Thick, high-grade lithium intersected at Red Mountain, Nevada
First assays initiate phase of catalyst-rich news flow
Highlights
• Excellent initial assay results received from recently completed October drilling campaign.
• Drill-hole RMRC022 intersected a combined 161.5m of lithium mineralisation, including:
o 22.9m @ 1,510ppm Li from 36.6m;
o 7.6m @ 1,480ppm Li from 71.6m;
o 9.1m @ 1,370ppm Li from 97.5m; and
o 25.9m @ 1,400ppm Li from 149.4m
• Drill-hole RMRC023 intersected a combined 164.7m of lithium mineralisation, including:
o 30.5m @ 1,400ppm Li from 67.1m;
o 18.3m @ 1,360ppm Li from 128m;
o 6.1m @ 2,660ppm Li from 176.8m; and
o 21.3m @ 1,420ppm Li from 253m to end-of-hole
• Results firm up mineralised lenses mid-project ahead of maiden Mineral Resource Estimate.
• Assays outstanding for the remaining Red Mountain holes, expected in the coming fortnight.
Venari Minerals NL (ASX: VMS) (“Venari”, “the Company” or “VMS”) is pleased to report assay results
from the first two of 13 holes completed as part of its October 2025 Reverse Circulation (RC) drilling
campaign at the 100%-owned Red Mountain Lithium Project in Nevada, USA.
Congestion at US labs, driven by a boom in critical and precious metals exploration, has resulted in
delays to assay results from recent drilling at the Company’s Needles Gold and Red Mountain Lithium
Projects. The receipt of this first batch of results marks the beginning of a period of strong news-flow as
19 drill-holes of outstanding assays from the two projects are received over the next two to three weeks.
Drill-holes RMRC022 and RMRC023 both intersected multiple zones of strong lithium mineralisation,
including a number of high-grade zones:
Hole RMRC022
• 62.5m @ 1,090ppm Li / 0.58% Lithium Carbonate Equivalent (LCE) from surface, including
22.9m @ 1,510ppm Li / 0.81% LCE from 36.6m; and
• 15.2m @ 1,070ppm Li / 0.57% LCE from 70.1m, including 7.6m @ 1,480ppm Li / 0.79% LCE
from 71.6m; and
• 15.2m @ 1,070ppm Li / 0.57% LCE from 96m, including 9.1m @ 1,370ppm Li / 0.73% LCE from
97.5m; and
2
newmurchgold.com.a
• 68.6m @ 1,080ppm Li / 0.57% LCE from 115.8m, including 25.9m @ 1,400ppm Li / 0.75% LCE
from 149.4m
Hole RMRC023
• 10.7m @ 839ppm Li / 0.45% LCE from surface; and
• 80.8m @ 990ppm Li / 0.53% LCE from 16.8m, including 30.5m @ 1,400ppm Li / 0.74% LCE from
67.1m; and
• 18.3m @ 1,360ppm Li / 0.72% LCE from 128m; and
• 6.1m @ 2,660ppm Li / 1.42% LCE from 176.8m; and
• 48.8m @ 1,040ppm Li / 0.55% LCE from 225.6m including 21.3m @ 1,420ppm Li / 0.75% LCE
from 253m to end-of-hole.
Venari Chairman, Tony Leibowitz, said:
“This is an excellent start for the flow of results from our recently completed October drilling campaign
at Red Mountain. Results from the first two holes have returned wide intersections including numerous
high-grade zones. These two holes in-fill the mid-project zones and provide us with increased
confidence in the continuity and robustness of the deposit in the central part of the project. This puts us
firmly on track to deliver a maiden Mineral Resource Estimate for Red Mountain in December, and we
look forward to reporting additional results in the coming weeks.”
Results and Next Steps
The multiple thick zones of lithium mineralisation encountered in RMRC022 and RMRC023 are
consistent with those intersected in previous drill-holes mid-project (Figure 2), with strong lithium
mineralisation now intersected in all five drill-holes located on-section (Figure 1).
Figure 1. RMRC022-023 preliminary interpretative cross-section, lithium grade and (35m off-section) surface samples.
