Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 October 2024
SEPTEMBER 2024 QUARTERLY REPORT
Highly successful quarter sees significant lithium claystone discovery confirmed
at Red Mountain in Nevada, USA. High-impact drill programs either underway or
planned in Nevada and the Georgina Basin, NT in the December Quarter
Highlights
Lithium Projects, Nevada, USA
Red Mountain Project
RC Drilling
•
Final batch of assay results received for drill-hole RMRC008-011, returning intersections of up to +50m
thickness, including:
•
RMRC008: 25.9m @ 1,120ppm Li from 73.2m
RMRC009: 29.0m @ 1,060ppm Li from 123.4m to end-of hole
RMRC010: 33.5m @ 1,260ppm Li from 19.8m
Interpretation of results indicates the presence of multiple zones of lithium mineralization at the southern
end of the deposit, adding to its potential.
Rock chip sampling
•
81 rock-chip samples reveal the presence of high-grade lithium claystone mineralisation in outcropping
and sub-cropping claystones at Red Mountain.
•
Exceptional grades of up to 4,150ppm lithium reported and 20 samples return grades over 1,000ppm lithium,
indicating the presence of high-grade clays across the Project.
Georgina Basin, NT
•
Collaborative ANT Survey between Astute and Fleet Space Technologies (Fleet Space) commenced with
ExoSphere by Fleet® Ambient Noise Tomography (ANT) technology to be employed as part of a two-stage
survey aimed at characterising the thickness of cover and exploring for seismic velocity anomalies in subcropping basement rocks.
•
Astute awarded a co-funding grant of $100k to conduct a VTEM Max helicopter Electromagnetic survey over
EL32282 in the Project’s west to explore for sulphide-rich copper mineralisation.
Corporate
•
Entitlement Offer completed on the basis of 1 new share for every 4 shares held at an issue price of $0.028 per
share, raising $2.968 million (before costs).
•
Highly experienced geologist and mining executive Matt Healy appointed as CEO, strengthening the
Company’s leadership team.
•
The Company exercised its right to acquire a 2 % Royalty over the Georgina Basin Project. The final price is
subject to an independent valuation. Payment can be in either cash or ASE shares, at ASE’s election.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Lithium Projects
Projects Overview
The US State of Nevada hosts several large claystone-hosted lithium deposits and is home to North
America’s only lithium mining operation, Albermarle’s Silver Peak lithium brine operation. Other major
deposits in the state include Ioneer’s (ASX: INR) Rhyolite Ridge Project and Lithium America’s Thacker Pass
Project, one of the largest lithium deposits in North America (Figure 1).
Figure 1. Location of Astute’s Lithium Projects and other major Nevada lithium deposits.
Red Mountain Project
Background
Located in central-eastern Nevada (Figure 1), the Red Mountain Project was staked by Astute in August 2023.
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the Horse
Camp Formation. Elsewhere in the state of Nevada, equivalent rocks host large lithium deposits (see Figure
2) such as Lithium Americas’ (NYSE: LAC) 16.1Mt LCE Thacker Pass Project, American Battery Technology
Corporation’s (OTCMKTS: ABML) 15.8Mt LCE Tonopah Flats deposit and American Lithium’s (TSX.V: LI) 9.79Mt
LCE TLC Lithium Project.
After staking was completed, Astute executed the following exploration work programs:
•
An 819-point soil sampling campaign revealed strong lithium anomalism in soils, with grades of up
to 1,110ppm lithium and a coherent 50ppm+ lithium anomaly that stretched over an 8km strike
length and up to 2.8km wide (Figure 2); and
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
A rock-chip sampling campaign at Red Mountain designed to test for lithium at strategic locations
and across a range of outcropping and shallowly sub-cropping rock types revealed the presence
of strongly mineralised claystone, with 10 claystones grading on average 1,102ppm lithium, ranging
from 132-2,190ppm lithium.
•
As a relatively soft rock type, the claystones at Red Mountain are ‘recessive’, or lie beneath a typically thin
veneer of alluvium. The recessive nature of the claystone means that more claystone may be present than
is immediately apparent, with the harder rock types presenting as outcrop and the claystone being hidden.
