Substantial Mineral Resource Upgrade - Mineral Sands Project
Released
Released
Announcement PDF
9 November 2023
SUBSTANTIAL MINERAL RESOURCE UPGRADE AT
GOVERNOR BROOME MINERAL SANDS PROJECT, WA
Updated Mineral Resources to underpin Scoping Study due in Q1 2024
Key Highlights
•
Substantial 18% upgrade in Governor Broome Project
Measured and Indicated resource tonnes following
successful in-fill drill programs.
•
Combined 93.4Mt of Resources now in the highconfidence Measured (28.4Mt) and Indicated (65Mt)
Resource Categories
•
.
Latest Mineral
Assemblage results demonstrate high-value
mineralogy at the Jack Track Deposit, including:
•
•
Combined Jack Track-Jack Track East assemblage of
68% Primary Ilmenite, 14% Secondary Ilmenite, 4.5%
Rutile, 10% Zircon, and 0.8% Monazite, for a 97% VHM
content
Updated Mineral Resource Estimate and Mineral
Assemblages to be incorporated in Governor Broome Project
Scoping Study
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to announce a significant
upgrade of the Mineral Resources at its 100%-owned Governor Broome Heavy Mineral Sands Project
in the South West of Western Australia.
Astute Executive Chairman, Tony Leibowitz, said:
“The completion of this Resource upgrade marks another key step forward in our value-realisation
strategy for Governor Broome. Successful in-fill drilling programs completed earlier this year have
resulted in a substantial uplift of the higher confidence Indicated and Measured categories. This
means these Resources can be included in the upcoming Scoping Study and will ultimately be
available for conversion to Ore Reserves. With this key resource upgrade now finalized, the data will
be handed over to our consultants for inclusion in the Scoping Study – which remains on track for
completion in Q1 2024.”
Background
The 100%-owned Governor Broome Heavy Mineral Sands Project is located in the mineral sands-rich
coastal areas of the South West of WA. The Project is, by sealed road, located about 95km south of
Busselton, 105km south of Iluka’s processing plant at Capel, and 135km from Bunbury Port and from Picton,
where Doral Australia has a heavy mineral separation plant. The area is well serviced by electrical
infrastructure with a 132kV line located just 5km to the north and a three-phase power line passing
through the Project.
Resource Development
The Governor Broome Project has been systematically de-risked by Astute over a number of years.
Recent work includes the successful separation of marketable zircon, ilmenite, zircon and monazite
products from bulk sample testwork for the Jack Track (eastern) part of the Project 1. This updated Mineral
Resource Estimate (MRE) has resulted in a substantial 18% upgrade in higher-confidence Measured and
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Indicated resources from a previous 79Mt of Indicated Resources to 28.4Mt of Measured and 65Mt of
Indicated Resources. This update in Mineral Resources incorporates the results of Astute’s 502-hole aircore drilling programme that was carried out earlier this year, designed specifically to upgrade the
category of Mineral Resources.
The upgraded resources are being included in the current Scoping Study, which is scheduled for
completion in Q1 2024. The locations of the various Project deposits are shown on Figure 1, and a summary
of the Project’s Mineral Resources is shown in Table 1. The deposits within R70/58, for which these revised
resources are reported, are shown in Figure 2. Details of the various resources are given in Table 3.
Figure 1. Governor Broome Project tenements and Mineral Resources.
Figure 2. Resources within and adjacent to R70/58.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Tenement
R70/58 - Jack Track
R70/53 - Governor Broome
R70/22 - Fouracres
Project
Category
Tonnage
HM
Slimes
(Mt)
(%)
(%)
Measured
20.4
4.2
8.4
Indicated
21
3.5
7.9
Total
41
3.8
8.2
Measured
8.0
5.0
13
Indicated
44
5.0
13
Inferred
7
3.5
12
Total
59
4.8
12.5
Indicated
0.72
11.4
6.5
Inferred
0.2
4
9
Total
0.93
9.4
7.1
Measured
28.4
4.4
9.7
Indicated
65
4.5
11
Inferred
8.5
3.6
11
Total
102
4.4
11
Resources
Table 1. Governor Broome Project Resources – at 2% HM lower block-cut-off grade2
Note that the above figures have been appropriately rounded.