3
newmurchgold.com.a
There are 11 holes from the Red Mountain campaign for which assays remain pending, with these
results expected to be received in the coming fortnight. Once received, these results will inform the
estimation of a maiden Mineral Resource, expected to be completed by the end of the calendar year.
Figure 2. Red Mountain north and central drill intersections over gridded soil geochemistry image.
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMRC022 637532.2 4288202.5 1698.1 270.5 -50 274.3
RMRC023 637420.9 4288217.3 1688.6 - -90 213.4
Table 1. Drill collar details
4
newmurchgold.com.a
Background
Located in central-eastern Nevada (Figure 3), adjacent to the Grand Army of the Republic Highway (Route
6), the Red Mountain Project was staked by Venari in August 2023.
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the Horse
Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium deposits (see Figure 3) such as
Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3
and American Battery Technology
Corporation’s (NASDAQ: ABAT) 15.8Mt LCE Tonopah Flats deposit4
.
Prior to the current campaign, a total of 19 drill holes had been completed at the project to date for a
combined 3,336m of drilling across three campaigns. These campaigns have been highly successful,
intersecting strong lithium mineralisation in almost every hole6
.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration5
, and beneficiation test-
work has indicated the potential to upgrade the Red Mountain mineralisation1,2,7
.
Figure 3. Location of Red Mountain and other Nevada Lithium projects.
5
newmurchgold.com.a
References
1 – ASX: ASE, 22 April 2025, Beneficiation testwork successfully upgrades mineralisation at Red Mountain
2 - ASX: ASE, 10 June 2025, Beneficiation Delivers 4,480ppm Lithium Clay Concentrate at Red Mountain
3 - NYSE: LAC, 31 December 2024, Updated NI 43-101 Technical Report for the Thacker Pass Project
4 - OTCMKTS: ABML, 26 February 2023, Technical Report Summary for The Tonopah Flats Lithium Project, Esmeralda
5 - ASX: ASE, 9 December 2024, Positive initial metallurgical results from Red Mountain
6 - ASX: ASE, 25 June 2025, Exceptional Drill-hole Intersects combined 170m of Lithium Mineralisation at Red Mountain
7 - ASX: ASE, 3 September 2025, Outstanding lithium anomalism in surface sampling at Red Mountain Extension
8 – ASX: VMS, 15 October 2025, Metallurgical test-work delivers 132% upgrade to lithium mineralisation at Red Mountain, Nevada
Authorisation
This announcement has been authorised for release by the Board of Venari Minerals NL.
Join the Venari Minerals Investor Hub
Engage with Venari Minerals through accessing reports, presentations, interviews
and other Company content. Ask Questions and browse responses to other
investors’ questions. Click here and follow the prompts to sign up.
For further information, please contact:
Matthew Healy Nicholas Read
Executive Director & CEO Media & Investor Relations
T: +61 (0) 431 683 952 T: +61 (0) 419 929 046
E: matt@venariminerals.com E: nicholas@readcorporate.com.au
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a full-time employee
of Venari Minerals NL and is eligible to participate in share-based incentive schemes of the Company.
Mr Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
6
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
5.5” reverse circulation drilling was
undertaken for drill sample
collection. Samples were collected
on a 5-foot basis in calico bags,
with approximate 30% split
retained from a rotary cone splitter
for lab assay. Water was injected
throughout the hole.
Nominal small drill sample was
collected for chip tray records
Samples were air dried on elevated
grid mesh until practical to
transport
Claystone hosted lithium deposits
are thought to form as a result of
the weathering of lithium-bearing
volcanic glass within tertiary-aged
tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of
lithium from geothermal sources
have also been proposed.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
5.5” Reverse Circulation drilling
methods employed using a cross-
over sub immediately behind the
hammer.
7
newmurchgold.com.a
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries
and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Sample recoveries to be measured by
dry sample weight at the laboratory
prior to assay.
Some instances of poor recovery
noted.
Instances of poor recovery are not
expected to materially impact
interpretation of results
Logging Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of
the relevant intersections logged.
