Investor Presentation
Released
Released
Announcement PDF
ASX: VMS
Building America’s
Lithium Future
Red Mountain Project
Investor Presentation, July 2026
2
Investment Highlights
and Vision
o Located in the world’s premier mining jurisdiction, Nevada
o One of the highest-grade sedimentary lithium projects in the USA
o Venari management focused on value-creation, including Chairman
Tony Leibowitz, founding director and early financier of PLS Group (ASX:
PLS)
o Company intends to rationalise its portfolio of projects and certain
transactions are imminent
o Project to be advanced rapidly with infill drilling program permitted
o Risk-Reward proposition is easy to understand
Vision : Red Mountain emerges as the
premier investment option of US lithium projects,
as a future supplier of critical minerals Lithium and
Magnesium, and the sole domestic US source of
defence-strategic material Strontium
3
Company Overview
Key Financials
Share Price (@ 14.07.2026) $0.084
Shares on Issue 107,631,637
Options (Listed) 29,184,7274
Loan Funded Shares 522,0001
Unlisted Options (exp. 2 Oct 2028) 3,000,000
Performance Rights 3,812,000
Market Cap (@ 14.07.2026) $9.04 m
Cash (@ 31.03.2026) $1.68 m2
Enterprise Value $7.36 m
Debt (@ 14.07.2026) Nil
Top 20 Shareholders 64.82%
Major Shareholders
Holdmark Property Group 17.59%
Tony Leibowitz shareholdings 10.99%
Mining Investments Ltd 6.70%
Board and Management
Mr Leibowitz is a proven track record
in the lithium sector. He was
Chairman and a founder of Pilbara
Minerals Limited. Mr. Leibowitz joined
the Venari board in 2022. He has
participated in every equity raising in
additionto buying shares on market.
Tony Leibowitz
Chairman
Matt Healy
Executive Director & CEO
Vince Fayad
Non-Executive Director
Share Price3
Mr Healy is a highly experienced
geologist and Australian mining
executive. Prior to joining Venari
Minerals, Mr Healy held the position
of Chief Executive Officer for
Greenvale Mining Limited (ASX: GRV)
and was also previously Exploration
Manager at Round Oak Minerals.
Mr Fayad has over 40 years’
experience in corporate finance,
international M&A, accounting and
other advisory related services in
Sydney-based mid-tier accounting
firms. He is the principal Vince Fayad
& Associates, providing accounting
and advisory services.
Notes:
1. If exercised, the Loan Funded incentive Shares would result in approximate cash
received by Venari of $0.31M, at an average of $0.60 per share.
2. The cash-at-bank balance has been sourced from the Company’s 31 March 2026
quarterly Appendix 5B.
3. The share price graph has been reconstructed to reflect the impact of the Company’s
1-for-10 share consolidation, which took effect on 28 November 2025.
4. Listed options have an exercise price of 50 cents, expiry date of 21 August 2026 and
trade under ASX ticker code ‘VMSO’.
-
0.05
0.10
0.15
0.20
0.25
0.30
0M
0M
0M
1M
1M
1M
1M
1M
2M
2M
07/2025 09/2025 11/2025 01/2026 03/2026 05/2026
Share
Price
($AU)
Volume
4
Red Mountain
Project Overview
Strategically located multi-commodity deposit
o High-grade lithium deposit located in Nye County, Nevada, USA
o 99.5% Battery-grade lithium carbonate direct product
o Critical and Strategic byproduct potential in Magnesium and Strontium
Mining-friendly Jurisdiction
o Nevada the top ranked mining jurisdiction in the world due to streamlined
permitting, competitive taxation settings and excellent infrastructure
o US Federal policies directed an onshoring critical mineral supply chains,
including direct equity investments, offtake, loans program, grant funding
Exceptional Infrastructure Position
o Project adjacent to Route 6 only 5 hours drive from the Tesla Gigafactory
o High-voltage 525kV ‘One Nevada’ transmission line 12mi to the east
Value Creation – Next Steps
o Strontium and magnesium added to MRE as potential by-products
o Infill drilling and subsequent MRE upgrade from Inferred to Indicated
o Metallurgical testwork to produce marketable by-products
o Scoping Study to demonstrate strong economics
o Engagement with the DoD, DoE and potential strategic partners
5
Non-Core Upside
Non-core assets offer Company simplification upside
o Governor Broome WA located Scoping stage Heavy Mineral Sands Project
Pre-tax NPV10 of A$139M, IRR of 54%, $91m Capex with <2yr payback
o Needles Gold Project – Underexplored large footprint epithermal gold-
silver project with bonanza-grade silver and gold in historical mining
Venari has announced its intent to sell the mineral sands
project and other portfolio rationalise options being
considered
The Company confirms that all material assumptions underpinning the production
targets and forecast financial information derived from the Scoping Study results in the
