Astute gears up to drill high grade gold-silver targets
Released
Released
Announcement PDF
12 August 2025
ASTUTE GEARS UP TO DRILL GOLD-SILVER TARGETS AT
THE NEEDLES GOLD PROJECT, NEVADA
Six high-priority targets to be tested, commencement expected in three weeks
Key Highlights
•
High-grade gold-silver targets confirmed for upcoming RC
drilling at the Needles Gold Project
•
Six priority drill targets identified for testing:
•
Eastern Shaft - Rock-chip samples of up to 33g/t Au
and 622g/t Ag proximal to historical mine shaft
•
Tomahawk - 200m-long trend at the Tomahawk Mine,
with assays up to 5.54g/t Au and 406g/t Ag
•
Arrowhead Mine - 107m-deep 4-level mine with
along-strike intersections including 3.42m @ 2.92g/t
Au and 905g/t Ag
•
Arrowhead East – Two drill targets with strong arsenic
pathfinder grades ranging from 1,860ppm to
6,640ppm, gold grades of up to 1.1g/t Au and silver of
up to 5.5g/t Ag
•
Whopper Junior - Strong pathfinder anomalism in
antimony, arsenic and mercury
•
Notice of Intent filed with the BLM for approval
•
Company expects to commence drilling within the next
three weeks.
To hear CEO Matt Healy discuss this ASX Release click here
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to advise that preparations are
well-advanced for Reverse Circulation (RC) drilling at its Needles Gold-Silver project in Nevada, USA,
with hole designs complete and a Notice of Intent submitted to the Bureau of Land Management (BLM)
for permitting approval. A series of six high-priority vein style gold-silver targets will be tested.
The Company is in advanced discussions with a drill contractor to undertake the program and is actively
engaging with the BLM to secure the required approval, with the drilling expected to commence within
the next three weeks.
Astute Chairman, Tony Leibowitz, said:
“Following the recent completion of a detailed review of historical exploration data from the Needles
Gold Project, we’re very excited to now be gearing up to undertake a targeted RC drilling campaign
to test six initial high-priority prospects.
“Each of the targets has demonstrated either high-grade historical gold-silver hits or compelling
anomalism for pathfinder elements, with the potential to deliver new discoveries for Astute in one
of the world’s premier gold and silver mining districts.
“We expect to be on the ground drilling at Needles within the next three weeks, with drilling at our
Red Mountain Lithium Project to follow immediately after, providing a strong stream of news flow for
Astute shareholders in the months ahead.”
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Background
The Needles Project comprises 216 unpatented lode mining claims covering an area of 18km2 and lies
92km east of the mining town of Tonopah in Nye County, Nevada, USA (Figure 5). The project was
acquired due to its geological similarities with bulk-tonnage gold operations in Nevada such as the
20Moz+ Round Mountain mine8.
Previously known as the Arrowhead district, the project includes numerous historical gold-silver workings
dating from the early 1900’s to 1920’s, with some of notable scale. While historical records are sparse, the
Arrowhead Mine is recorded as an incline shaft to 350ft (106.7m) with drifting on four levels, and the
Arrowhead Extension Mine was a 150ft (45.7m) two-compartment shaft with two working levels. These
operations mined bonanza-style epithermal vein gold and silver mineralisation.
The current project area has seen a number of previous explorers including Newcrest (2002-04), Taranis
Resources (2002-07), Excalibur Resources (2007-09) and Greenock Resources, amongst others.
The Needles Project is hosts a large, underexplored epithermal system fertile for gold and silver, with rock
chip results of up to 33g/t Au and 1,115g/t Ag 3. Existing drilling is mostly shallow, and alteration mineralogy
and pathfinder geochemistry suggests that the most prospective exploration space is yet to be tested.
Planned Drilling
A total of six targets will be tested as part of the upcoming RC drilling at Needles.
Eastern Shaft
Planned drilling at Eastern Shaft will target high-grade rock chip results in proximity to the historical
unnamed shaft located in the east of the project (Figure 1). Previous RC drilling, which intersected no
material gold-silver mineralisation, has not effectively tested the interpreted east-southeast trend of
rock chips, and was drilled away from the historical shaft. A cluster of ten high-grade rock chips have
been taken from outcrop and mineralised dumps proximal to the shaft. These samples, which were
collected in two separate campaigns, range in grade from 1.4 –33.0g/t Au and 12.2 – 622g/t Ag. Two
holes have been planned for the prospect.
Tomahawk
Planned drilling at Tomahawk will test an un-drilled ~200m east-west trend of high-grade rock chip
samples which includes the historical Tomahawk Shaft and another <15m deep historical mine shaft
(Figure 2). Rock chips here were taken in two campaigns, and include dump samples from the
Tomahawk Mine itself. Apart from a single low-grade sample of 17ppb Au and 0.4g/t Ag, the remaining
five samples range from 0.31 – 5.54g/t Au and 10.6g/t – 406g/t Ag. Two holes are being permitted for
Tomahawk of which one is contingent on initial drilling success.