The Fouracres Resources estimated at a 3% Heavy Mineral (HM) lower block-cut-off grade
Governor Broome and Jack Track Resources estimated at a 2% HM lower block-cut-off grade
Geology and Mineralisation
The Governor Broome Project mineralisation is hosted in unconsolidated beach sands occurring on the
Scott River Coastal Plain. The geological character of the mineralisation is like that of other heavy mineral
deposits occurring along the Swan Coastal Plain, which have a long history of mining and processing.
The mineralisation is hosted in beach placer facies sediments of the Pleistocene aged Barlee Shore-line
on the southward facing Scott Coastal Plain.
The host unit to the Jack Track Deposit mineralisation, and that of the other deposits in the eastern section
of R70/58, is the Warren Sands, which do not contain significant clay.
A sub-surface Bunbury Basalt headland is present to the west of the Jack Track Deposit (see Figures 1
and 2). The characteristics of both the Warren Sands-hosted mineralisation and of the underlying
Beenup Beds, are markedly different on either side of the headland. To its east, both the Warren Sands
and the immediately unconformably underlying Beenup Beds of the Cretaceous Warnbro Group are very
fine grained, as are the heavy minerals.
To the west the grain sizes are larger, with most of the mineralisation within R70/58 also being within the
Warren Sands, but its lower portions are hosted within the Beenup Beds. The Beenup Beds sediments are
of two main facies in the area: clayey sands and organic clays. The clayey sands contain medium- to
coarse-grained, angular to sub-angular, unconsolidated quartz and minor feldspar grains. The clay
content, which is variable, tends to increase downward. Generally, it contains between 1% and 8% of
valuable HM. Common accessory minerals are garnet, pyrite, and fine coal fragments.
The mineralisation that has been reported as Mineral Resources is based upon a minimum heavy mineral
content of 2% over a thickness of 2m and a maximum Slimes content of 20% in any one intersection.
Exploration
The Jack Track Tenement, R70/58, has been explored with air-core drilling by Metal Sands in 2007, Astro
in 2012, by Iluka in 2015, and by Astro in 2022 and 2023. Those holes within R70/58, or marginal to it and
within the vicinity of the modelled mineralisation, are summarised in Table 1. The holes used in these
revised Jack Track Deposit resource estimations are listed in Appendix 2.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Company
Year
Air-core
Metres
Holes
Drilled
Metal Sands
2007
265
2,600
Astro Resources
2012
176
3,208
Iluka
2015
159
2,409
Astro Resources
2022
314
3,520
Astro Resources
2023
502
5,351
1,416
17,088
Total
Table 2. Significant exploration drill holes
2007, 2012, and 2015 Drilling and Sampling
The Metal Sands and the 2012 Astro holes were predominantly drilled on 45 o oriented lines that were up
to 480m apart, with the holes mostly 80m apart along the lines. All drilling was by NQ air-core. Samples
were taken at one-metre intervals, after which they were selected for HM separation on the basis of the
presence of visual HM.
The Iluka holes were drilled on five near north-south lines, with holes mostly 50m apart. Along strike,
however, the lines were spaced between 800m and 1700m apart. All drilling was by NQ air-core.
2022 and 2023 Drilling and Sampling
The 2022 and 2023 drilling was designed to in-fill the earlier broad-spaced lines with holes mostly spaced
80m apart on lines spaced up to 160m apart and holes. As most of the 2022 drilling and some of the
2023 drilling was within blue-gum plantations, the orientation of those lines was dependent upon the
orientations of the tree rows. The orientation of remainder of the 2023 drilling lines, which were within
farmland was dependent upon access.
Sample Analytical Techniques
The Metal Sands analyses (Samples GB0991 to GB1310 in Appendix 2) were analysed by Western Geolabs
Pty Ltd using its standard HM analytical procedure: Split ~100g sub-sample; remove -45µ slimes and
+1mm oversize; obtain HM concentrate from sub-sample using Tetrabromoethane (“TBE”) separation
(SG = 2.97g/cc); report HM%, slimes%, and oversize%.
