Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX / Media Release
31 October 2025
Suite 116 Level 1, 165-167 Phillip St Sydney, NSW 2000
GPO Box 2733, Sydney NSW 2001
P. +61 (0) 2 8046 2799 | E. admin@venariminerals.com
venariminerals.com
30 September 2025 Quarterly Report
RC drilling commenced at the Red Mountain Lithium Project targeting a maiden
Mineral Resource Estimate by year-end; Exploration at the Needles Gold Project
confirms a significant gold-silver discovery opportunity with key targets drill tested
Highlights
Red Mountain Lithium Project, Nevada (USA)
• Final assays reported from April 2025 diamond drilling program, with hole RMDD008
intersecting 170.4m of lithium mineralisation across six zones, including 62.4m @ 1,210ppm
Li from 152.2m.
• Reverse Circulation (RC) drilling campaign designed and permitted, with drilling commencing
late in the quarter.
• The main focus of RC drilling is on the northern and central parts of the project area, with the
aim of delivering a maiden Mineral Resource Estimate (MRE) by the end of the year.
• Soil sampling at Red Mountain Extension outlined a strong 2.1km-long lithium-in-soil anomaly.
• The 297-sample campaign included high-grade lithium-in-soil results of up to 1,080ppm Li.
Needles Gold Project, Nevada (USA)
• RC drilling campaign designed, permitted and completed during the quarter.
• Six targets drill-tested, all of which exhibit high-grade gold and silver rock chip assays or strong
pathfinder anomalism.
• Samples from the campaign despatched to ALS Laboratories for assay, with results awaited.
• High-density 824-point soil sampling campaign completed.
• Soil sampling results expected to identify metal zonation and generate additional drill targets
within the large epithermal system.
Corporate
• Successful share placement completed raising $5.5 million (before costs), ensuring Venari is
well-funded to advance its Red Mountain Lithium Project to a maiden Mineral Resource and
conduct further exploration at the under-explored Needles Gold Project.
• Shareholders approved change in the Company’s name from “Astute Metals NL” to “Venari
Minerals NL”. Venari means “to hunt” and the new name reflects the Company’s strategy to
aggressively pursue new discoveries and identify and acquire high-quality growth assets.
Venari Minerals NL (ASX: VMS) (“Venari”, “the Company” or “VMS”) is pleased present its activities for
the quarter ended 30 September 2025.
2
newmurchgold.com.a
Red Mountain Lithium Project, Nevada
Located in central-eastern Nevada (Figure 1), adjacent to the Grand Army of the Republic Highway (Route
6), the Red Mountain Lithium Project was staked by Venari in August 2023.
Figure 1. Location of Venari’s Lithium Projects and other Nevada lithium deposits
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the Horse
Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium deposits (see Figure 1) such as
Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project and American Battery Technology
Corporation’s (NASDAQ: ABAT) 15.8Mt LCE Tonopah Flats deposit.
3
newmurchgold.com.a
Prior to the RC campaign that commenced during the September Quarter, a total of 19 drill holes had been
completed at the project for a combined 3,336m of drilling. These campaigns were highly successful,
intersecting strong lithium mineralisation in almost every hole.
Initial metallurgical test-work has also been very positive, with scoping leachability test-work on mineralised
material from Red Mountain indicating high leachability of lithium of up to 98%, varying with temperature,
acid strength and leaching duration, with beneficiation test-work also indicating the potential to upgrade the
Red Mountain mineralisation.
Work completed during the quarter
Diamond Drilling – Final assay results
The final batch of assay results from the April 2025 diamond drilling campaign were received during the
quarter. Hole RMDD008 (Figures 2 and 4, Table 1) returned six intersections of lithium mineralisation in
clay-bearing mudstones, siltstones and sandstones, for a combined 170.4m of lithium mineralisation,
including:
• 33.8m @ 1,130ppm Li / 0.60% Lithium Carbonate Equivalent (LCE) from 34.8m including an
internal high-grade zone of 10.7m @ 1,320ppm Li / 0.70% LCE from 41.5m; and
• 62.4m @ 1,210ppm Li / 0.64% LCE from 152.2m including an internal high-grade zone of 27.5m
@ 1,420ppm Li / 0.76% LCE from 176.7m.
