Full Year Statutory Accounts
Released
Released
Announcement PDF
2024
ANNUAL REPORT
Astute Metals NL and Controlled Entities
ABN: 96 007 090 904
Contents
Consolidated Financial Statements
Page
Corporate Directory ....................................................................................................................................................
3
Chairman’s Letter to Shareholders ............................................................................................................................
4
Review of Operations and Tenements .......................................................................................................................
5
Corporate Governance Statement ..............................................................................................................................
26
Directors’ Report.........................................................................................................................................................
27
Auditors Independence Declaration............................................................................................................................
37
Consolidated Statement of Profit or Loss and Other Comprehensive Income ............................................................
38
Consolidated Statement of Financial Positon .............................................................................................................
39
Consolidated Statement of Cashflows ........................................................................................................................
40
Consolidated Statement of Changes in Equity ...........................................................................................................
41
Notes to the Financial Statements ..............................................................................................................................
42
Consolidated Entity Disclosure Statement..................................................................................................................
68
Directors' Declaration .................................................................................................................................................
69
Independent Auditor's Report to the Members of Astute Metals NL ...........................................................................
70
Schedule of Tenements ..............................................................................................................................................
74
ASX Additional Information .........................................................................................................................................
75
ASTUTE METALS NL AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Corporate Directory
Directors
Mr Anthony Leibowitz
(Non-Executive Chairman)
Mr Matthew Healy
(Executive Director and CEO)
Mr John Young
(Non-Executive Director)
Mr Vincent Fayad
(Executive Director)
Registered Office
Suite 6, Level 5, 189 Kent Street
SYDNEY NSW 2000
Principal Place of Business
Suite 6, Level 5, 189 Kent Street
SYDNEY NSW 2000
P
+61 2 8046 2799
W
www.astutemetals.com
Joint Company Secretaries
Mr Vincent Fayad
Mr Kurt Laney
Auditor
RSM Australia Partners
Level 13, 60 Castlereagh Street
SYDNEY NSW 2001
ASX Code
ASE
Share Registry (Australia)
Link Market Services Limited
Level 4 Level 12,
680 George Street
SYDNEY SOUTH NSW 2000
Home Exchange
Australian Securities Exchange Limited
Exchange Plaza
2 The Esplanade
PERTH WA 6000
- 3 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Chairman’s Letter to Shareholders
Dear Fellow Shareholders,
I am pleased to present the Astute’s 2024 Annual Report and to reflect on what has been a year of significant progress for the
Company, notwithstanding the challenging market conditions that have impacted the junior resources sector.
Our key achievements during the year can be summarised as follows:
•
The discovery of a significant lithium claystone deposit at the Red Mountain Project, which has delivered outstanding
results and demonstrated all the key attributes for what appears to be a high-quality project;
•
The completion of a positive Scoping Study for the Governor Broome Mineral Sands Project in WA, highlighting the
potential to unlock significant value for shareholders. Complementing the Scoping Study, other key developments
included the acquisition of the strategic adjoining high-grade Fouracres Deposit; and
•
The identification of a significant IOCG drill target at the Georgina Basin Project in the Northern Territory.
The detail of these achievements is well covered in the “Review of Operations” Section of this Report, and I encourage you to
read further in the pages that follow. By any measure, I believe these results to be exceptional for a company of Astute’s size
and resources – and this is testament to the hard work and dedication of our management team and Board of Directors.
One point I would particularly like to highlight is the Company’s decision to pursue a program of systematically identifying and
staking high-quality lithium assets in Nevada at a time when lithium prices are at an all-time low. This reflected our strategic
focus, as announced in March 2023, on finding high-quality lithium assets capable of generating shareholder value through
the commodity price cycle.
While the subsequent sharp drop in lithium prices over the course of 2024 has severely impacted investor sentiment, the Board
takes a long-term view of its asset selection and development process. As long as the projects in our portfolio meet our criteria
in terms of their potential to deliver the mines of the future, we remain committed to advancing them as part of a countercyclical strategy that we believe will ultimately deliver enormous returns to our shareholders. We believe the Red Mountain
Project in particular ticks all of these boxes and will ultimately emerge as an asset of considerable value to Astute.