Other attractive Project characteristics include outcropping claystone host-rocks and close proximity to
infrastructure, including the Project being immediately adjacent to the Grand Army of the Republic Highway
(Route 6), which links the regional cities of Ely with Tonopah.
Work completed during the quarter and results
RC Drilling
In the previous quarter, the Company commenced its maiden RC drilling campaign at the Red Mountain
Project.
The 11-hole drilling campaign was designed to test the thickness and grade of clay-hosted lithium
mineralisation in strategic locations across an approximate 5km trend. The campaign commenced
during late May and was completed in June, with a total of 11 holes (Table 1) drilled for a combined 1,518m.
Drill Hole ID
RMRC001
Easting
Northing
637610
(NAD83)
RL
Dip
Azimuth
Depth Drilled
4285589
1708
1694
180
182.9
4290201
-50
-50
270
128.0
-50
270
137.2
-50
270
182.9
(NAD83)
RMRC002
637105
RMRC004
637782
4288743
637321
RMRC006
637534
4288194
RMRC003
RMRC005
RMRC007
RMRC008
RMRC009
RMRC010
RMRC011
637105
637100
637676
637667
636942
636423
4290201
(m)
1694
1709
1687
4288197
1696
4287805
1672
4286218
1709
4285795
1704
4285791
4286202
1680
1650
(°)
-90
-50
(°)
-
270
(m)
36.6
137.2
-50
270
152.4
-50
270
152.4
-50
270
134.1
-50
-50
Table 1. Drill hole collar details
270
270
152.4
121.9
The initial assays results received from the first three holes were reported in the previous quarter, returning
high-grade mineralization and indicating the potential discovery of a significant lithium deposit (Figure
2). During the September Quarter, the Company reported assay results from the remaining eight holes,
RMRC004-011, from the inaugural Reverse Circulation (RC) drilling campaign.
As set out below, the assays returned high-grade mineralisation including the following drill intersections:
•
RMRC004: 13.7m @ 1,070ppm Li / 0.57% Lithium Carbonate Equivalent1 (LCE) from surface
83.8m @ 1,230ppm Li / 0.65% LCE from 16.8m
•
RMRC005: 26.0m @ 656ppm Li / 0.35% LCE from 3.0m
80.8m @ 1,270ppm Li / 0.68% LCE from 56.4m to End-of-Hole
•
RMRC006: 62.5m @ 1,070ppm Li / 0.57% LCE from 6.1m
15.3m @ 896ppm Li / 0.48% LCE from 71.6m
70.1m @ 1,090ppm Li / 0.58% LCE from 89.9m
•
RMRC007: 74.7m @ 1,160ppm Li / 0.61% LCE from 18.3m
25.9m @ 1,580ppm Li / 0.84% LCE from 115.8m
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
•
RMRC008: 25.9m @ 1,120ppm Li / 0.60% Lithium Carbonate Equivalent1 (LCE) from 73.2m
•
RMRC009: 50.3m @ 908ppm Li / 0.48% LCE from 15.2m
18.3m @ 904ppm Li / 0.48% LCE from 68.6m
13.7m @ 995ppm Li / 0.53% LCE from 99.1m
29.0m @ 1,060ppm Li / 0.57% LCE from 123.4m to End of Hole
•
RMRC010: 33.5m @ 1,260ppm Li / 0.67% LCE from 19.8m
30.5m @ 898ppm Li / 0.48% LCE from 74.7m
•
RMRC011: 44.2m @ 905ppm Li / 0.48% LCE from Surface
48.8m @ 834ppm Li / 0.44% LCE from 51.8m
13.7m @ 1,260ppm Li / 0.67% LCE from 120.4m End of Hole
This final batch of assays, from drill holes located in the south of the project area (Figure 2), demonstrate
multiple zones of lithium mineralisation, adding to the overall potential of the Project. Combined with the
previously announced results, these indicate excellent scale and grade potential at Red Mountain, as it
continues to emerge as a lithium project of significance in North America.