4 April 2024 release continue to apply and have not materially changed.
See Appendix 4 for complete Mineral Resource Estimates table
6
Next Steps
Red Mountain North
47.9Mt @ 2,193ppm Li
for 560kt contained LCE
(orange and pink, 1,300ppm cutoff)
Red Mountain Central
66Mt @ 1,427ppm Li for
500kt contained LCE
(orange only, 1,300ppm cutoff)
First pass economic assessment to be undertaken on the Red
Mountain Lithium Project, incorporating battery-grade lithium and
marketable-quality strontium and magnesium by-products
Steps Required
o Infill and extensional drilling with assays 11,000ft / 3,360m
o Mineral Resource Estimate upgrade from Inferred to Indicated category
o Metallurgical work to assess byproduct potential and optimise processing
flowsheet
o Initial Scoping Study
o Engage with US DoD/DoE for grant funding and financing opportunities
o Explore investment opportunities within US and ally battery/chemical
supply chains participants and lithium chemical/cathode manufacturers
Infill drilling
Meas+Ind
(black box)
Extensional drilling
from 200 – 300m depth
(red box)
7
Value Creation Catalysts
Program Q3 Q4 Q1 2027 Q2
Diamond drilling
MRE Update – Sr and
Mg
Assay Results
MRE Upgrade
(Indicated)
Met Test-work
EPO Approved
Scoping Study
DoD/DoE Engagement
8
Disclaimer & Forward-Looking Statement
Important Notice & Disclaimer
The purpose of this presentation is to provide background information to assist readers in obtaining a general understanding of Venari Minerals NL (‘Venari’ or ‘the Company’) and its objectives. Readers should make their own independent assessment of the
information and take their own independent professional advice in relation to the information and any proposed action to be taken in on the basis of the information. To the maximum extent permitted by law, Venari and its professional advisors and their related bodies
corporate, affiliates and each of their respective directors, officers, partners, employees, advisers and agents and any other person involved in the preparation of this presentation disclaim all liability and responsibility (including without limitation any liability arising from
fault or negligence) for any direct or indirect loss or damage which may arise or be suffered through use of or reliance on anything contained in, or omitted from, this presentation. Neither Venari nor its advisors have any responsibility or obligation to inform the reader
of any matter arising or coming to their notice after the date of this presentation, which may affect any matter referred to in the presentation. The distribution of this Presentation (including an electronic copy) outside Australia may be restricted by law. If you come into
possession of this Presentation, you should observe such restrictions and seek your own advice on such restrictions. Any non-compliance with these restrictions may contravene applicable securities.
Not An Offer
This presentation is not and should not be considered as an offer or invitation to apply for or purchase securities of the Company or as a recommendation or inducement to make an offer or invitation in respect of the Company’s securities. This presentation is not a
disclosure document under Australian law or under any other law. It does not purport to contain all the information any reader or prospective investor may require to make an investment decision and it does not contain all of the information required by Australian law
or any other law to be disclosed in a prospectus. In particular, this presentation does not constitute an offer to sell, or the solicitation of an offer to buy, any securities in the United States. This Presentation may not be distributed or released in the United States. Securities
in the Company have not been, nor will be, registered under the U.S. Securities Act of 1933, or the securities laws of any state or other jurisdiction in the United States. Accordingly, the securities in the Company may not be offered or sold, directly or indirectly to, persons
in the United States or persons who are acting for the account or benefit of a person in the United States unless they have been registered under the U.S. Securities Act or in a transaction exempt from, or not subject to, the registration requirements of the U.S. Securities
Act and any other applicable U.S. laws.