The Iluka samples (Samples W00161 to W00303 in Appendix 2) were analysed at its Hamilton laboratory,
where they were separated using Iluka’s standard heavy media technique (Lithium Heteropolytungstate;
SG = 2.85g/cc). Clay and oversize fractions were screened at sizes of -53µ and plus 710µ respectively.
The Company’s 2022 and 2023 samples (Samples GB2295 to GB3110 in Appendix 2) were analysed by
Western Geolabs Pty Ltd using its revised standard procedure, except that the clay and oversize fractions
were screened at sizes of -53µ and plus 710µ respectively so that the results would be comparable to
those from the Iluka holes: Remove and weigh >3.3mm fraction; split 100g sub-sample; remove -53µ
slimes and plus 710µ oversize; obtain HM concentrate from remaining sub-sample TBE separation; report
HM%, slimes%, and total oversize%.
Although the three methods differ, the differences have had no significant effect on the HM and the slimes
contents. The Oversize percentages, however, are not comparable between all programmes.
Jack Track Deposit Mineral Assemblages – Iluka and 2022
Iluka carried out mineralogical testwork on 12 composite samples of HM sinks from its 2015 drilling to
determine the mineral assemblage and indicative mineral quality. It reported that the assemblage of the
Jack Track Deposit is ilmenite dominated and high in zircon; containing 75% ilmenite, 10.8% zircon, 6.8%
leucoxene, and 2.4% rutile; for a 94% VHM content and 59.4% TiO 2.
The Company also carried out mineralogical testwork on composite samples of HM sinks from its 2022
drilling of the Jack Track Deposit2. It reported that the deposit contains approximately 66.5% primary
ilmenite (58% TiO2), 14.5% secondary ilmenite (including approximately 8.5% leucoxene), 4.5% rutile, 10.5%
zircon, and 0.8% monazite – for an overall 96.5% valuable heavy mineral (“VHM”) content. The titanium
minerals have an average composition of 63% TiO2.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Jack Track Deposit Mineral Assemblages – 2023
Composite samples of heavy mineral concentrate (“HMC”) from Astro’s 2023 drilling of the JT E (Jack
Track East), JT E U (Jack Track East Upper), JT SW E (Jack Track Southwest East), JT SW S (Jack track
Southwest South), JT NW (Jack Track Northwest), and JT W (Jack Track West) Deposits were processed
by Allied Mineral Laboratories, Perth, to assess their heavy mineral assemblages.
Five JT E composites averaged 69.2% Primary Ilmenite (57% TiO2), 14.0% Secondary Ilmenite (63% TiO2),
9.2% zircon, 4.5% Rutile (95% TiO2), and 0.7% Monazite, for a 97.5% VHM content.
The JT EU composite contained 70.9% Primary Ilmenite (57% TiO2), 12.3% Secondary ilmenite (63% TiO2),
10.2% zircon, 4.6% Rutile (95% TiO2), and 0.8% Monazite, for a 98.7% VHM content.
The JT SW E composite contained 71.2% Primary Ilmenite (57% TiO2), 10.8% Secondary ilmenite (63% TiO2),
9.3% zircon, 4.0% Rutile (95% TiO2), and 0.7% Monazite, for a 96.1% VHM content.
The JT SW S composite contained 68.7% Primary Ilmenite (57% TiO2), 11.8% Secondary ilmenite (63% TiO2),
9.7% zircon, 3.2% Rutile (95% TiO2), and 0.6% Monazite, for a 93.9% VHM content.
Two JT NW composites averaged 72.6% Primary Ilmenite (54% TiO2), 6.3% Secondary ilmenite (60% TiO2),
5.6% zircon, 2.4% Rutile (95% TiO2), 0.3% Monazite, and 8.7% Garnet, for a 95.9% VHM content.
The JT W composite contained 67.0% Primary Ilmenite (54% TiO2), 8.3% Secondary Ilmenite (60% TiO2),
8.5% zircon, 3.4% Rutile (95% TiO2), 0.4% Monazite, and 12.4% Garnet, for a 100% VHM content.
The combined results for the Jack Track and Jack Track East deposits give an average assemblage of
68% Primary Ilmenite, 14% Secondary Ilmenite, 4.5% Rutile, 10% Zircon, and 0.8% Monazite, for a 97% VHM
content.