Like any business, the Board is mindful of maintaining a prudent and disciplined approach to the management of its asset
portfolio. With this in mind, the Company decided to cease work at the Altair, Polaris and Kibby Basin Projects in order to
reduce holding costs and focus our resources and attention on what we consider to be assets with ‘company-making’ potential
such as the Red Mountain and Cobre Projects.
As part of the Company’s leadership succession plan, Matt Healy was appointed to the Board as an Executive Director in
November 2023 and subsequently as our CEO. Matt is an extremely hard-working and talented leader who has contributed
significantly to the Company’s progress over the past two years. I congratulate Matt on his appointment and look forward to
continuing our relationship.
Turning to the year ahead, Astute remains focused on;
•
Progressing rapidly towards a maiden Mineral Resource Estimate for the Red Mountain Project, as well as creating
a path forward for the exciting Cobre Project;
•
Drill testing the significant anomalies identified in the geophysical work undertaken during the year at the Georgina
Basin Project in order to unlock the potential for a major Iron Oxide Copper Gold (IOCG) mineral discovery; and
•
Progressing the Governor Broome Project towards the next phase of commercialisation and exploitation.
As many of you are aware, I increased my holding in Astute during the year by acquiring a significant portion of the shares
previously held by Greenvale Energy. At the time, I said that “I like what I see”; my view and resolve for this Company remains
stronger than ever, and I look forward to a successful year ahead in 2025 as we strive to create value for all our stakeholders.
Yours sincerely
Tony Leibowitz
Chairman
Dated 30 September 2024.
- 4 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
OPERATIONS
Astute has three key projects within its portfolio:
•
•
•
The Needles Lithium Projects in Nevada, USA, including the Red Mountain Lithium Project;
The Governor Broome Mineral Sands Project, located in the south-west region of Western Australia; and
The Georgina Basin IOCG Project, located in the East Tennant Creek province of the Northern Territory.
Astute also has two non-core projects within its portfolio, being the East Kimberley Diamond Project, located in the north-east
region of WA and the Needles Gold Project in Nevada, USA.
Figure 1. Astute Metals Key Projects
LITHIUM PROJECTS
Background
The Needles Lithium Project largely consists of the “Red Mountain Project”. In the previous year, the Company also staked
the Altair and Polaris Projects, which are located in the Montezuma Valley, south-west of the township of Tonopah and are
accessed via the Veteran’s Memorial Highway.
These projects are strategically located near known claystone lithium deposits that are active in the region of the Big Smoky
Valley. The Big Smoky Valley area has seen significant lithium exploration activity recently, with notable projects like American
Lithium Corporation's TLC Lithium Project and American Battery Technology Corporation's Tonopah Flats project. Other
explorers in the vicinity include Future Battery Minerals and Pan-American Energy.
Red Mountain
Background
Located in central-eastern Nevada, the Red Mountain Lithium Project was staked in August 2023 following a desktop project
generation exercise and subsequent on-ground reconnaissance program conducted in May 2023. The project area has broad
mapped tertiary lacustrine (lake) sedimentary rocks known locally as the Horse Camp Formation, and regionally as part of the
Ts3 Formation.
The Red Mountain Project lies within a zone comprising anomalous lithium-in-soil values of more than 50ppm lithium and
stretching over a wide north-south strike extent of 8km and a width of up to 2.8km, with internal coherent zones of greater than
100ppm lithium, and a maximum value of up to 1,110ppm lithium.
The Ts3 Formation elsewhere in the State of Nevada hosts large lithium deposits, such as the 15.8Mt LCE (lithium carbonate
equivalent) Tonopah Flats deposit1 and the 9.79Mt LCE TLC Lithium Project2. Other attractive characteristics include
outcropping claystone host-rocks and close proximity to infrastructure, including the Project being immediately adjacent to the
- 5 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
Grand Army of the Republic Highway (Route 6), which links the regional cities of Ely with Tonopah.
At the time of staking, the Company staked the 556 claims that constitute the Red Mountain Project (“Red Mountain Claims”)
and a competing claim staker was also active in the Red Mountain Project area, staking a number of unpatented mining claims
in the area that overlaps with the Astute claims (“Overlapping Claims”). The vast majority of these claims were staked after the
Company staked its claims. However, a number of monument stakes were emplaced by the Competitor prior to those by the
Company.