Not Investment Advice
The presentation is not investment or financial product advice (nor tax, accounting or legal advice) and is not intended to be used for the basis of making an investment decision.
Forward-looking Statements
Certain statements contained within the presentation are forward looking statements. Such forward looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Venari, are inherently subject to significant
technical, business, economic, competitive, political and social uncertainties and contingencies, involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results to materially
differ from estimated or anticipated events or results reflected in such forward looking statements, and may include among other things, statements regarding estimates and assumptions in respect of prices, costs, results and capital expenditure, and are or may be based
on assumptions and estimates related to future technical, economic, market, political, social and other conditions. In certain cases, forward-looking statements can be identified by the use of words such as, “affords”, “anticipates”, “believe”, “considered”, “continue”,
“could”, “establishes”, “estimate”, “expected”, “future”, “interpreted”, “likely”, “looking”, “may”, “open”, “plan” or “planned”, “potential”, “robust”, “targets”, “will” or variations of such words and phrases or statements that certain actions, events or results may,
could, would, might or will be taken, occur or be achieved or the negative of these terms or comparable terminology. Venari disclaims any intent or obligation to publicly update any forward-looking statements, whether as a result of new information, future events or
results or otherwise. An investment in securities in the Company is subject to investment and other known and unknown risks, some of which are beyond the control of the Company. The Company does not guarantee any particular rate of return or the performance of
its securities, nor does it guarantee any particular tax treatment. You should carefully consider the risks outlined in this Presentation before making an investment decision.
No Liability
No representation or warranty, express or implied, is given as to the fairness, accuracy, completeness, reliability or adequacy of statements, estimates, opinions or other information, or the reasonableness of any assumption or statement in this presentation (any of which
may change without notice), or the likelihood of achievement or reasonableness of forecasts or prospective statements in this presentation. Forecasts and prospective statements are by their nature subject to significant uncertainties and contingencies. Forecasts and
prospective statements in this presentation are based on current expectations about future events and are subject to risks, uncertainties and assumptions that could cause actual results to differ materially from the expectations described.
This presentation has been approved for release by Venari’s Board of Directors.
9
JORC CP Statements
Competent Persons Statements
The information in this presentation that relates to Needles Gold and Red Mountain Lithium (Section 1: Sampling Techniques
and Data) is based on information compiled by Mr Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a full-time employee of Venari Minerals NL
and is eligible to participate in a share-based incentive schemes of the Company. Mr Healy has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) and Mineral Resource Estimates is
based on information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates – Consultant
Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person under the 2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
The information in this presentation as it relates to Mineral Resources and Exploration Results for the Governor Broome Project
is based on information compiled by John Doepel, Director of Continental Resource Management Pty Ltd (CRM), who is a
member of the Australasian Institute of Mining and Metallurgy. Mr Doepel has sufficient experience in mineral resource
estimation, which is relevant to the style of mineralisation and type of deposit under consideration and is qualified as a
Competent Person as defined in the 2012 edition of the ‘ Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Doepel consents to the inclusion in the report of the information in the form and context in
which it appears.
Mineral Resource Estimates
Where the Company references previously disclosed Mineral Resource Estimates it confirms that the relevant JORC Table 1
disclosures are included with the original referenced ASX Announcements and that it is not aware of any new information or
data that materially affects the information included in those ASX Announcements and in the case of Mineral Resources, that all
material assumptions and technical parameters underpinning the estimates in the Announcements continue to apply and have
not materially changed.