Other intersections in RMDD008 are as follows:
• 13.1m @ 970ppm Li / 0.52% LCE from 6.7m
• 39.7m @ 859ppm Li / 0.46% LCE from 102.1m
• 13.8m @ 995ppm Li / 0.53% LCE from 224m
• 7.6m @ 945ppm Li / 0.50% LCE from 242.3m to end-of-hole
Drill-hole RMDD004 (Figure 4, Table 1) drilled through a sequence of sub-aerial coarse polymictic
conglomerate to breccia, with occasional narrow zones of claystone with low lithium content.
This conglomerate is interpreted to be a localised alluvial fan, as lithium-bearing claystone is present
at surface up-dip from the drill-hole (Figure 3). These results complete the assay dataset for the April
diamond drilling campaign at Red Mountain.
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMDD004 637593 4289988 1738 269 -50 306.3
RMDD008 637516 4286902 1731 269 -50 249.9
Table 1. Drill collar details
4
newmurchgold.com.a
Figure 2. RMDD008 interpretative cross-section, lithium geochemistry and surface samples
Figure 3. RMDD004 interpretative cross-section, lithium geochemistry and nearby (+/- 150m off section) rock chip
samples
RC Drilling Campaign
During the quarter, the Company commenced preparations for a Reverse Circulation (RC) drilling
campaign at the Red Mountain Lithium Project. Drill-hole designs were finalised for 16 holes (Figure 4),
and an associated Permitting Notice was filed with the Federal Bureau for Land Management (BLM).
5
newmurchgold.com.a
A drilling contract was executed with experienced drill contractor, Major Drilling, and drilling
commenced late in the quarter (Figure 5). The results from this campaign are expected to form the
foundation for a maiden Mineral Resource Estimate (MRE) for Red Mountain by the end of calendar
2025.
Figure 4. Red Mountain intersections and planned drill-holes over merged gridded lithium-in-soil geochemistry
6
newmurchgold.com.a
Figure 5. Major Drilling RC rig drilling night-shift on RMRC015
Red Mountain Extension Soil Sampling Results
The Red Mountain Extension Claims are located on the south-western boundary of the Red Mountain
Project and were staked in early 2024 with a view that, should exploration drilling at Red Mountain result
in the discovery of a lithium deposit, the extension claims may contain an along-strike extension of any
discovery. Since staking the Red Mountain Extension claims, exploration drilling at Red Mountain has
been highly successful, with 18 of the 19 holes for which assays have been returned to date intersecting
lithium mineralisation.
The Red Mountain Extension claims are located on a Wilderness Study Area (WSA), where surface
disturbance is not currently permitted. However, the WSA has been recommended for return to
multiple uses (which would allow for ground disturbing exploration) by the Federal Bureau of Land
Management, although this requires an Act of Congress in order to come into effect. A Nye County
Public Lands Bill has been drafted which, if passed by Congress in its current form, would result in
ground-disturbing exploration being allowed on the Red Mountain Extension. The Company has
expressed its support for the Lands Bill and will seek to rapidly advance the Red Mountain Extension
area if this occurs.
During the quarter, the Company received assay results for a 297-point soil sampling campaign
undertaken on the Red Mountain Extension, which revealed a large 2.1km x 1km area of lithium-in-soil
above 250ppm Li, with a maximum of 1,080ppm Li in soil (Figures 5 and 6). Results from a subsequent
20-sample rock chip sampling campaign confirmed lithium mineralisation in the underlying bedrock,
returning grades of up to an exceptional 2,690ppm Li (Figure 6). A complete table of rock chip sample
assay results and location details is provided in Appendix 3 of ASX release dated 3 September 2025.
These are outstanding results, with soils at Red Mountain Extension exhibiting a higher lithium tenor
than those observed in the soil grid on the Red Mountain claims block, and rock chip results confirming
lithium mineralisation in the underlying bedrock.
7
newmurchgold.com.a
Figure 6. Red Mountain merged gridded soil geochemistry, rock chip sample geochemistry
(new rock chip sampling areas outlined in dashed Red) and Exploration Targets A and B
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 2 is conceptual in nature. There
has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further exploration
will result in the estimation of a Mineral Resource. The Exploration Targets have been prepared and reported in
accordance with the 2012 edition of JORC Code.
The Exploration Targets have been defined through interpretation of exploration results conducted by the
Company including soil sample and rock chip geochemistry, geological mapping, structural measurements and
reverse circulation and diamond drilling. Refer to the original ASX Release dated 12 February 2025
8
newmurchgold.com.a
Further, these results indicate that the Red Mountain Extension is highly prospective for a continuation
of the Red Mountain lithium mineralisation and warrant the Company maintaining the Red Mountain
Extension claims until the outcome of the Nye County lands bill issue is known.