Figure 2. Drill-hole locations and intersections, and gridded soil sample geochemistry over aerial image.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Rock chip sampling
During the quarter, a total of 81 samples were collected and assayed, adding to Astute’s understanding of
the prospective horizons at Red Mountain and complementing the initial drill results from its maiden
drilling campaign. The rock chip assays are shown, along with previous results including the recently
announced high-grade lithium discovery, in Figure 3.
Notable results returned up to 1.4km north of the recently reported discovery included:
•
4,150ppm Li, brown-green claystone sampled 490m north of RMRC002.
•
2,900ppm Li, brown claystone sampled 990m north of RMRC002.
•
2,550ppm Li, brown claystone sampled 1.40km north of RMRC002.
Figure 3. Rock chip and drill-hole locations, and gridded soil sample geochemistry over aerial image.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Cobre Project
Background
The Cobre Project was also staked by the Company in mid-2023 following positive results from
reconnaissance exploration sampling undertaken over a selection of areas identified as part of the same
desktop project generation exercise that identified Red Mountain. The project is located in north-east of
Nevada.
Work completed during the quarter
No work done was completed during the quarter for the Cobre Project.
Altair and Polaris Projects
Background
The Altair and Polaris Projects were staked by the Company in Q3 of the 2023 Financial Year. This followed
a systematic review of regional open file data, such as mapped geology, topography, stream sediment
geochemistry, land administration and an assessment of suitable claim-free areas.
Work completed during the quarter
During the quarter, the Company completed a strategic review of the other lithium assets in its Nevada
portfolio with a view to optimizing its exploration portfolio and focusing on projects with the greatest
potential to create value for shareholders.
While both the Polaris and Altair Lithium Projects have delivered encouraging anomalous to low-grade
lithium results, the mineralization sits beneath significant thicknesses of gravel overburden. By contrast,
the recent discovery of thick, high-grade intersections of lithium mineralisation at the Red Mountain
Project occurs from surface, with this project rapidly emerging as discovery of significance in North
America.
Having regard to the above, the Company has decided to relinquish the Polaris and Altair Projects,
allowing it to focus its resources and time on those assets considered most likely to create significant
value for shareholders.
Georgina Basin, Northern Territory IOCG Project
Project Overview
Located in the highly prospective East Tennant Province in the Northern Territory, the Georgina Project
comprises seven granted Exploration Licences and three under application, for a combined total of
approximately 4,500km2 (Figure 9).
Astute Metals is the 100% owner of the Georgina Project.
The East Tennant Province has been the subject of intense geoscientific investigation by both Geoscience
Australia and the Northern Territory Geological Survey for over five years. Pre-competitive work undertaken
as part of the Federal Government’s $225 million Exploring for the Future program (EFTF) included solid
geology interpretation, alteration proxy mapping and mineral prospectivity mapping for Iron Oxide
Copper Gold (IOCG) deposits.
The collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the highly
prospective nature of the region by intersecting prospective host rocks, IOCG-style alteration and sulphide
mineralisation as part of a 10-hole program at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some smaller highgrade variants – most notably those at Tennant Creek. This style of deposit contains elevated levels (1060wt %) of the iron oxide minerals magnetite and hematite, which gives rise to their (typically) elevated
magnetic and gravity (density) properties.
Australian IOCG’s include the Olympic Dam, Prominent Hill and Carrapateena deposits in South Australia;
Ernest Henry in north-west Queensland; and the high-grade Warrego and Juno deposits, located west of
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
the Georgina Project at Tennant Creek in the Northern Territory.
In 2023, Astute was awarded a co-funding grant by the NT Government to conduct the ANT survey, under
Round 16 of the Geophysics and Drilling Collaborations program. The grant, valued at $100k, is one of two
awarded to the Company this year.
The award of this grant is testament to the sound technical rationale employed by the Astute technical
team in the survey design. The Company would like to acknowledge the Northern Territory Geological
Survey for their continued support and their commitment to establishing the Northern Territory as a Tier-1
exploration jurisdiction.
Commencement of Ranken ANT Survey
During the quarter, Fleet Space Technologies (“Fleet Space”) commenced the collaborative Ambient Noise
Tomography (“ANT”) geophysical survey on the Company’s Ranken tenement area, located in the east of
its Georgina IOCG Project in the Northern Territory.