Footnotes & Previous
Announcements
The information contained within this presentation that relates to exploration results has been extracted from the following
ASX announcements (ASX: VMS) previously (ASX: ASE):
• ASX: VMS, 28 April 2026, Red Mountain Project produces Battery-Grade Lithium Product
• ASX: VMS, 18 February 2026, Updated Exploration Target for Red Mountain Lithium Project
• ASX: VMS, 2 February 2026, Maiden Mineral Resource Estimate for the Red Mountain Lithium Project
• ASX: VMS, 12 January 2026, Final assays received and Maiden MRE advances - Red Mountain
• ASX: VMS, 16 December 2025, Highest-Grade lithium intersection to date at Red Mountain
• ASX: VMS, 11 December 2025, High-Grade lithium confirmed at Red Mountain North
• ASX: VMS, 24 November 2025, More High-Grade lithium results from Red Mountain drilling
• ASX: VMS, 17 November 2025, Initial Red Mountain Assays confirm High-grade Lithium
• ASX: ASE, 18 June 2024, Significant lithium discovery at the Red Mountain Project
• ASX: ASE, 22 July 2024, Further high-grade lithium intersections at Red Mountain
• ASX: ASE, 7 August 2024, Receipt of final assays for the Red Mountain Lithium Project
• ASX: ASE, 16 December 2024, Signficant new zones of lithium mineralisation discovered at Red Mountain Project, USA
• ASX: ASE, 20 January 2025, Lithium discovery extended with exceptional 86.9-metre intercept at Red Mountain
• ASX: ASE, 19 May 2025, Exceptional lithium intercept extends Red Mountain discovery further to the North
• ASX: ASE, 29 May 2025, Two lithium zones confirmed in latest Red Mountain drill hole
• ASX: ASE, 25 June 2025, Widest lithium mineralisation intersected at Red Mountain
• ASX: ASE, 25 July 2025, Exceptional Drill-hole Intersects combined 170m of Lithium Mineralisation at Red Mountain
• ASX: ASE, 22 April 2025, Beneficiation test-work successfully upgrades mineralisation at Red Mountain
• ASX: ASE, 10 June 2025, Beneficiation Delivers 4,480ppm Lithium Clay Concentrate at Red Mountain
• ASX: ASE, 9 December 2024, Positive initial metallurgical results from Red Mountain
• ASX: VMS, 15 October 2025, Metallurgical test-work delivers 132% upgrade to lithium mineralisation at Red Mountain
• ASX: VMS, 27 January 2026, Further positive metallurgical test-work results from Red Mountain Lithium Project
• ASX: ASE, 20 November 2023, Large lithium soil anomalies discovered at Red Mountain
• ASX: ASE, 27 November 2023 Outstanding Rock-Chip Assays at Red Mountain Project
• ASX: ASE, 8 July 2024, High-grade rock chip assays extend prospective lithium horizon at Red Mountain Project, USA
• ASX: ASE, 4 February 2025, New Zone of lithium-bearing rocks identified at Red Mountain
• ASX: ASE, 3 September 2025, Outstanding lithium anomalism in surface sampling at Red Mountain Extension
Lithium Carbonate Equivalent wt%(LCE) calculated by the formula LCE = Li (ppm) x 5.323 /10,000
venariminerals.com
Contact: Matthew Healy
Executive Director & CEO
+61 (0)431 683 952
matt@venariminerals.com
Nicholas Read
Media & Investor Relations
+61 (0)419 929 046
nicholas@readcorporate.com.au
11
Lithium: a
Resurgent Market
Robust forecast global lithium demand
o Stationery storage battery demand to grow 49% to 925GWh in 20263
o Global EV demand to grow 33% to 1,400GWh in 20263
Strong spot and futures markets pricing for lithium chemicals
o Lithium prices have surged over 100% in the past nine months
o Battery-Grade Lithium Carbonate (LC) Spot US $22,657/t1
o GFEX LC September Futures $22,394/t2
Investment banks forecast continued lithium resurgence
o 10yrs of lithium supply deficits starting in 20264
o LC 99.5% CIF China forecast of US $33,000/t in Q4 20264
o LC Battery-Grade CIF China forecast of over US$ 41,000/t in 20275
Source: Shanghai Metals Market, Price name SMM-Li-LC-001, 14 July 2026