Nevada Lithium Claim Optimisation
A review of the data collected to date at Red Mountain, coupled with an improved geological
understanding of the rocks beneath the claim block, revealed zones within the project area that are not
prospective for economic lithium mineralisation. After accounting for a ‘buffer zone’ around
prospective rocks, the Company elected not to renew these peripheral claims.
These changes resulted in an optimised claim area, enabling Venari to focus its resources and in-
ground expenditure on the most prospective areas. The new project mining claims coverage is shown
in Figure 6.
During the quarter, the Company also conducted a review of its other lithium exploration project in
Nevada - the Cobre Project – and elected not to renew the mining claims. The Cobre Project was
considered to have potential, subject to the ability to increase the size of the project through the
acquisition of adjacent ground.
However, the Company has reviewed the opportunities available and has established that it is unable
to consolidate sufficient additional ground to warrant retaining the Project.
9
newmurchgold.com.a
Needles Gold Project, Nevada
The 100%-owned Needles Project comprises 216 unpatented lode mining claims covering an area of
18km2
and lies 92km east of the mining town of Tonopah in Nye County, Nevada, USA (Figure 7). The
project was acquired due to its geological similarities with bulk-tonnage gold operations in Nevada
such as the 20Moz+ Round Mountain mine.
Figure 7. Location of Needles Gold Project, and significant Nevada gold deposits
10
newmurchgold.com.a
Previously known as the Arrowhead district, the project includes numerous historical gold-silver
workings dating from the early 1900’s to 1920’s, with some of notable scale. While historical records
are sparse, the Arrowhead Mine is recorded as an incline shaft to 350ft (106.7m) with drifting on four
levels, and the Arrowhead Extension Mine was a 150ft (45.7m) two-compartment shaft with two working
levels. These operations mined bonanza-style epithermal vein gold and silver mineralisation.
The current project area has seen a number of previous explorers including Newcrest (2002-04), Taranis
Resources (2002-07), Excalibur Resources (2007-09) and Greenock Resources, amongst others. The
Needles Project hosts a large, under-explored epithermal system fertile for gold and silver, with rock
chip results of up to 33g/t Au and 1,115g/t Ag. Existing drilling is mostly shallow, and alteration
mineralogy and pathfinder geochemistry suggests that the most prospective exploration space is yet to
be tested.
Work completed during the quarter
Drilling campaign
During the quarter, Venari permitted and completed a Reverse Circulation (RC) drilling campaign at the
Project. A series of six high-priority vein-style gold-silver targets were tested as part of the eight-hole
campaign, which concluded shortly after the end of the quarter (Table 2).
Experienced international drill contractor, Major Drilling Group International Inc. was contracted to
undertake the drilling program.
Figure 8. Major RC drill rig and support vehicles mobilising to the first drill site at Needles
11
newmurchgold.com.a
The six targets tested through the drilling campaign were the Eastern Shaft, Tomahawk, Arrowhead,
Arrowhead East (two targets) and Whopper Junior (Figure 10).
Eastern Shaft
The Company drilled two holes targeting beneath a cluster of 10 high-grade rock chips taken from
outcrop and mineralised dumps proximal to the shaft. These samples, which were collected in two
separate campaigns, ranged in grade from 1.4 –33.0g/t Au and 12.2 – 622g/t Ag. Previous drill-holes at
the Eastern Shaft, which intersected no material gold-silver mineralisation, had not effectively tested
the interpreted east-southeast trend of the rock chips, and were drilled away from the historical shaft.
Tomahawk
Two holes drilled by the Company at the Tomahawk prospect tested a previously undrilled ~200m east-
west trend of high-grade rock chip samples which includes the historical Tomahawk Shaft and another
<15m deep historical mine shaft. Rock chips taken along this trend include dump samples from the
Tomahawk Mine itself. Apart from a single low-grade sample of 17ppb Au and 0.4g/t Ag, the remaining
five samples range from 0.31 – 5.54g/t Au and 10.6g/t – 406g/t Ag.
