulk Sample Data
The bulk samples were sourced from the full depth of the modelled heavy mineral sands mineralisation in
each of the 233 air-core holes drilled by Astute into the Jack Track Deposit during 2022 and, as such, are
representative of its HM mineralisation. A total of 960 one-metre samples were used to make up the bulk
sample. Full details of the hole locations and HM intersections that provided the bulk samples are given in
Appendix 2 of the ASX release dated 23 August 2023.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Resource and Project Development Timeline
Astute is currently in the final stages of completing an updated Mineral Resource Estimate (MRE) for the
Governor Broome Project. The Company embarked on an in-fill drilling campaign in Q2 designed to upgrade
Inferred Mineral Resources within R70/58 to the Indicated category. The upcoming MRE update will
incorporate data and results from this in-fill campaign with a view to maximizing Resource tonnes to be
included in the Scoping Study. The MRE update will be completed in Q4 and provided to TZMI for incorporation
into the Scoping Study, which is scheduled for completion in Q1 2024.
Results from mineral assemblage data sourced from the drilling campaign will to be reported in conjunction
with the updated MRE. They will also be incorporated in the Scoping Study.
Scoping Study
During the quarter, the Company finalised arrangements with highly-regarded international mineral sands
consultancy group, TZ Minerals International (TZMI), to complete the Scoping Study for the Governor Broome
Project. The study, scheduled for completion in Q1 2024, will comprise a review and assessment of the project
setting, mining options, processing options, infrastructure assessment and mineral products market review,
guided by the bulk testwork outcomes.
Optimisation of the value of Project
In parallel with the progress of the Governor Broome Project Scoping Study, the Company will commence
actively considering its options for the ultimate direction of the Project, with a view to optimising valuecreation for shareholders in alignment with Astute’s clear long-term strategic direction as a critical metals
explorer.
The options to be considered include:
• Sourcing of debt funding
• Investigating potential Joint Venture partners and how the arrangements can enhance value;
• Review of sale options and likely buyers for the asset; and
• Consider other avenues for value realisation.
Georgina Basin, Northern Territory IOCG Project
Project Overview
Located in the highly prospective East Tennant province in the Northern Territory, the Georgina Project
comprises seven granted Exploration Licences and three under application for a combined total of
approximately 4,500km2. The Georgina Project is 80%-owned by Astute, with the remaining 20% owned by
Greenvale Energy Limited (ASX: GRV).
The East Tennant province has been the subject of intense geoscientific investigation by both Geoscience
Australia and the Northern Territory Geological Survey for over five years. Pre-competitive work undertaken
as part of the Federal Government’s $225 million Exploring for the Future program (EFTF) included solid
geology interpretation, alteration proxy mapping and mineral prospectivity mapping for Iron Oxide Copper
Gold (IOCG) deposits.
The collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the highly
prospective nature of the region by intersecting prospective host rocks, IOCG-style alteration and sulphide
mineralisation as part of a 10-hole program at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some smaller highgrade variants – most notably those at Tennant Creek. This style of deposit contains elevated levels (10-60wt
%) of the iron oxide minerals magnetite and hematite, which gives rise to their (typically) elevated magnetic
and gravity (density) properties.
Australian IOCG’s include South Australia’s Olympic Dam, Prominent Hill and Carrapateena deposits, Ernest
Henry in north-west Queensland, and the high-grade Warrego and Juno deposits located west of the
Georgina Project at Tennant Creek in the Northern Territory.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Work During the Quarter
During the quarter, the Company commenced an Ambient Noise Tomography (“ANT”) geophysical survey
over its highly prospective central Georgina tenement, EL33375. The survey, conducted using Fleet Space
Technologies’ “ExoSphere” technology, is the first of its kind to be employed in the frontier IOCG-prospective
East Tennant region.
The purpose of the ExoSphere survey is to gain an improved understanding of the subsurface structure, which,
when used to constrain the Company’s existing gravity and magnetic survey data, is expected to be a highly
powerful tool for the identification of IOCG-style targets for future drill testing.
Astute’s survey comprised of 192 survey points stretching across a 14km survey axis incorporating previous
drilling, including two National Drilling Initiative (NDI) drill holes. Geodes are placed in the field and left in place
until sufficient seismic data has been collected, after which they are relocated to a new survey point.
Next Steps