Exploration Update - Lithium and Gold Projects
Released
Released
Announcement PDF
ASX / Media Release
23 October 2025
Suite 116 Level 1, 165-167 Phillip St Sydney, NSW 2000
GPO Box 2733, Sydney NSW 2001
P. +61 (0) 2 8046 2799 | E. admin@venariminerals.com
venariminerals.com
Lithium and Gold Programs Advancing with Assays Awaited and
Maiden Lithium Resource on Track for Late 2025
Highlights
Red Mountain Lithium Project, Nevada (USA)
• Red Mountain Reverse Circulation (RC) drilling campaign now completed
• Lithium Carbonate product metallurgical test-work underway
• USGS commissions a heli-magnetic and radiometric survey over Eastern Nevada, including
full coverage of Red Mountain
• Maiden Mineral Resource Estimate on track for delivery by end of CY25
Needles Gold-Silver Project, Nevada (USA)
• Assays pending for recent RC drilling across epithermal gold-silver targets
• Heli-magnetic and radiometric geophysical survey completed during October
• Assays for the high-density Needles soil sampling grid received
• Interpretation of geophysical survey and soil geochemistry data underway – this is expected to
advance understanding of the structure and extent of the Needles epithermal system and
generate future drill targets at the Project
Venari Minerals NL (“Venari”, “the Company” or “VMS”) is pleased to advise that it continues to make
strong progress across its key lithium and gold-silver projects in Nevada, USA, setting it up for a period
of strong news-flow and activity over the remaining two-and-a-half months of the year.
The Company has now completed its fourth exploration drilling campaign at the Red Mountain Lithium
Project,withthe 13-hole 2,679m (8,790ft) campaigncompleted andsamples from all drill-holes already
despatched to ALS laboratories in Elko (Figures 1 and 2, Table 1).
The drilling at Red Mountain follows the successful completion of an RC drilling campaign at the
Needles Gold-Silver Project, for which assays are also awaited. A program of geophysics (heli-magnetic
survey and radiometrics) has also been completed recently at Needles, with results awaited.
Astute Chairman, Tony Leibowitz, said:
“The team has done a fantastic job with the safe, efficient and timely completion of these two drilling
programs. All samples from the Needles campaign are in the laboratory, as are the samples from the
Red Mountain drilling. Together with ongoing metallurgical test-work on material from Red Mountain
and recently completed geophysical surveys at Needles, this sets Venari up for a busy and exciting
period ahead as we await key results from both projects and advance towards a key catalyst for the
Company – a maiden MRE at Red Mountain.”
2
newmurchgold.com.a
Red Mountain Lithium Project
Following the successful completion of attrition scrubbing beneficiation test-work announced last
week6
, the metallurgical test-work program continues for Red Mountain. The Company has engaged
Hazen Research Inc. to undertake Lithium Carbonate test-work for the project. This two-stage body of
work will initially aim to produce a technical-grade Lithium Carbonate product from Red Mountain
mineralisation, with a second stage aiming to upgrade the technical-grade product to a battery-grade
Lithium Carbonate product. Results are expected in the next seven weeks.
Figure 1. RC Drill rig set up over a hole at the Red Mountain lithium project
The United States Geological Survey (USGS) has announced that it has commissioned a helicopter-
borne magnetic and radiometric survey over Eastern and Central Nevada, commencing in October.
This survey will cover the Red Mountain Lithium Project in its entirety and is expected to enhance
geological understanding of the host rock package. The USGS news release regarding the survey can be
viewed here1
.
The Company is on track to round out the year with a maiden Mineral Resource Estimate (MRE) for the
Red Mountain Lithium Project. Background work has commenced with a due diligence site visit by the
JORC Competent Person completed and exploration data being digitised to support the MRE. Assay
results from the recently completed RC campaign will be included and these are expected to be
returned to the Company within the next 4-6 weeks, with the MRE to be completed in the weeks
thereafter.
3
newmurchgold.com.a
Figure 2. 2025 RC drill campaign collars with previous drilling and intersections over lithium in soil geochemistry4,5
4
newmurchgold.com.a
Needles Gold-Silver Project
Earlier in the month the Company completed an RC drilling campaign at the Needles Project2
. The 8-
hole 1,073m campaign was designed to test six gold and silver vein style targets at the under-explored
project3
. Samples from the drilling campaign are currently sitting with ALS laboratories in various stages
of preparation and analysis, with results expected to start being returned to the Company within 2-3
weeks.