Arrowhead
A single hole was drilled to test for mineralisation down-dip below the historical mine. Previous drilling
tested for mineralisation in the shallows along strike from the Arrowhead shaft, however this drilling did
not test down-dip of the known mineralisation. Intersections to the north and south of the mine include:
• Needles-63 intersected 3.42m @ 2.92g/t Au and 905g/t Ag from 25.54m
• Needles-28 intersected 6.5m @ 0.95g/t Au and 235g/t Ag from 26.2m
• Needles-27 intersected 1.4m @ 1.7g/t Au and 528g/t Ag from 31.2m
• Needles-11 intersected 1.6m @ 3.8g/t Au and 546g/t Ag from 17.6m
• Needles-7 intersected 6.1m @ 1.46g/t Au and 424g/t Ag from 26m
Arrowhead East Targets
Two separate targets were drill tested at Arrowhead East. Both targets sit on a north-west trend
characterised by high gold-silver ratio rock chips with no previous drilling. The northernmost of the two
targets returned rock chip results of 1.11g/t Au and 5.4g/t Ag with strong arsenic of 6,640ppm. The
southern target hole will be drilled beneath a cluster of rock chips grading up to 0.59g/t Au and up to
3.3g/t Ag, and strong arsenic of 1,860ppm to 5,500ppm As. The strength of pathfinder geochemistry at
this prospect is interpreted to reflect proximity to better developed mineralisation. One hole will be
drilled at each of the two Arrowhead East targets.
Whopper Junior
The Whopper Junior prospect exhibits anomalous gold (up to 0.39g/t Au) and silver (up to 72g/t Ag) in
rock chip samples, as well as elevated pathfinder elements such as arsenic (up to 4,800ppm As),
antimony (up to 87ppm Sb) and mercury (up to 4ppm Hg). A small number of holes have been drilled at
the prospect, including Needles-5, which intersected a broad zone of strong pathfinder anomalism -
23.5m @ 3,875ppm As, 36.7ppm Sb and 1.48ppm Hg. Arsenic and antimony are well-established
pathfinder elements in epithermal gold-silver systems, and mercury is typically found above the gold-
bearing zone, as its volatility causes its upward migration to the near surface where it is deposited. One
12
newmurchgold.com.a
hole was drilled at Whopper Junior testing for mineralisation at deeper levels than the previous drilling,
where the potential for gold-silver mineralisation is interpreted to be heightened.
Hole ID Prospect
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azi
(°)
Dip
(°)
Depth
(m)
AERC001 Arrowhead East 572922 4215734 1,885 40 -50 121.9
AERC002 Arrowhead East 572782 4215855 1,887 40 -60 100.6
AHRC001 Arrowhead Mine 572388 4215545 1,929 60 -50 152.4
ESRC001 Eastern Shaft 573208 4215690 1,868 360 -50 76.2
ESRC002 Eastern Shaft 573208 4215690 1,868 360 -80 128
THRC001 Tomahawk 571527 4214914 1,978 350 -60 76.2
THRC002 Tomahawk 571527 4214914 1,978 350 -80 137.2
WJRC001 Whopper Jnr 571515 4216974 1,899 55 -60 280.4
Table 2. Needles Gold Project 2025 RC drill-hole details
The drilling program undertaken during the quarter was completed on 1 October 2025. Assay results
for the Needles drilling are expected to be returned in approximately 5-7 weeks.
Figure 9. Collected soil samples over ASTER kaolinite and illite mineralogy
13
newmurchgold.com.a
Soil sampling campaign
The Company has undertaken a systematic soil sampling campaign at the Needles Gold Project. A total
of 824 samples were collected as part of the campaign, which formed a 100m x 100m grid of points
covering the full extents of the interpreted epithermal gold system, as identified from kaolinite and illite
alteration in ASTER imagery (Figure 9).
The purpose of the sampling program is to identify new zones of gold and silver anomalism and evaluate
metal zonation across the project, which will assist in understanding the most prospective target areas
for future drilling.
14
newmurchgold.com.a
Georgina Basin IOCG Project, Northern Territory
Located in the highly prospective East Tennant Province in the Northern Territory, the Georgina Project
comprises sevengrantedExploration Licences and three under application,for a combined total of over
3,000km2
. Venari Metals is the 100% owner of the Georgina Project.