Resource Estimates
Estimate Methodology
The estimates employed Inverse Distance Squared (“ID2”) modelling to produce ore block models
(“OBMs”) of the HM mineralisation.
HM and slimes grades were used to form wireframed hard upper and lower boundaries to the
mineralisation. The grade boundaries were based on a minimum 2% HM content; and a maximum
slimes limit of 35% for individual samples and 20% for intersections.
No upper cut was used for the HM grades, as virtually no outlying high values were present. The 2% lower
cut-off was selected as this grade allowed grade continuity to be established between drill-holes.
Grade interpolation was within 25m East-West x 25m North-South x 0.5m vertical blocks.
The wireframed bodies of mineralisation were restricted to areas that contained drill-holes with
significant ratios of contained mineralisation to depth of overburden. The ratio used was “sum of 1m HM
grades within intersection to depth of base of mineralisation” (e.g., 4m @ 4% HM from 6m to 10m would
give a ratio of 16:10 or 1.6:1).
The wireframed areas contained drill-holes returning ratios of 1 or greater. A minimum intersection length
of 2m was used.
Ore Block Models
The resulting Ore Block Models (OBMs) are shown in plan-view in Figure 2 and in sectional view in Figures
3 to 13.
Apparent gaps along the northern and southern margins of the Jack Track resource, between the Jack
Track and Jack Track East resources, in the north of the JT SW E resource, and in the southeast of the SW
N resource are areas of wetland containing native vegetation. Although mineralisation is present in
these areas, the Competent Person considers it unlikely that regulatory permission would be obtained to
mine these areas. Consequently, they are not included in the Mineral Resources.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 3. Jack Track Deposit OBM
Figure 4. Jack Track Deposit OBM; 363000E Cross-section; V.E. 10:1
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 5. Jack Track East Deposit OBM and indicated cross-section location
Figure 6. Jack Track East Deposit OBM; 364400E Cross-section; V.E. 10:1
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 7. JT SW N Deposit OBM and indicated cross-section location
Figure 8 JT SW N Deposit OBM Cross-section; V.E. 10:1
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 9. JT SW E Deposit OBM and indicated cross-section location
Figure 10 JT SW E Deposit OBM Cross-section; V.E. 10:1
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 10. JT SW S Deposit OBM and indicated cross-section location
Figure 10 JT SW S Deposit OBM Cross-section; V.E. 10:1
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 11. JT NW and JT W deposits OBMs and indicated cross-section locations
Figure 12. JT NW Deposit OBM Cross-section; V.E. 10:1
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 13. JT W Deposit OBM Cross-section; V.E. 10:1
Specific Gravities
The Specific Gravity (SG) was calculated for each ore block based on its interpolated HM content,
according to the standard formula SG = 1.686 + (0.0108 x HM%).
Mineral Resources
The newly estimated mineral resources for the various deposits within and adjacent to R70/58 Jack Track
Deposit are set out in Table 3.
Deposit
Category
Tonnage
HM
Slimes
(Mt)
(%)
(%)
Jack Track
Measured
20.4
4.2
8.4
Jack Track East
Indicated
11
3.6
7.4
Total
31.5
4.0
8.0
Jack Track Southwest North
Indicated
2.6
2.8
9.5
Jack Track Southwest East
Indicated
1.4
3.4
8.3
Jack Track Southwest South
Indicated
0.9
2.5
8.6
Jack Track Northwest
Indicated
2.3
4.2
9.5
Jack Track West
Indicated
2.5
3.4
6.7
Total
9.6
3.3
8.5
Southeast
Inferred
1.3
3.5
8
Totals
Measured
20.4
4.2
8.4
Indicated
21
3.5
7.9
Inferred
1.3
3.5
8
Total
42.5
3.8
8.1
Resources
Note that the above figures have been appropriately rounded.
Table 3. R70/58 Resources – at 2% HM lower block-cut-off grade
Resource Classification
The estimated resource within the infill-drilled portion of the Jack Track Deposit to the west of 363800E
is classified as Measured, as the quantity, grade, density, shape, and mineral assemblage are estimated
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
with sufficient confidence to support detailed mine planning and final evaluation of its economic viability.