Soil Sampling
Shortly after staking the Red Mountain Project, the Company embarked on a regional-scale soil sampling campaign to test for
lithium-in-soils that may indicate the presence of lithium claystone at the Project.
The Company collected a total of 819 soil samples during September 2023, targeting outcropping and sub-cropping
prospective host rocks at a 400x100m grid across the project. A further 10 soil samples were also reported from initial
reconnaissance sampling undertaken at the Red Mountain Project area in May 2023, prior to staking the claims.
Red Mountain Rock Chip Sampling
During the reporting period, the Company completed the field component of a rock chip sampling campaign at Red Mountain
which targeted outcropping and sub-cropping rocks at the Project, with the objective of identifying lithium mineralisation in
host rocks.
The rock chip samples returned high-grade mineralisation of up to 4,150ppm lithium, further enhancing the project’s
exploration and discovery potential. Notable results returned up to 1.4km north of the recently reported discovery include:
•
4,150ppm Li, brown-green claystone sampled 490m north of RMRC002
•
2,900ppm Li, brown claystone sampled 990m north of RMRC002
•
2,550ppm Li, brown claystone sampled 1.40km north of RMRC002
A total of 81 samples were collected and assayed, adding to Astute’s understanding of the prospective horizons at Red
Mountain and complementing the initial drill results from its maiden drilling campaign. The rock chip assays are shown, along
with previous results including the recently announced high-grade lithium discovery, in Figure 2.
These results suggest that the targeted high-grade lithium horizon persists further north than previously interpreted, with a
number of high-grade samples located along an approximate north-south trend stretching 1.4km north of the northernmost
drill hole, RMRC002. The extended zone will be tested by future drilling at the project.
- 6 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
Figure 2. Rock chip and Drill-hole locations, select intersections, and gridded soil sample geochemistry
Maiden Drill Campaign
In March 2024, the Company received approval from the United States Department of the Interior Bureau of Land Management
(BLM) for its Notice of intent to conduct exploration and, with a bond in place, granted the Company a permit to undertake a
campaign comprising a total of 11 drill sites as part of its maiden inaugural Reverse Circulation (RC) drilling program at Red
Mountain.
The 11-hole, 1,518m program targeted lithium clay mineralisation in zones of strong soil anomalism and/or rock chip
anomalism with a view to understanding the thickness and grade potential of the project. The key initial results are summarised
below:
•
RMRC001 : 59.4m @ 1,300ppm Li / 0.69% Lithium Carbonate Equivalent (LCE) from 73.2m
•
RMRC002 : 15.2m @ 810ppm Li / 0.43% LCE from 15.2m
•
RMRC003 : 6.1m @ 1,050ppm Li / 0.56% LCE from surface, and
12.2m @ 1,060ppm Li / 0.56% LCE from 18.3m
These initial results confirmed the discovery of sub-surface lithium mineralisation at Red Mountain, indicating clear potential
for it to emerge as a significant project in the context of North American exploration efforts for battery metals. The Company
received assay results for the remaining two holes subsequent to the end of the reporting period, as summarised below:
22 July 2024 – second batch
- 7 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
This second batch of assays from drill holes RMRC004-007, located centrally within the group of holes drilled, demonstrated
thicker intersections than those previously announced, with all four holes intersecting +70m zones grading over 1,000ppm
lithium, confirming the scale and grade potential at Red Mountain:
•
RMRC004 : 13.7m @ 1,070ppm Li / 0.57% Lithium Carbonate Equivalent1 (LCE) from surface
83.8m @ 1,230ppm Li / 0.65% LCE from 16.8m
•
RMRC005 : 26.0m @ 656ppm Li / 0.35% LCE from 3.0m
80.8m @ 1,270ppm Li / 0.68% LCE from 56.4m to End of Hole
•
RMRC006 : 62.5m @ 1,070ppm Li / 0.57% LCE from 6.1m
15.3m @ 896ppm Li / 0.48% LCE from 71.6m
70.1m @ 1,090ppm Li / 0.58% LCE from 89.9m
•
RMRC007 : 74.7m @ 1,160ppm Li / 0.61% LCE from 18.3m
25.9m @ 1,580ppm Li / 0.84% LCE from 115.8m
7 August 2024 – third batch