Shanghai Metal Market Battery Grade Lithium Carbonate Price
1. ShanghaiMetals Market SMM-Li-LC-001 14 July2026
2. GFEX Main Continuous Contract Price LC2609 14 July 2026
3. Red Cloud Securities Lithium Sector Update 31 March 2026
4. Canaccord Genuity Global Equity Research Lithium 22 April 2026
5. UBS Global Research lithium 27 April 2026
US $22,657
12
Jurisdictional
Advantage
Trump Administration has prioritised the securing of domestic
critical mineral supply chains
o Fast-tracked permitting
o DoE funding for critical minerals, etc $935m
o DoW investments in critical mineral supply, e.g. MP Materials
o DFC negotiating a $5b fund to secure critical minerals supply
Nevada is pro-mining and the World’s #1 mining jurisdiction
o Transparent permitting, skilled workforce and attractive taxation
settings
o ‘Lithium Capital’ of North America with Thacker Pass (NYSE:
LAC)under construction and Rhyolite Ridge (ASX: INR) permitted
US Domestic battery production capacity to exceed 864GWh by
2030, equating to 432kt - >600kt of annual lithium (LCE) demand
Demand will not be met by current (~5ktpa) and forecast US
lithium production
Source: Nevada Bureau of Mines and Geology Special Publication 40 - Lithium in Nevada, 2024
Total battery manufacturing capacity commissioned, under construction, and announced since the
passage of the 2022 Inflation Reduction Act
13
Sedimentary Lithium: an
introduction
What are Sedimentary Lithium Deposits?
• Lithium is hosted in sedimentary rocks, such as clay, silt and sandstone.
What makes these different from hard-rock deposits?
• Typical large-scale, lower grade deposits with soft rocks.
• Lithium Carbonate1,2/Hydroxide3 can be produced directly at the mine.
Are any Sedimentary Lithium mines in operation?
• Thacker Pass is under construction and there are several
others at feasibility stage.
What does it cost to produce a tonne of product?
• OPEX ranges from US $5,216/t 2 to $8,039/t 1 of lithium carbonate.
How much lithium product will these mines produce?
• Thacker Pass is the largest project, set to produce 2.3Mt of LC in the
first 20yr of operations1. Rhyolite Ridge2 and Tonopah flats3 will produce
384kt and 562kt of LC and LH, respectively, over the same timeframe.
Notes:
Projects source: Lithium in Nevada,Nevada Bureau of Mines and Geology,
Special Publication 40, 2024
1 – NYSE: LAC, 31 December 2024, Updated NI 43-101 Technical Report
for the Thacker Pass Project
2 – ASX: INR, 29 Oct 2025, Leach optimisation enhancesproject economics
3 – NASDAQ: ABAT, 04 September2025, Tonopah Flats Lithium Project
S-K 1300 Technical Report and Preliminary Feasibility Study
14
Mineral Resource
Estimates
Red Mountain North
47.9Mt @ 2,193ppm Li
for 560kt contained LCE
(orange and pink, 1,300ppm cutoff)
Red Mountain Central
66Mt @ 1,427ppm Li for
500kt contained LCE
(orange only, 1,300ppm cutoff)
Notes:
1 – ASX: INR, 25 October 2025, Further Leach OptimisationEnhances Project Economics
Maiden Inferred Mineral Resource Estimate (Feb 2026)
o 500Mt @ 1,139ppm Li for 3.03Mt contained Lithium Carbonate
Equivalent (LCE), at a 700ppm Li cut-off
This includes an exceptionally high-grade zone in the North
o 47.9Mt @ 2,193ppm Li for 560Kt LCE
o Reported at a higher 1,300ppm Li cut-off
o Coherent zone of >1,300ppm, with ultra high-grade core of >3,000ppm Li
ASX-listed Ioneer’s $2.2B NPV8 Rhyolite Ridge Project:
o Will produce 508kt of LCE in its first 20 years of operations1
o Has an average Ore Reserve grade of 1,443ppm Li1
This provides a compelling rationale for progressing the Red
Mountain Project through infill drilling and MRE upgrade to
technical studies, with a focus on the northern zone
15
$51.75m
$135.91m
$68.89m
$1190m
$23.44m
$15.07m
$135.69m $678.41m $138.4m
$256.48m $19.91m $41.82m $136.3m $23.55m $5.75m
$766.75m $22.36m $16.21m $77.09m
0
5
10
15
20
25
Lithium