The East Tennant Province has been the subject of intense geoscientific investigation by both
Geoscience Australia and the Northern Territory Geological Survey for over five years. Pre-competitive
work undertaken as part of the Federal Government’s $225 million Exploring for the Future program
(EFTF) included solid geology interpretation, alteration proxy mapping and mineral prospectivity
mapping for Iron Oxide Copper Gold (IOCG) deposits. The collaborative MinEx CRC National Drilling
Initiative, conducted in late 2020, confirmed the highly prospective nature of the region by intersecting
prospective host rocks, IOCG-style alteration and sulphide mineralisation as part of a 10-hole program
at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some smaller
high-grade variants – most notably those at Tennant Creek. This style of deposit contains elevated
levels (10-60wt %) of the iron oxide minerals magnetite and hematite, which gives rise to their (typically)
elevated magnetic and gravity (density) properties. Australian IOCG’s include the Olympic Dam,
Prominent Hill and Carrapateena deposits in South Australia; Ernest Henry in north-west Queensland;
and the high-grade Warrego and Juno deposits, located west of the Georgina Project at Tennant Creek
in the Northern Territory.
Figure 10. Georgina IOCG Project tenements
Work completed during the quarter
No work was completed during the quarter for the Georgina Basin Project.
15
newmurchgold.com.a
Governor Broome Mineral Sands Project, WA
The 100%-owned Governor Broome Mineral Sands Project is located approximately 95km by sealed
road south of Busselton in Western Australia, 105km south of Iluka’s processing plant at Capel, and
135km from Bunbury Port and from Picton, where Doral has a heavy mineral separation plant (Figure
11). A 132kV power line is located just 5km to the north and a three-phase power line passes through
the Governor Broome Project, giving it significant strategic advantages from an infrastructure and
access perspective.
Tenement Category Tonnage (Mt) HM (%) Slimes (%)
R70/58
Jack Track
Measured 20.2 4.2 8.4
Indicated 21 3.5 7.9
Total 41 3.9 8.2
R70/53
Governor Broome
Measured 8.0 5.0 13
Indicated 44 5.0 13
Inferred 7 3.5 12
Total 59 4.8 12.5
R70/22
Fouracres
Indicated 0.72 11.4 6.5
Inferred 0.2 3.5 9
Total 0.93 9.6 7.1
Project
Measured 28.4 4.4 9.7
Indicated 66 4.5 12
Inferred 7 3.5 12
Total 101 4.5 11
Table 3. Governor Broome Project Mineral Resources – at a 2% HM lower block-cut-off grade
Note that the above figures have been appropriately rounded.
The Fouracres Resources estimated at a 3% Heavy Mineral (HM) lower block-cut-off grade
Governor Broome and Jack Track Resources estimated at a 2% HM lower block-cut-off grade
The Company has progressed its de-risking strategy for the Governor Broome Project over the past two
years, with the successful execution of in-fill drilling allowing for the upgrade of Inferred Mineral
Resources to high-value Measured and Indicated status (Table 3), the acquisition of the high-grade
Fouracres deposit, located along strike from Jack Track, and the completion of a bulk test-work
program on samples from the most recent Jack Track drilling campaign.
The bulk test-work program was highly successful, demonstrating the amenability of the Jack Track
Deposit to processing through the feed preparation circuit using conventional mineral sands
processing equipment. The material was processed without difficulty with the sand fraction containing
the valuable heavy minerals (Heavy Mineral Concentrate/HMC) readily liberated from the slimes
without the need for energy intensive processing equipment.
Furthermore, subsequent dry test-work demonstrated that a range of ilmenite, leucoxene, rutile and
zircon products could be recovered from the heavy mineral concentrate. Monazite was also recovered
16
newmurchgold.com.a
to a para-magnetic concentrate stream. Product qualities are consistent with other heavy mineral
products on the market.
Scoping Study
In April 2024, the Company announced the results from the Scoping Study for the Governor Broome
Project and the financial metrics from the Study were exceptionally positive, as tabulated below:
Metric Unit Value
Capital cost A$ million 91
Average annual revenue A$ million 125
Average annual operating cost A$ million 83
Pre-tax NPV (at 10% discount rate) A$ million 139
Pre-tax IRR % 54
Weighted average revenue to cash cost ratio (payback period) - 1.9
Capital Payback Period Years <2
Table 4. Scoping Study material outputs
The full release for the Scoping Study, including detailed assumptions, results and Cautionary
Statements is available in the ASX Announcement dated 4 April 2024.
The Company confirms that all material assumptions underpinning the production targets and
forecast financial information derived from the Scoping Study results in the 4 April 2024 release
continue to apply and have not materially changed.
Figure 11. Governor Broome Project Location, WA.