In addition, Bulk Testwork carried out indicated that its mineralisation is amenable to processing using
conventional wet and dry plant techniques1.
The other estimated Jack Track resources are classified as Indicated, as the drilling has shown both
geological and mineralisation continuity throughout the area and the drilling density has been such to
enable the verification of grade continuity.
The estimated resource within the Southeast Deposit is classified as Inferred, as, although the drilling has
shown both geological and mineralisation continuity throughout the area, the drilling density has not
been such to enable the verification of grade continuity.
The drill-hole locations are shown on Figure 2. Appendix 2 lists the air-core drill-holes drilled into the
deposits for which updated resource estimates are reported. HM intercepts are provided for each hole.
Cut-off Grade
CRM selected the lower block-cut-off grade of 2% as:
1.
This grade has been used for the estimation of the Governor Broome Resources to the west within
R70/53 and consistency will be necessary for planned study of the economics of the entire
Governor Broome Project; and
2.
TZ Minerals International Pty Ltd’s (“TZMI’s”) study in 2019 demonstrated the possibility of economic
viability of mining 22.9Mt from the North Deposit and 7.9Mt from the South Deposit in R70/53. The
study was based upon the resources that had been estimated using a 2% lower block-cut-off
grade3. As the mineral assemblage of the Jack Track Deposit is more valuable than that of the
North and South Deposits, it is reasonable to conclude that the 2% cut-off grade is also potentially
economic within R70/58; and
3. A 2% cut-off grade allows grade continuity to be established between drill-holes.
Previous Resource Estimates
The Jack Track Deposit was estimated by Iluka and reported by the Company in 2016 as an Inferred
Mineral Resource of 18.8 Mt @ 4.7% HM containing 890 thousand tonnes of HM at a 3.0% HM lower cutoff grade4.
The Company reported a revised Inferred Resource for the deposit of 28Mt @ 4.1% HM containing 1.15Mt
of HM5. The larger tonnage was the result of the use of a lower block-cut-off grade of 2% HM and the
extension of the resource about 800m to the west by the inclusion of two lines of holes drilled by Metal
Sands in 2007.
Following infill drilling of the western portion of the Jack Track Deposit in 2022, Astro reported revised
resources for mineralisation within R70/58 6. The resources comprised an Indicated Resource of 22Mt @
4.5% HM for the western portion of the Jack Track Deposit, an Inferred Resource of 12Mt @ 3.5% HM for the
eastern portion of the Jack Track Deposit, and Inferred Resources for the Jack Track, Southwest,
Northwest, and West Deposits of 22Mt @ 3.8% HM, 3.8Mt @ 4.5% HM, and 5Mt @ 3.9% HM respectively.
Overburden
The Jack Track Measured Resource’s overburden has an average depth of 5.1m. The mineralisation has
an average thickness of 4.0m, for an overburden to mineralisation ratio of 1.25 : 1. The Jack Track
Indicated Resource’s overburden has an average depth to the mineralisation of 6.7m. Its mineralisation
has an average thickness is 3.4m for an overburden to mineralisation ratio of 1.95 : 1.
The JT SW N Deposit overburden has an average depth of 6.1m. The mineralisation has an average
thickness of 4.7m, for an overburden to mineralisation ratio of 1.3 : 1.
The JT SW E Deposit overburden has an average depth of 10.4m. The mineralisation has an average
thickness of 5.3m, for an overburden to mineralisation ratio of 2.0 : 1.
The JT SW S Deposit overburden has an average depth of 6.4m. The mineralisation has an average
thickness of 6.6m, for an overburden to mineralisation ratio of 1.0 : 1.
The JT NW Deposit overburden has an average depth of 4.4m. The mineralisation has an average
thickness of 2.2m, for an overburden to mineralisation ratio of 2.0 : 1.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
The JT W Deposit overburden has an average depth of 4.3m. The mineralisation has an average
thickness of 3.6m, for an overburden to mineralisation ratio of 1.2 : 1.
The Southeast Deposit overburden has an average depth of 7.8m. The mineralisation has an average
thickness of 4.6m, for an overburden to mineralisation ratio of 1.7 : 1.