Precision Geosurveys Inc. was engaged to conduct a helicopter-borne magnetic radiometric survey
over the Needles Project which was completed during October (Figure 3). Data has been received from
the survey, and interpretation is underway. The survey is expected to advance the technical team’s
understanding of the structure and extents of the epithermal system at Needles as well as feed into the
generation of additional drill targets at the project.
Figure 3. Helicopter magnetic-radiometric survey being undertaken at Needles
5
newmurchgold.com.a
Assays for an 824-point soil sampling campaign undertaken at the Needles Project in September have
now been received by the Venari technical team. The soil samples, taken on a high-resolution 100m x
100m grid pattern, are expected to generate new targets at the project through the identification of gold
and/or silver anomalies, or significant pathfinder element anomalism. Interpretation of results is
expected to be completed in the coming three weeks.
Figure 4. Location of Needles Gold Project, Red Mountain Lithium Project and other Nevada Lithium projects
6
newmurchgold.com.a
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMRC012 637010.3 4291916.6 1705.6 270.5 -50 152.4
RMRC013 637122 4291198.1 1708.8 90.5 -70 210.3
RMRC014 637192.5 4290568.7 1715.0 270.5 -70 121.9
RMRC015 637183.1 4290570.6 1714.7 90.5 -70 182.9
RMRC016 637019.9 4291604.7 1702.5 270.5 -50 167.6
RMRC017 637023.2 4291604.7 1702.6 - -90 182.9
RMRC018 637266.1 4289961.9 1724.3 270.5 -70 140.2
RMRC019 637892.1 4288689.1 1736.1 270.5 -50 219.5
RMRC020 637672.3 4288761.1 1725.5 270.5 -50 298.7
RMRC022 637532.2 4288202.5 1722.2 - -90 213.4
RMRC023 637420.9 4288217.3 1713.0 270.5 -50 274.3
RMRC024 637495.2 4287762.7 1724.5 270.5 -50 271.3
RMRC025 637239.8 4287748.1 1706.3 270.5 -60 243.8
Table 1. Red Mountain Project 2025 RC Drill campaign hole details
References
1 – USGS, https://www.usgs.gov/news/state-news-release/media-alert-low-level-flights-image-geology-map-critical-minerals-over
2 - ASX: ASE, 1 October 2025, High-impact drill program completed at Needles Gold-Silver Project and Red Mountain Lithium
Resource drilling underway
3 – ASX: ASE, 12 August 2025, Astute gears up to drill gold-silver targets at the Needles Gold Project, Nevada
4- ASX: ASE, 25 July 2025, Exceptional drill-hole intersects combined 170m of lithium mineralisation at Red Mountain
5- ASX: ASE, 3 September 2025, Outstanding lithium anomaly at Red Mountain Extension
6 – ASX: VMS, 15 October 2025, Metallurgical test-work delivers 132% upgrade to lithium mineralisation at Red Mountain, Nevada
Authorisation
This announcement has been authorised for release by the Board of Venari Minerals NL.
Join the Venari Minerals Investor Hub
Engage with Venari Minerals through accessing reports, presentations, interviews
and other Company content. Ask Questions and browse responses to other
investors’ questions. Click here and follow the prompts to sign up.
For further information, please contact:
Matthew Healy Nicholas Read
Executive Director & CEO Media & Investor Relations
T: +61 (0) 431 683 952 T: +61 (0) 419 929 046
E: matt@venariminerals.com E: nicholas@readcorporate.com.au
7
newmurchgold.com.a
Competent Persons
The information in this report that relates to the Needles Gold Project and Red Mountain Lithium Project
- Sampling Techniques and Data (Section 1) is based on information compiled by Mr. Matthew Healy, a
Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM
Member number 303597). Mr Healy is a full-time employee of Venari Minerals NL and is eligible to
participate in share-based incentive schemes of the Company. Mr Healy has sufficient experience that
is relevant to the style ofmineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Healy consents to the
inclusion in the report of the matters based on his information in the form and context in which it
appears.
The information in this report that relates to Red Mountain Lithium Project - Reporting of Exploration
Results (Section 2) is based on information compiled by Mr. Richard Newport, principal partner of
Richard Newport & Associates – Consultant Geoscientists. Mr. Newport is a member of the Australian
Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person under the 2012 Edition of the ’Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves‘. Mr. Newport consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
Share your feedback
Discover