in
Mineral
Resources
(LCE,
Mt)
Red Mountain currently undervalued amid
Exploration-Phase ASX Lithium MREs
Source: Public Company Reports. Market Caps current as at 7 June 2026. See Appendix 3 for detailed Mineral Resource Estimate breakdown
Red Mountain
Lithium Project
16
Favourable Mining
Geometries Mineralisation at surface
o ‘Day-one’ access to high-grade mineralisation
Broad zones of mineralisation
o Low dilution potential
Shallow-dipping stratigraphy
o Favourable open-cut mining geometry
Mineralisation open down-dip and along
strike
o Excellent exploration upside
~170m of continuous mineralisation at surface
17
Exploration Upside
Numerous exploration opportunities on the Project
• Defined by elevated lithium in soils and rock-chip samples
• 10 discrete areas of exploration upside
• 4 areas to be drill-tested in 2026
• 6 areas to undergo further surface sampling
February 2026 JORC-Compliant Exploration Target:
18
Battery-Grade
Lithium Product
Mining raw material
Beneficiation
Acid Leaching & Filtration
Impurity Removal
Crystallisation of
Battery-Grade Lithium
Product
Sedimentary Lithium:
Simplified Processing
Metallurgical testing well-advanced beyond project stage
Proven Battery-Grade Lithium Product
o 99.5% Battery-Grade lithium carbonate produced from Red Mountain
mineralisation
o Established processing flowsheet utilised
Scoping leachability test-work
o Lithium leachability of up to 98% in initial test-work
Beneficiation
o Successful beneficiation from Falcon and Attrition Scrubbing methods
o Increased lithium grade and reduced reagent-consuming waste minerals
By-Product potential for Strontium and Magnesium
19
Strategic By-
Product Potential
Strontium
o Strontium is a pyrotechnic chemical with defense application in flares,
tracers in ordnance, on which the US is 100% import-dependent
o Strontium reports to residue after lithium leaching
o Strontium Carbonate current pricing of USD $2,473/t on the SMM
o Strategic importance of Strontium enhanced in light of publicized
depletion of US munitions stocks in the recent conflict with Iran
o Recovery of Strontium would reduce solid waste and elevate the
status of Red Mountain as a potential sole domestic supplier of a
strategic metal with Defense application
Magnesium
o Epsomite (magnesium sulfate, Epsom salt) is mainly used in agriculture
as a fertilizer, with 2025 pricing ranging from US $370-420/t
o The US is 59% import-dependent for magnesium compounds, with most
of its (55%) magnesium sulfate currently imported from China
o Magnesium occurs with lithium at Red Mountain in the mineral Hectorite
o Epsomite may be recovered using evaporation-cooling crystallization to
produce a saleable product
US C-RAM (Counter Rocket, Artillery and Mortar) system
firing 20mm (strontium) tracer rounds at a rate of 4,500 rounds per minute
20
Appendix 1: US Sedimentary Lithium Projects
Disclaimer: With respect to the historical estimates and/or foreign estimates of mineralisation of the peer projects disclosed in table above, VMS cautions that:
• Foreign estimates are not necessarily equivalent to to JORC MRE categories and direct comparisons should be avoided. However, given the bulk of US sedimentary MREs are reported under non-JORC standards, it would be misleading to
not disclose these to the market.
• these estimates are not reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (referred to as the “JORC Code (2012)”);
• a Competent Person has not completed sufficient work to classify the historical estimates or foreign estimates as Mineral Resources or Ore Reserves in accordance with the JORC Code (2012); and
• it is uncertain that following further evaluation if the historical estimates or foreign estimates will be able to be reported as Mineral Resources or Ore Reserves in accordance with the JORC Code (2012).