17
newmurchgold.com.a
Work During the Quarter
No work was undertaken during the quarter on the Governor Broome Project. The Company continues
to actively investigate its options for realising value from the Project, including through potential joint
ventures, an outright trade sale and other avenues.
18
newmurchgold.com.a
Corporate
Capital raising
During the quarter, the Company successfully completed a capital raising by way of a two-tranche
placement to sophisticated investors under Listing Rule 7.1 at an issue price of $0.015 cents per share.
The amount raised was $5.5 million (before costs). Details of the capital raising were as follows:
Tranche Number of shares Raised (before costs)
Tranche 1 92,721,038 $1,390,816
Tranche 2 273,945,629 $4,109,184
Total 366,666,667 $5,500,000
Table 5. Capital raising details
The placement was supported by major shareholder Holdmark Property Group who increased their
position to approximately 19% of the Company, together with Chairman, Mr Tony Leibowitz, and
Directors Matthew Healy and Vince Fayad.
The funds raised will be used to fund ongoing exploration of the Company’s Red Mountain Lithium and
Needles Gold Projects and for working capital purposes.
Share Purchase Plan
The Company launched its share purchase plan (SPP) during the quarter with an intention to raise
$500,000. The SPP closed after 30 September 2025, and further details will be provided in the 31
December 2025 quarterly release.
Change of name and ASX ticker
Following receipt of shareholder approval at the Company’s General Meeting held on 12 September
2025, the Company completed its name change to Venari Minerals. The new ticker of VMS was
approved post the end of the 30 September 2025 quarter.
Change in share registry
During the quarter, the Company advised that in accordance with Listing Rule 3.15.1, as of Monday, 14
July 2025, responsibility for the Company’s share registry services was transferred from MUFG
Corporate Markets Limited (MUFG) to Xcend Pty Ltd (XCEND). Further details can be found in the ASX
release dated 14 July 2025.
Change of Registered Office Address
The Company also advised that effective from the 14 July 2025, its registered office address has
changed to the following:
Suite 116, Level 1, 165 Phillip Street
Sydney
NSW 2000
19
newmurchgold.com.a
Competent Persons Statements
Nevada Lithium Projects
The information in this report that relates to Nevada Lithium Projects Sampling Techniques and Data
(Section 1) is based on information compiled by Mr Matthew Healy, a Competent Person who is a
Member of The Australasian Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr
Healy is a full-time employee of Venari Minerals NL and is eligible to participate in Share-based
incentive schemes of the Company. Mr Healy has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Healy consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Nevada Lithium Projects Reporting of Exploration
Results (Section 2) is based on information compiled by Mr Richard Newport, principal partner of
Richard Newport & Associates – Consultant Geoscientists. Mr Newport is a member of the Australian
Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person under the 2012 Edition of the ’Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves‘. Mr. Newport consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
Georgina Basin
The information in this report that relates to Exploration Results associated with the NT Georgina
project is based on information compiled by Mr Matthew Healy, a Competent Person who is a Member
of The Australasian Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a
full-timeemployee of Venari Minerals NL and is eligibleto participate in share-based incentive schemes
of the Company. Mr Healy has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
Governor Broome
The information in this report as it relates to MineralResources and Exploration Resultsfor the Governor
Broome Project is based on information compiled by John Doepel, a Director of Continental Resource
Management Pty Ltd (CRM), who is a member of the Australasian Institute of Mining and Metallurgy. Mr
Doepel has sufficient experience in mineral resource estimation relevant to the style of mineralisation
and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr Doepel consents to the inclusion in this announcement of the information in the form and context in
which it appears.
20
newmurchgold.com.a
Exploration Targets
The information in this report that relates to Exploration Targets is based on information compiled by
Mr. Richard Newport, principal partner of Richard Newport & Associates – Consultant Geoscientists.
Mr. Newport is a member of the Australian Institute of Geoscientists and has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person under the 2012 Edition of the
’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves‘. Mr.
Newport consents to the inclusion in this announcement of the matters based on this information in
the form and context in which it appears.
The initial exploration target included this release was originally announced on 12 February 2025 and
has been wholly based on previously announced exploration results for the Red Mountain Project. The
ASX releases for these results, including the relevant JORC Table 1 disclosures, are listed as follows:
• ASX: ASE 20 November 2023 ‘Large lithium soil anomalies discovered at Red Mo
Share your feedback
Discover