This final batch of assays – from drill holes RMRC008-011, located in the south of the project area – demonstrated
multiple zones of lithium mineralisation, adding to the overall potential of the Project:
•
RMRC008: 25.9m @ 1,120ppm Li / 0.60% Lithium Carbonate Equivalent1 (LCE) from 73.2m
•
RMRC009: 50.3m @ 908ppm Li / 0.48% LCE from 15.2m
18.3m @ 904ppm Li / 0.48% LCE from 68.6m
13.7m @ 995ppm Li / 0.53% LCE from 99.1m
29.0m @ 1,060ppm Li / 0.57% LCE from 123.4m to End of Hole
•
RMRC010: 33.5m @ 1,260ppm Li / 0.67% LCE from 19.8m
30.5m @ 898ppm Li / 0.48% LCE from 74.7m
•
RMRC011: 44.2m @ 905ppm Li / 0.48% LCE from Surface
48.8m @ 834ppm Li / 0.44% LCE from 51.8m
13.7m @ 1,260ppm Li / 0.67% LCE from 120.4m End of Hole
The exploration and drilling activity completed during the reporting period is summarised in Figure 3 below:
- 8 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
Figure 3. Drill-hole locations and intersections, and gridded soil sample geochemistry over aerial image.
Interpretation of Results
During the reporting period, the Company completed an initial geological interpretation for the Red Mountain Project based on
drill sample logging and assays, surface sample geochemistry and other publicly available data including aerial photography
and ASTER imagery.
The Project area covers an upthrust lacustrine sedimentary basin dominated by siltstone, sandstone, claystone and
limestone/marl, with felsic volcano-sedimentary inputs. Further details of this work will be included in the 2025 Annual Report.
The results of the maiden drill campaign at Red Mountain were overwhelmingly positive. Every hole in the campaign intersected
thick zones of lithium mineralisation that is often high-grade, particularly in comparison to average resource grades for lithium
clay mineral resources located in the cluster of deposits around Tonopah, most of which grade between 574 – 809ppm, subject
to the cut-off grade of the particular quoted Mineral Resource.
The Company has reported results from Red Mountain above a cut-off grade of 500ppm lithium, with allowance for only minimal
5ft (approx. 1.5m) of internal dilution below this grade. These results have identified multiple mineralised stratigraphic horizons
that are currently open in all directions, and – based on widespread soil anomalism in previous soil sampling – there is excellent
potential for the discovery of further mineralised horizons within the stratigraphic package at Red Mountain.
Altair
Background
Centred south-west of the township of Tonopah, in the heart of one of the world’s most active lithium exploration districts, the
Altair and Polaris Projects were strategically staked proximal to outcropping tertiary sedimentary host rock (known locally as
the Siebert formation) that is known to host claystone lithium deposits around Nevada. The Company commenced its maiden
- 9 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
drill campaign in late April 2023, exploring for lithium mineralisation within the Siebert formation claystone under alluvial (gravel)
cover at the two projects.
Drill Results
During the year, the Company completed a total of three drill-holes at Altair.
Drill-hole AL01 successfully intersected two zones of lithium mineralisation:
•
•
33.5m @ 481ppm Li from 80.8m (265ft); and
33.5m @ 508ppm Li from 147.8m (485ft) to End-of-Hole (181.4m/595ft).
Drill-hole AL03 intersected:
•
13.7m @ 365ppm Li from 163m (535ft) to End-Of-Hole (176.8m/580ft).
Drill-hole AL02, drilled at the eastern extent of the Altair Project approximately 5.4km east of AL03, intersected four zones of
anomalous lithium-in-clays where lithium values peak over 100ppm lithium. It is unclear at this early stage whether the
intercalated claystone and fine gravels at this hole belong to the Siebert Formation or are part of younger, Quaternary-aged
sequences.
Interpretation
The thick intersection of Siebert formation at Altair confirmed the presence of the prospective lithium host rocks at the project
with good potential for lithium mineralisation. The Siebert Formation is the local name for lacustrine (lake) sedimentary rocks
mapped across parts of Nevada. The formation is known to host two of the largest lithium resources in the United States – the
15.8Mt LCE Tonopah Flats deposit and the 9.79Mt LCE TLC Lithium Project.