Drill cuttings of entire hole logged
for lithology by consultant
geologist
Logging is qualitative with selective
quantitative logging (e.g. quartz
veining)
Chip tray photography undertaken
on all full drill holes
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the
sampling isrepresentative of the in-situ
material collected,including for instance
results for field duplicate/second-half
sampling.
Samples 30% split using a rotary cone
splitter and submitted to ALS
Laboratories in Elko for preparation
and analysis.
8
newmurchgold.com.a
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to
thegrain size of thematerial being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used andwhether the technique is
considered partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and theirderivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
Samples analysed by method ME-
MS61 which is an ICP-MS method
employing a 4-acid digest.
A comparison of aqua-regia and 4-
acid digests was undertaken for Red
Mountain mineralisation, with no
material difference in lithium results
identified.
Assay quality was monitored using
pulp blanks, as well as certified
reference materials (CRMs) at a range
of lithium grades. Pulp blank results
indicated no material contamination
of samples from sample preparation
or during the analytical process. CRM
results were within 3 standard
deviations of certified values. No
material systematic bias nor other
accuracy related issues were
identified.
Verification
of sampling
and
assaying
The verification of significant intersections
byeither independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entryprocedures, data verification, data
storage(physical and electronic)
protocols.
Discuss any adjustment to assay data.
Sample intervals assigned a unique
sample identification number
prior to sample despatch
Lithium-mineralised claystone
Certified Reference Materials
(standards), pulp blanks and coarse
blanks inserted into the sample
stream at regular intervals to monitor
lab accuracy and potential
contamination during sample prep
and analysis.
Location of
data points
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar locations determined using
hand held GPS with location reported
in NAD83 UTM Zone 11 with expected
accuracy of +/- 10m
Downhole surveys conducted on drill
holes at nominal 100ft intervals, with
drill rigs lined up by compass and
clino at start of hole.
9
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria JORC Code explanation Commentary
Data
spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Drill spacing appropriate for early
stage exploration
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Claystone beds are regionally
shallow-dipping at ~20°-45° to the
east and varying locally across the
Project with some evidence of faulting
and potential folding.
Sample
security
The measures taken to ensure sample
security.
Samples stored at secured yard and
shed located in township of Currant
until delivered by staff or contractors to
the ALS labs
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Not applicable
10
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Red Mountain Claims held in 100%
subsidiary Needles Holdings Inc.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified
by the Bureau of Land Management
(BLM)
Exploration
done by
other parties
Acknowledgment and appraisal of
exploration by other parties.
No known previous lithium exploration
conducted at Red Mountain.
Exploration conducted elsewhere in
Nevada by other explorers referenced in
body text.
Geology Deposit type, geological setting and style
of mineralisation.
The principal target deposit style is
claystone hosted lithium
mineralisation. Claystone hosted
lithium deposits are thought to form as
a result of the weathering of lithium-
bearing volcanic glass within tertiary-
aged tuffaceous lacustrine sediments
of the mapped Ts3 unit.
Lacustrine environments formed as a
result of extensional tectonic regime
that produced ‘basin and range’
topography observed across the state
of Nevada. Inputs of lithium from
geothermal sources have also been
proposed.
11
newmurchgold.com.a
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
• easting and northing of the drill
hole collar
• elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception
depth
• hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Drill hole information is tabulated in
body text and/or shown in relevant
maps.
Data
Aggregation
Methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated
Intersections, where quoted are
weighted by length. Lengths originally
recorded in feet are quoted to the
nearest 10cm.
Rounding is conducted to 3 significant
figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance
for 10ft of internal dilution by lower
grade material.
Low grade mineralisation (300-500ppm
Li) is present outside of the quoted
intersections
Intersections are quoted in both lithium
ppm and as wt% Lithium Carbonate
Equivalent (LCE). LCE is calculated as
LCE = Li (ppm) x 5.323 / 10,000, as per
industry conventions
12
newmurchgold.com.a
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Insufficient information available due to
early exploration status, although
interpretation to date is that
intersections in this hole approximate
true width.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Included in ASX announcement.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
This release describes all relevant
information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
This release describes all relevant
information
Further work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
The Red Mountain lithium project is
emerging as a significant lithium
discovery in Nevada and is being
advanced toward a maiden Mineral
Resource Estimate later this year. It is
the Company’s intent to advance the
project beyond this to technical
studies.