Mining Method
It has been assumed that, for potential mining of the deposits, topsoil and overburden would be removed
by scrapers and the mineralisation would be mined by bulldozer feeding an in-pit slurry unit. The slurry
would be pumped to a wet concentrator to produce an HM concentrate. The waste would be returned
to the mine void and covered with stored topsoil.
The deposits are within farmland and blue-gum plantations and suitable agreements for compensation
would need to be addressed with the owners and occupiers before mining was carried out.
Proposed Work Program
Governor Broome Project Scoping Study
TZ Minerals International (TZMI) has been engaged by Astute to carry out a Scoping Study on the Project 7.
The study, scheduled for completion in Q1 2024, will include the review and assessment of mining and
processing options, and a mineral products market review. It will be guided by the results of recent Project
bulk testwork studies and HMC mineralogical studies. Results from the review will be used to generate
the capital cost and operating cost estimates, and an economic evaluation.
Extensional Exploration Drilling
Exploratory drilling is recommended for two areas within E70/5872 that are along strike to the south-east
of the Jack Track Deposits, with a view to eventual addition of further tonnes to mineral resource
inventory. The drilling has regulatory approval.
Exploration of the first area would consist of the follow-up of previous air-core drilling conducted in 2012
along Fouracres Road. This drilling intersected heavy mineral mineralisation within eight holes that were
located down-dip of a radiometric thorium anomaly. Unfortunately, the drill samples were not analysed.
The second area is located 4km further south-east within farmland.
1 ASX: ASE 23 August 2023 ‘Jack Track Bulk Testwork Produces Marketable Heavy Mineral Products’
2 ASX: ARO 21 November 2022 ‘High Value Mineral Content for Jack Track Deposit’
3 ASX: ARO 16 October 2019 ‘Review of the Governor Broome Project Preliminary Study’
4 ASX: ARO 26 April 2016 ‘Jack Track Maiden Inferred Heavy Mineral Resource’
5 ASX: ARO 8 November 2021 ‘Re-estimation of Jack Track Tenement Resource’
6 ASX: ARO 19 September 2022 ‘Substantial increase in Mineral Resource for Governor Broome’
7 ASX: ASE 14 September 2023 ‘Commencement of Scoping Study at Governor Broome’
Authorisation
This announcement has been authorised for release by the Board of Astute.
More Information
Matt Healy
General Manager – Exploration
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Competent Persons
The information in this report as it relates to Mineral Resources and Exploration Results for the Governor
Broome Project is based on information compiled by John Doepel, a Director of Continental Resource
Management Pty Ltd (CRM), who is a member of the Australasian Institute of Mining and Metallurgy. Mr
Doepel has sufficient experience in mineral resource estimation relevant to the style of mineralisation and
type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Doepel consents to the inclusion in this announcement of the information in the form and context in
which it appears.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 1 – Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialisedindustry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheldXRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Air-core drilling was used to obtain 1m samples
from target horizons;
Approximately 1 to 1.5 kg sub-samples were split
by scoop from 1m samples
Include reference to measures taken to
ensuresample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, suchas where there is
coarse gold that has inherentsampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Drilling
techniques
Drill type (eg core, reverse circulation, openholehammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
isoriented and if so, by what method, etc).
Drill sample
recovery
Method of recording and assessing core
andchip sample recoveries and results
assessed.
Measures taken to maximise sample
recoveryand ensure representative nature
of the samples.
Vertical NQ Air-core
Good recovery and retention of all size
fractions;
Holes cleaned at completion of each twometre rod;
Cyclone cleaned after each hole
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gainof fine/coarse material.
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to alevel of detail to support
appropriate MineralResource estimation,
mining studies and metallurgical studies.
All intervals geologically logged by Competent
Person during drilling
Whether logging is qualitative or
quantitative innature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevantintersections logged.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotarysplit, etc and whether sampled wet or
dry.
Sample preparation via drying and manual
pulverisation before removal of +3.3mm material;
100g sub- samples riffle split from remaining
sample
For all sample types, the nature, quality
and appropriateness of the sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the sampling
isrepresentative of the in situ material
collected,including for instance results for
field duplicate/second-half sampling.
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to
thegrain size of the material being sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whet
Share your feedback
Discover