The deepening of the Claystone intersection in PL04A was designed to test for higher-grade lithium mineralisation beyond the
original PL04 intersection of 3.05m (10 feet) grading 140.8ppm lithium at end-of-hole, given the general increase in lithium
grade observed toward the end-of-hole.
Figure 4. Schematic east-west cross-section of AL01 with remaining Altair planned holes.
Strategic Review
Subsequent to the end of the financial year, the Board completed a strategic review of the lithium assets in its Nevada portfolio
with a view to optimizing its exploration portfolio and focusing on projects with the greatest potential to create value for
shareholders. While the Altair Lithium Project demonstrated encouraging anomalous to low-grade lithium results, the
mineralization sits beneath significant thicknesses of gravel overburden. Accordingly, it was decided not to renew the claims
for this project and the carrying value has been impaired.
- 10 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
Cobre
During the reporting period, the Company staked a new project, known as “the Cobre Lithium Project”, in north-east Nevada
(Figure 5). The Cobre Project is located east of Wells and close to the locality of Cobre, a historical interchange between the
Southern Pacific Railroad and the Nevada Northern Railway, which historically serviced the copper mining industry in Ely,
Nevada. The claims are considered prospective for claystone-hosted lithium deposits.
Figure 5. Map showing location of the Astute Lithium Projects.
Cobre Soil Sampling
Following the staking of the Cobre Project, the Company conducted a soil sampling program to detect the presence of lithiumin-soil, which may indicate the presence of lithium-bearing claystone.
The Company collected a total of 229 samples over the staked project area on a 400m x 100m sampling grid pattern, mostly
overlaying mapped outcropping tertiary sedimentary (Ts3) host rocks, considered prospective for lithium claystone
mineralisation.
- 11 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
The results were highly encouraging, with a peak value of 1,640ppm lithium and 23 results of over 100ppm lithium, which is
considered highly anomalous (Figure 6). The lithium-in-soil geochemistry, which highlights the prospective nature of the
Project, will be used to inform drill locations for permitting and subsequent drill testing.
Figure 6. Soil sample lithium geochemistry, Cobre Project claims.
Polaris and Kibby Basin
No work was undertaken at the Polaris and Kibby Basin Projects during the reporting period. Following the strategic review
outlined above, the Polaris Project was relinquished subsequent to the end of the financial year.
- 12 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
Governor Broome Heavy Mineral Sands Project
Introduction
The 100%-owned Governor Broome Mineral Sands Project is located approximately 95km by sealed road south of Busselton,
105km south of Iluka’s processing plant at Capel, and 135km from Bunbury Port and from Picton, where Doral has a heavy
mineral separation plant (Figure 7).
A 132kV power line is located just 5km to the north and a three-phase power line passes through the Governor Broome
Project, giving it significant strategic advantages from an infrastructure and access perspective.
Figure 7. Governor Broome Project Location, WA.
During the reporting period, the following activities were undertaken:
Acquisition of Fouracres Deposit
Astute acquired the Retention Licence R70/22 – otherwise known as “Fouracres” – from Tronox Limited subsidiary Cable
Sands (WA) Pty Ltd (“Cable Sands”). The Fouracres Deposit represents a significant strategic addition to Astro’s existing
Mineral Resource inventory at Governor Broome and has subsequently proven to be a key contributor to the value achieved
in the Scoping Study – as outlined below.
The Fouracres Deposit hosts Indicated Resource with a very high grade of 11.4% heavy minerals (“HM”). Cross-sections
through the mineralisation are shown as Figures 3 to 5.
The heavy mineral assemblage of the Fouracres Deposit is high value, comprising 75% ilmenite, 3% secondary ilmenite, 4%
leucoxene/rutile, and 8% zircon for a 90% VHM content. The ilmenite has a high TiO2 content of 60%.
In comparison the Jack Track Deposit contains a high-value heavy mineral assemblage of approximately 66.5% primary
ilmenite (58% TiO2), 14.5% secondary ilmenite (including approximately 8.5% leucoxene), 4.5% rutile, 10.5% zircon, and 0.8%
monazite – for an overall 96.5% valuable heavy mineral (“VHM”) content. The titanium minerals have an average composition
of 63% TiO2.