Figure 4. Geoscience Australia mineral potential ‘heat map’, with the hotter colours more prospective – noting the
Ranken Project tenements EL32285 and EL32286 in the far east of the project, with the proposed ANT survey area.
The Ranken tenements cover an area mapped as being highly prospective for sediment-hosted base
metal mineralisation, according to Geoscience Australia mineral potential maps (Figure 4). This is due to
the basement geology consisting of interpreted McNamara and South Nicholson Group rocks, which
elsewhere are known to host several large-scale base metal deposits, including the world-class Mt Isa
copper and zinc-lead-silver deposits and the Century zinc-lead-silver deposit.
Fleet Space will undertake a two-stage ANT survey aimed at characterising the thickness of cover and
exploring for seismic velocity anomalies in sub-cropping basement rocks. The ANT survey is expected to
provide valuable insights into the copper, silver, zinc and lead exploration potential at Ranken, and will be
critical in the planning of future drill holes at the Project.
The survey, of which the field component was completed during the quarter, is expected to have final data
returned to the Company in Q4 2024.
Co-funded VTEM Max Airborne Electromagnetic Survey
The Company has been successful in its application for NT Government exploration grant co-funding of
a VTEM Max geophysical survey under Round 17 of the Geophysics and Drilling Collaborations (GDC)
program.
The grant is to a maximum value of $100k to conduct a VTEM Max survey in the west of the Georgina IOCG
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Project.
The proposed VTEM Max survey is a helicopter electromagnetic survey designed to explore for sulphiderich copper deposits across most of EL32282. VTEM electromagnetic technology has been shown to be
effective in detecting conductive mineralisation at depths of up to 650m, making it a powerful tool for the
direct detection of certain base metal deposit styles. A total of 1,423-line km of survey will be flown at a
400m line-spacing for total coverage of 522km2 (Figure 5).
Figure 5. Proposed VTEM Max Survey lines over SRK interpreted basement geology and prospective alteration.
Iron sulphide copper gold (ISCG) deposits are a sulphide-rich subset of IOCG deposits known to respond
well to detection by electromagnetic methods. Examples include AIC Mines Limited’s (ASX: AIC) Eloise
Copper Mine and Jericho Copper deposit, both located in NW Queensland.
The Company considers that the area being surveyed has excellent potential for mineralisation amenable
to direct detection. In addition, the survey will cover a number of areas of interpreted alteration (Figure 5)
that were identified as conceptual exploration targets as part of a 2021 SRK prospectivity review
undertaken by the previous holder, Greenvale Energy (ASX: GRV). The survey crew mobilised to site in late
September, with final data expected in Q4 2024. The Company would like to acknowledge the Northern
Territory Geological Survey for their continued support and their commitment to establishing the East
Tennant Creek region as a Tier-1 exploration area.
Leichhardt East Exploration Drilling
The Company announced during the quarter that the planned drilling at Leichhardt East had been
delayed due to an unusually high number of submissions received by the NT Government, ostensibly due
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
to numerous explorers submitting MMP applications prior to 1 July, to be assessed under transitional
arrangements prior to the new Act coming into effect. The drilling is now scheduled to commence in early
November 2024.
Governor Broome Mineral Sands Project, WA
Project Overview
The 100%-owned Governor Broome Mineral Sands Project is located approximately 95km by sealed road
south of Busselton, 105km south of Iluka’s processing plant at Capel, and 135km from Bunbury Port and
from Picton, where Doral has a heavy mineral separation plant (Figure 7).
A 132kV power line is located just 5km to the north and a three-phase power line passes through the
Governor Broome Project, giving it significant strategic advantages from an infrastructure and access
perspective.
Figure 6. Governor Broome Project Location, WA.
The Company has progressed its de-risking strategy for the Governor Broome Project in 2023, with the
successful execution of in-fill drilling allowing for the upgrade of high-value Inferred Mineral Resources to
Measured and Indicated status, the acquisition of the high-grade Fouracres deposit, located along strike
from Jack Track, and the completion of a bulk testwork program on samples from the most recent Jack
Track drilling campaign.