13
newmurchgold.com.a
APPENDIX 2 – Red Mountain Drilling Sample Assay Table
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Sample
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC023 0 5 631 0.34 RMRC023 210 215 770 0.41
RMRC023 5 10 940 0.50 RMRC023 215 220 738 0.39
RMRC023 10 15 851 0.45 RMRC023 220 225 1110 0.59
RMRC023 15 20 836 0.45 RMRC023 225 230 1265 0.67
RMRC023 20 25 995 0.53 RMRC023 230 235 846 0.45
RMRC023 25 30 1015 0.54 RMRC023 235 240 1290 0.69
RMRC023 30 35 602 0.32 RMRC023 240 245 1240 0.66
RMRC023 35 40 490 0.26 RMRC023 245 250 1720 0.92
RMRC023 40 45 291 0.15 RMRC023 250 255 1765 0.94
RMRC023 45 50 345 0.18 RMRC023 255 260 1365 0.73
RMRC023 50 55 466 0.25 RMRC023 260 265 1140 0.61
RMRC023 55 60 899 0.48 RMRC023 265 270 925 0.49
RMRC023 60 65 1015 0.54 RMRC023 270 275 680 0.36
RMRC023 65 70 1045 0.56 RMRC023 275 280 1730 0.92
RMRC023 70 75 906 0.48 RMRC023 280 285 1510 0.80
RMRC023 75 80 588 0.31 RMRC023 285 290 1425 0.76
RMRC023 80 85 1030 0.55 RMRC023 290 295 1245 0.66
RMRC023 85 90 1070 0.57 RMRC023 295 300 1215 0.65
RMRC023 90 95 949 0.51 RMRC023 300 305 1795 0.96
RMRC023 95 100 920 0.49 RMRC023 305 310 1830 0.97
RMRC023 100 105 393 0.21 RMRC023 310 315 1970 1.05
RMRC023 105 110 570 0.30 RMRC023 315 320 1840 0.98
RMRC023 110 115 820 0.44 RMRC023 320 325 361 0.19
RMRC023 115 120 934 0.50 RMRC023 325 330 163.5 0.09
RMRC023 120 125 837 0.45 RMRC023 330 335 62.1 0.03
RMRC023 125 130 581 0.31 RMRC023 335 340 69 0.04
RMRC023 130 135 805 0.43 RMRC023 340 345 533 0.28
RMRC023 135 140 1060 0.56 RMRC023 345 350 471 0.25
RMRC023 140 145 982 0.52 RMRC023 350 355 355 0.19
RMRC023 145 150 562 0.30 RMRC023 355 360 402 0.21
RMRC023 150 155 945 0.50 RMRC023 360 365 116 0.06
RMRC023 155 160 530 0.28 RMRC023 365 370 86.2 0.05
RMRC023 160 165 651 0.35 RMRC023 370 375 93.2 0.05
RMRC023 165 170 340 0.18 RMRC023 375 380 134.5 0.07
RMRC023 170 175 441 0.23 RMRC023 380 385 134.5 0.07
RMRC023 175 180 602 0.32 RMRC023 385 390 180 0.10
RMRC023 180 185 546 0.29 RMRC023 390 395 641 0.34
RMRC023 185 190 522 0.28 RMRC023 395 400 1420 0.76
RMRC023 190 195 518 0.28 RMRC023 400 405 932 0.50
RMRC023 195 200 491 0.26 RMRC023 405 410 163.5 0.09
RMRC023 200 205 576 0.31 RMRC023 410 415 281 0.15
RMRC023 205 210 939 0.50 RMRC023 415 420 476 0.25
14
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Sample
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC023 420 425 2320 1.23 RMRC023 630 635 358 0.19
RMRC023 425 430 2590 1.38 RMRC023 635 640 287 0.15
RMRC023 430 435 1810 0.96 RMRC023 640 645 908 0.48