Mr Matthew Healy, a Competent Person, who is the Chief Executive Officer and Executive Director of VMS, and a member of the Australasian Institute of Mining and Metallurgy (AusIMM), has considered the information for the historical
estimates and/ or foreign estimates of mineralisation for the peer projects disclosed in the table above and considers that the information disclosed is an accurate representation of the available data for peer mineral resource estimates in the
US lithium market. Mr Healy consents to the inclusion in this presentation of the matters based on this information in the form and context which it appears, with relevant source references provided for each historical and/or foreign resource
estimates described
21
Appendix 1: Cont’d
US Sedimentary Lithium Projects – source reports
22
Appendix 2
US Lithium Project Transactions on the ASX
Arizona Lithium (ASX: AZL)
• Sale of Big-Sandy Lithium Clay deposit to Advanced Lithium Research Centre LLC (completed August 2025)
• US $5m Cash
• 32.5Mt @ 1,850ppm Li (321kt LCE), comprising 14.6Mt @ 1,940ppm Li Indicated (151kt LCE) and 17.9Mt @ 1,780ppm Li inferred (170kt LCE)
• Transaction valued at AUD $23.3/t LCE
Pantera Lithium (ASX: PTL)
• Sale of Smackover Lithium Project to EnergyX (completed October 2025)
• A $40m total comprising A $6m in Cash and A $34M in EnergyX Stock
• Exploration Target of 436kt to 2.97Mt contained LCE
• Transaction valued at AUD $13.5/t - $91.7/t LCE (as Exploration Target)
Jindalee Lithium (ASX: JLL)
• Letter of Intent with SPAC for Merger and NASDAQ/NYSE listing (announced September 2025, incomplete as of 7 June 2026)
• Jindalee to receive 50m shares in NewCo valued at $10 per share in consideration for the transaction
• 3Bt @ 1,340ppm Li (21.5Mt LCE), comprising 1.47Bt @ 1,420ppm Li indicated (11.1Mt LCE) and 1.54Bt @ 1,270ppm Li inferred (104Mt LCE)
• Transaction valued at AUD $34.7/t LCE
23
ASX-listed lithium explorer (i.e. producers and developers excluded) Mineral Resource Estimates and contained Lithium Carbonate Equivalent (LCE).
Brine Resources as contained LCE and Li as mg/L, sedimentary resources in Mt and ppm Li and spodumene resources in Mt and Li2O%. Contained LCE
calculated from source Mineral Resource Estimates using 2.475 conversion factor for Li2O – LCE and 5.323 conversion factor for ppm Li to LCE
Company Ticker Type
Mineral Resource Estimates LCE in Mineral Resources (Mt)
Measured Indicated Inferred Meas. Ind. Inf. Total
Jindalee Lithium JLL Sed. 1470Mt @ 1420ppm Li 1540Mt @ 1270ppm Li 11 10 21.5
Lake Resources LKE Brine 4.19Mt LCE @ 226.4mg/l Li 4Mt LCE @ 206.6mg/l Li 2.89Mt LCE @ 215mg/l Li 4.19 4.00 2.89 11.07
European Metal Holdings EMH Spod. 53.3Mt @ 0.48% Li2O 360.2Mt @ 0.44% Li2O 294.7Mt @ 0.39% Li2O 0.63 3.92 2.84 7.40
Pmet PMT Spod. 108.68Mt @ 1.41% Li2O 35.08Mt @ 1.35% Li2O 3.80 1.17 4.97
Prairie Lithium PL9 Brine 4.6Mt LCE @ 98mg/l Li 4.60 4.60
Venari Minerals VMS Sed. 500Mt @ 1139ppm Li 0 3.03 3.03
Winsome Resources WR1 Spod. 61.4Mt @ 1.14% Li2O 16.5Mt @ 1.19% Li2O 1.73 0.49 2.22
Wildcat Resources WC8 Spod. 70Mt @ 1.01% Li2O 4.1Mt @ 0.76% Li2O 1.75 0.08 1.83
Global Lithium Resources GL1 Spod. 36.7Mt @ 1.03% Li2O 32.9Mt @ 0.96% Li2O 0.94 0.78 1.72
Atlantic Lithium A11 Spod. 3.7Mt @ 1.