The bulk testwork program was highly successful, demonstrating the amenability of the Jack Track
Deposit to processing through the feed preparation circuit using conventional mineral sands processing
equipment. The material was processed without difficulty with the sand fraction containing the valuable
heavy minerals (Heavy Mineral Concentrate/HMC) readily liberated from the slimes without the need for
energy intensive processing equipment.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Furthermore, subsequent dry testwork demonstrated that a range of ilmenite, leucoxene, rutile, and zircon
products could be recovered from the heavy mineral concentrate. Monazite was also recovered to a paramagnetic concentrate stream. Product qualities were consistent with other heavy mineral products on
the market.
Below is a table summarizing the resources associated with the Governor Broome Project:
Tenement
Category
Tonnage
R70/58 - Jack Track
Measured
20.2
R70/53 - Governor Broome
R70/22 - Fouracres
Project
Indicated
HM
Slimes
4.2
8.4
(Mt)
(%)
21
3.5
(%)
7.9
Total
41
3.9
8.2
Measured
8.0
5.0
13
Inferred
7
3.5
12
Indicated
44
5.0
13
Total
59
4.8
12.5
Indicated
0.72
11.4
6.5
Total
0.93
9.6
7.1
Measured
28.4
4.4
9.7
Inferred
7
3.5
12
Inferred
Indicated
Total
Resources
0.2
3.5
66
4.5
101
4.5
9
12
11
Table1. Governor Broome Project Resources – at 2% HM lower block-cut-off grade2.
Note that the above figures have been appropriately rounded.
The Fouracres Resources estimated at a 3% Heavy Mineral (HM) lower block-cut-off grade
Governor Broome and Jack Track Resources estimated at a 2% HM lower block-cut-off grade
Scoping Study
In June 2024, the Company announced the results from the Scoping Study for the Governor Broome Project
and the financial metrics from the Study were exceptionally positive, as tabulated below:
Metric
Unit
Value
Average annual revenue
A$ million
125
Capital cost
Average annual operating cost
Pre-tax NPV (at 10% discount rate)
Pre-tax IRR
Weighted average revenue to cash cost ratio
(payback period)
Capital Payback Period
A$ million
A$ million
A$ million
%
91
83
139
54
1.9
Years
Table 2. Scoping Study Material outputs.
<2
The full release for the Scoping Study, including detailed assumptions, results and Cautionary
Statements is available in the ASX Announcement dated 4 April 2024
Work During the Quarter
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
No work was undertaken during the quarter on the Governor Broome Project. The Company is actively
investigating its options for realising value from the Project.
Needles Gold Project, Nevada
No work was undertaken during the quarter on the Needles Gold Project.
East Kimberley Diamond Project
No work was undertaken during the quarter for the East Kimberley Diamonds Project. The Company
continues to explore other opportunities for this asset.
Corporate
Completion of Entitlement Offer
During the quarter, the Company completed a fully underwritten, 1-for-4 non-renounceable entitlement
offer of new fully-paid ordinary shares at an issue price of $0.028 cents per share in the Company (“New
Shares”), raising a total of $2.968 million (before costs) (“Entitlement Offer”).
The Offer was well supported by its existing shareholders and the Board has issued 100% of the additional
10.5 million New Shares that were applied for by shareholders.
The Offer closed with a shortfall of approximately $1.994 million, which was allocated to major shareholder
Holdmark Property Group ($0.69 million) and Chairman Tony Leibowitz ($0.54 million), with the balance of
$0.76 million being taken up by a number of other existing shareholders and other investors.
The amount of shortfall taken up by existing shareholders and new investors has reduced the underwriting
commitment for both Holdmark Property Group and Kalonda Pty Ltd (Kalonda), an entity controlled by Mr
Leibowitz.
As a result, substantial shareholder Holdmark Property Group has maintained its shareholding at 19.99%
while Kalonda has increased its shareholding from 11.94% to 13.19%. Mining Investments Ltd also
participated in the Entitlement Offer, with a slight decrease in its shareholding to 9.14%.