RMRC023 435 440 2140 1.14 RMRC023 645 650 239 0.13
RMRC023 440 445 744 0.40 RMRC023 650 655 494 0.26
RMRC023 445 450 636 0.34 RMRC023 655 660 606 0.32
RMRC023 450 455 1010 0.54 RMRC023 660 665 338 0.18
RMRC023 455 460 764 0.41 RMRC023 665 670 105 0.06
RMRC023 460 465 1030 0.55 RMRC023 670 675 202 0.11
RMRC023 465 470 763 0.41 RMRC023 675 680 201 0.11
RMRC023 470 475 731 0.39 RMRC023 680 685 259 0.14
RMRC023 475 480 1800 0.96 RMRC023 685 690 193.5 0.10
RMRC023 480 485 441 0.23 RMRC023 690 695 195 0.10
RMRC023 485 490 89.3 0.05 RMRC023 695 700 150.5 0.08
RMRC023 490 495 156 0.08 RMRC023 700 705 173 0.09
RMRC023 495 500 168.5 0.09 RMRC023 705 710 389 0.21
RMRC023 500 505 189.5 0.10 RMRC023 710 715 311 0.17
RMRC023 505 510 129 0.07 RMRC023 715 720 241 0.13
RMRC023 510 515 118 0.06 RMRC023 720 725 169 0.09
RMRC023 515 520 97.3 0.05 RMRC023 725 730 178.5 0.10
RMRC023 520 525 236 0.13 RMRC023 730 735 197 0.10
RMRC023 525 530 69.3 0.04 RMRC023 735 740 225 0.12
RMRC023 530 535 88.2 0.05 RMRC023 740 745 807 0.43
RMRC023 535 540 77.5 0.04 RMRC023 745 750 620 0.33
RMRC023 540 545 226 0.12 RMRC023 750 755 524 0.28
RMRC023 545 550 127 0.07 RMRC023 755 760 565 0.30
RMRC023 550 555 138 0.07 RMRC023 760 765 603 0.32
RMRC023 555 560 197.5 0.11 RMRC023 765 770 634 0.34
RMRC023 560 565 151.5 0.08 RMRC023 770 775 790 0.42
RMRC023 565 570 146.5 0.08 RMRC023 775 780 492 0.26
RMRC023 570 575 346 0.18 RMRC023 780 785 1190 0.63
RMRC023 575 580 499 0.27 RMRC023 785 790 702 0.37
RMRC023 580 585 1980 1.05 RMRC023 790 795 459 0.24
RMRC023 585 590 5140 2.74 RMRC023 795 800 644 0.34
RMRC023 590 595 2400 1.28 RMRC023 800 805 711 0.38
RMRC023 595 600 1115 0.59 RMRC023 805 810 829 0.44
RMRC023 600 605 468 0.25 RMRC023 810 815 675 0.36
RMRC023 605 610 252 0.13 RMRC023 815 820 856 0.46
RMRC023 610 615 156 0.08 RMRC023 820 825 1655 0.88
RMRC023 615 620 147.5 0.08 RMRC023 825 830 714 0.38
RMRC023 620 625 358 0.19 RMRC023 830 835 1165 0.62
RMRC023 625 630 223 0.12 RMRC023 835 840 1095 0.58
15
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Sample
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC023 840 845 1730 0.92 RMRC022 150 155 1240 0.66
RMRC023 845 850 1575 0.84 RMRC022 155 160 1375 0.73
RMRC023 850 855 1855 0.99 RMRC022 160 165 2450 1.30
RMRC023 855 860 1360 0.72 RMRC022 165 170 2420 1.29
RMRC023 860 865 1385 0.74 RMRC022 170 175 1900 1.01
RMRC023 865 870 1505 0.80 RMRC022 175 180 1415 0.75
RMRC023 870 875 1175 0.63 RMRC022 180 185 2170 1.16
RMRC023 875 880 1220 0.65 RMRC022 185 190 1145 0.61