- 13 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
The Fouracres Deposit was explored using air-core drilling by Cable Sands during 1991. Cable Sands carried out a resource
estimation and mineralogical studies. The Fouracres Resources were re-estimated in 2011 to comply with the reporting
standards of the JORC code, using the results of the drilling and mineralogical studies that had been previously reported to
the Department of Mines and Petroleum. Details of the drilling and resource assessment are set out in JORC Code Table 1
detail in Appendix 1 to the announcement dated 13 July 2023. The map below shows the expanded Governor Broome Project
area, including the Fouracres Deposit, which now forms part of the expanded Governor Broome Project:
Governor
Broome
Jack
Track
Fouracres
Figure 8. Governor Broome – Resources and Licences, including Fouracres.
Acquisition terms
The terms of the acquisition were as follows:
•
A cash payment on settlement of $150,000; and
•
A 1% gross royalty on future production arising from the Fouracres Deposit.
Resource upgrade
The Company’s de-risking strategy for the Governor Broome Project included the successful execution of in-fill drilling, allowing
for the upgrade of high-value Inferred Mineral Resources to Measured and Indicated status, the acquisition of the high-grade
Fouracres deposit, located along strike from Jack Track, and the completion of a bulk testwork program on samples from the
most recent Jack Track drilling campaign.
The bulk testwork program was highly successful, demonstrating the amenability of the Jack Track Deposit to processing
through the feed preparation circuit using conventional mineral sands processing equipment. The material was processed
without difficulty with the sand fraction containing the valuable heavy minerals (Heavy Mineral Concentrate/HMC) readily
liberated from the slimes without the need for energy intensive processing equipment. Subsequent dry testwork demonstrated
that a range of ilmenite, leucoxene, rutile, and zircon products could be recovered from the heavy mineral concentrate.
Monazite was also recovered to a para-magnetic concentrate stream. Product qualities were consistent with other heavy
mineral products on the market.
Bulk test program
The Company completed a bulk testwork program on samples from the most recent Jack Track drilling campaign. The
testwork program was highly successful, demonstrating the amenability of the Jack Track Deposit to processing through the
feed preparation circuit using conventional mineral sands processing equipment. The material was processed without difficulty
- 14 - Astute Metals NL Annual Report 2024
ASTUTE METALS NL (formerly Astro Resources NL) AND CONTROLLED ENTITIES
A.B.N. 96 007 090 904
Review of Operations and Tenements
with the sand fraction containing the valuable heavy minerals (Heavy Mineral Concentrate/HMC) readily liberated from the
slimes without the need for energy intensive processing equipment. Subsequent dry testwork demonstrated that a range of
ilmenite, leucoxene, rutile, and zircon products could be recovered from the heavy mineral concentrate. Monazite was also
recovered to a para-magnetic concentrate stream. Product qualities were consistent with other heavy mineral products on the
market.
Scoping Study
During the reporting period, the Company advanced the Scoping Study for the Governor Broome Project, with the results
announced on 4 April 2024. The financial metrics from the Study were exceptionally positive, as tabulated below:
Metric
Capital cost
Unit
A$ million
Value
Average annual revenue
A$ million
125
Average annual operating cost
A$ million
83
Pre-tax NPV (at 10% discount rate)
A$ million
139
%
54
Pre-tax IRR
Weighted average revenue to cash cost ratio
(payback period)
Capital Payback Period
91
1.9
Years
<2
Table 2. Scoping Study Material outputs.
The Company confirms that all material assumptions underpinning the production targets and forecast financial
information derived from the Scoping Study results in the 4 April 2024 release continue to apply and have not
materially changed. The full release for the Scoping Study, including detailed assumptions, results and Cautionary
Statements is available in the ASX Announcement dated 4 April 2024.
Tenement
Category
Tonnage
(Mt)
HM
(%)
Slimes
(%)
Indicated
21
3.5
7.9
Total
41
3.9
8.2
Measured
8.0
5.0
13
Indicated
44
5.0
13
Inferred
7
3.5
12
Total
59
4.8
1
Share your feedback
Discover