Matt Healy appointed as CEO
Highly experienced mining executive Matthew Healy was appointed as the Company’s Chief Executive
Officer (CEO) during the quarter. Mr Healy was appointed to the Astute Board as an Executive Director on
29th November 2023, having held the role of General Manager – Exploration since November 2022.
His appointment as CEO reflects his successful oversight of the Company’s operations and management
over the past year, and his strong leadership and dedication in advancing all of Astute’s key projects in
North America and Australia.
Mr Healy lead the identification and staking of the Red Mountain and Cobre Projects.
Acquisition of the 2% Royalty in Georgina Basin
During the quarter, the Company advised that it has exercised its right under a Call Option Deed dated 28
November 2022 (Deed) to acquire the 2% Net Smelter Return royalty on the Georgina Basin IOCG Project
in the Northern Territory (Royalty) from Greenvale. The decision to exercise the Call Option by Astute
requires it to mandatorily complete the acquisition.
Under the terms of the Deed, the consideration to be paid to Greenvale for the Royalty will be based on an
independent Fair Market Valuation (“valuation”). Astute and Greenvale have appointed SRK Consulting
Australasia to undertake the valuation. The report is report is due early next quarter
Under the terms of the Deed, the transaction requires ratification by Astute shareholders following
finalisation of the valuation and payment terms. Payment for the Royalty is either in cash or fully-paid ASE
shares (Shares), at the election of Astute. If payment is to made by way of Shares, the number of Shares
is to be determined by ASE’s volume-weighted average price of the preceding seven days prior to the
exercise of the Call Option.
The acquisition provides simplification of the ownership of Georgina Basin.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
ASX Additional Information
The Company provides the following information pursuant to ASX Listing Rule requirements:
1.
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was
$1,286,455. Full details of exploration activity during the 30 September 2024 quarter are set out in this
report.
2.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and development
activities for the quarter.
3.
ASX Listing Rule 5.3.5: Payment to related parties of the Company and their associates during the
quarter was $200,850, in cash.
The Company advises that this relates to remuneration of Directors only. Set out below is the following
additional information in relation to the cash flow statement:
Name of
Nature of Payment
Tony
Ongoing Non-Executive Chairman
30,000
John
Ongoing Non-Executive Director fees
15,000
Matthew
Ongoing Executive Director fees,
81,850
Vincent
Executive Director, Company
74,000
Director
Leibowitz
Young
Healy
Amount ($) 1,2
fees
including superannuation
Fayad
Secretary and Chief Financial Officer
Total
200,850
1
Amounts exclude any GST, where applicable.
2
Amounts include any applicable employee taxes and superannuation entitlements paid in respect to the directors
remuneration.
Table 3. Director’s remuneration
Tenements
In accordance with Listing Rule 5.3.3, Astute provides the following Information concerning its exploration
licences.
Appendix 1 sets out a list of the Company’s exploration licences held at the end of the quarter.
End Notes
The information contained in this announcement related to the Company’s past exploration results is
extracted from, or was set out in, the following ASX announcements which are referred to in this Quarterly
Activities Report:
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Date of
Name of announcement
30 September
2024
Exercise of call option over Georgina IOG
Project.
announcement
23 August 2024
Successful completion of Entitlement Offer
16 August 2024
Appointment of Chief Executive Officer
13 August 2024
Optimisation of Lithium Portfolio
9 August 2024
Georgina IOGC Project – Exploration Update
7 August 2024
Receipt of Final Assays for the Red Mountain
22 July 2024
Further high grade intersections at the Red
Project
Mountain Project
8 July 2024
High grade Rock Chip samples at Red
Mountain
4 April 2024
Governor Broome Minerals Sands – Scoping
Study
Table 4: Summary of announcements
Authorisation
This announcement has been authorised for release by the Board of Astute.
More Information
Matt Healy
Executive Director & CEO
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report that relates to:
Nevada Lithium Projects
The information in this report that relates to Nevada Lithium Projects Sampling Techniques and Data
(Section 1) is based on information compiled by Mr Matthew Healy, a Competent Person who is a Member
of The Australasian Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a fulltime employee of Astute Metals NL and is eligible to participate in a Loan
Share your feedback
Discover