RMRC023 880 885 1070 0.57 RMRC022 190 195 1370 0.73
RMRC023 885 890 1545 0.82 RMRC022 195 200 995 0.53
RMRC023 890 895 1515 0.81 RMRC022 200 205 1155 0.61
RMRC023 895 900 1660 0.88 RMRC022 205 210 289 0.15
RMRC022 0 5 808 0.43 RMRC022 210 215 369 0.20
RMRC022 5 10 703 0.37 RMRC022 215 220 316 0.17
RMRC022 10 15 434 0.23 RMRC022 220 225 463 0.25
RMRC022 15 20 543 0.29 RMRC022 225 230 422 0.22
RMRC022 20 25 600 0.32 RMRC022 230 235 522 0.28
RMRC022 25 30 863 0.46 RMRC022 235 240 1720 0.92
RMRC022 30 35 900 0.48 RMRC022 240 245 1500 0.80
RMRC022 35 40 783 0.42 RMRC022 245 250 1595 0.85
RMRC022 40 45 739 0.39 RMRC022 250 255 1365 0.73
RMRC022 45 50 848 0.45 RMRC022 255 260 1225 0.65
RMRC022 50 55 838 0.45 RMRC022 260 265 770 0.41
RMRC022 55 60 1045 0.56 RMRC022 265 270 798 0.42
RMRC022 60 65 1480 0.79 RMRC022 270 275 513 0.27
RMRC022 65 70 1585 0.84 RMRC022 275 280 673 0.36
RMRC022 70 75 1185 0.63 RMRC022 280 285 365 0.19
RMRC022 75 80 709 0.38 RMRC022 285 290 308 0.16
RMRC022 80 85 833 0.44 RMRC022 290 295 302 0.16
RMRC022 85 90 685 0.36 RMRC022 295 300 266 0.14
RMRC022 90 95 537 0.29 RMRC022 300 305 166 0.09
RMRC022 95 100 376 0.20 RMRC022 305 310 308 0.16
RMRC022 100 105 700 0.37 RMRC022 310 315 456 0.24
RMRC022 105 110 874 0.47 RMRC022 315 320 623 0.33
RMRC022 110 115 900 0.48 RMRC022 320 325 1225 0.65
RMRC022 115 120 824 0.44 RMRC022 325 330 1485 0.79
RMRC022 120 125 1485 0.79 RMRC022 330 335 1755 0.93
RMRC022 125 130 1230 0.65 RMRC022 335 340 956 0.51
RMRC022 130 135 1035 0.55 RMRC022 340 345 1780 0.95
RMRC022 135 140 1055 0.56 RMRC022 345 350 1040 0.55
RMRC022 140 145 1140 0.61 RMRC022 350 355 507 0.27
RMRC022 145 150 1290 0.69 RMRC022 355 360 648 0.34
16
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Sample
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC022 360 365 692 0.37 RMRC022 570 575 1100 0.59
RMRC022 365 370 412 0.22 RMRC022 575 580 767 0.41
RMRC022 370 375 449 0.24 RMRC022 580 585 910 0.48
RMRC022 375 380 369 0.20 RMRC022 585 590 1075 0.57
RMRC022 380 385 629 0.33 RMRC022 590 595 1540 0.82
RMRC022 385 390 973 0.52 RMRC022 595 600 971 0.52
RMRC022 390 395 724 0.39 RMRC022 600 605 728 0.39
RMRC022 395 400 803 0.43 RMRC022 605 610 240 0.13
RMRC022 400 405 637 0.34 RMRC022 610 615 260 0.14
RMRC022 405 410 567 0.30 RMRC022 615 620 266 0.14
RMRC022 410 415 678 0.36 RMRC022 620 625 424 0.23
RMRC022 415 420 659 0.35 RMRC022 625 630 192 0.10
RMRC022 420 425 293 0.16 RMRC022 630 635 157 0.08
RMRC022 425 430 531 0.28 RMRC022 635 640 835 0.44
RMRC022 430 435 913 0.49 RMRC022 640 645 448