Arrowhead
A single drill hole will aim to test for mineralisation down-dip below the historical mine (Figure 3). Previous
drilling tested for mineralisation in the shallows along strike from the Arrowhead shaft, however this
drilling did not test down-dip of mineralisation. Intersections to the north and south of the mine include:
•
•
•
•
•
Needles-63 intersected 3.42m @ 2.92g/t Au and 905g/t Ag from 25.54m
Needles-28 intersected 6.5m @ 0.95g/t Au and 235g/t Ag from 26.2m
Needles-27 intersected 1.4m @ 1.7g/t Au and 528g/t Ag from 31.2m
Needles-11 intersected 1.6m @ 3.8g/t Au and 546g/t Ag from 17.6m
Needles-7 intersected 6.1m @ 1.46g/t Au and 424g/t Ag from 26m
Further drilling at Arrowhead will be subject to the results of the single planned drill hole.
Arrowhead East Targets
Two separate targets have been identified for drill testing at Arrowhead East. Both targets sit on a
northwest trend characterised by high gold-silver ratio rock chips with no previous drilling (Figure 3).
The northernmost of the two targets returned rock chip results of 1.11g/t Au and 5.4g/t Ag with strong
arsenic of 6,640ppm. The southern target hole will be drilled beneath a cluster of rock chips grading up
to 0.59g/t Au and up to 3.3g/t Ag, and strong arsenic of 1,860ppm to 5,500ppm As. The strength of
pathfinder geochemistry at this prospect is interpreted to reflect proximity to better developed
mineralisation. One hole will be drilled at each of the two Arrowhead East targets.
Whopper Junior
The Whopper Junior prospect exhibits anomalous gold (up to 0.39g/t Au) and silver (up to 72g/t Ag) in
rock chip samples, but also elevated pathfinders such as arsenic (up to 4,800ppm As), antimony (up to
87ppm Sb) and mercury (up to 4ppm Hg). A small number of holes have been drilled at the prospect,
including Needles-5, which intersected a broad zone of anomalism - 23.5m @ 3875ppm As, 36.7ppm
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Sb and 1.48ppm Hg (Figure 4). Arsenic and antimony are well-established pathfinder elements in
epithermal gold-silver systems, and mercury is typically found above the gold-bearing zone, as its
volatility causes its upward migration to the near surface where it is deposited. Three holes are being
permitted at Whopper Junior, two of which are contingent on initial success. Drill holes have been
generally designed to test at deeper levels than the previous drilling, where the potential for gold-silver
mineralisation is interpreted to be heightened.
East
North
Azimuth
Dip
Planned
(WGS84)
(WGS84)
(°)
(°)
Depth (m)
Drill
572392
4215540
60
-50
150
AEP01
Drill
572781
4215859
40
-60
120
AEP02
Drill
572891
4215767
40
-50
120
ESP01
Drill
573213
4215690
360
-50
100
ESP02
Drill
573213
4215690
360
-80
150
THP01
Drill
571527
4214914
350
-50
110
THP02
Drill
571527
4214914
350
-70
170
THP03
Contingent
571396
4214944
350
-50
150
WJP01
Drill
571519
4216971
55
-60
250
WJP02
Contingent
571624
4217046
55
-60
120
WJP03
Contingent
571581
4216925
55
-70
200
Plan ID
Status
AHP01
Table 1. Planned hole details submitted for permitting
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 1. Eastern Shaft prospect, planned and existing drill holes and rock chip sample geochemistry over aerial imagery.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 2. Tomahawk prospect, planned and existing drill holes and rock chip sample geochemistry over aerial imagery.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 3. Arrowhead area (including Arrowhead East), planned and existing drill holes and rock chip sample geochemistry over aerial imagery.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 4. Whopper Junior prospect, planned and existing drill holes and rock chip sample geochemistry over aerial imagery.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Commentary on Historical Exploration Data
A comprehensive review of historical exploration data for the Needles Project was undertaken and
announced by the Company in the ASX release dated 30 June 20253. Historical drilling and rock chip
sampling data referenced in this release attracts the following commentary:
Rock Chip Sampling
Original assay files have been located for all but 10 of the Taranis samples. The Barrick surface sample
dataset appears to be an extract from a surface sample database, containing method information for
many elements, however not for gold or silver. No QAQC data is available for the Taranis or Barrick rock
chip data. Rock chip sampling was also undertaken by the Company under its previous name, Astro
Resources NL, with results announced to market in 20171 and 20202. A tabulated summary of all rock chip
sample results is provided in Appendix 4, including the company that undertook the sampling.
Point locations from the various sampling campaigns commonly sample the same veins in close
proximity, due to different parties targeting the same outcropping zones of alteration and veining.
Generally, the historical results have been corroborated with comparable results from rock chip sampling
campaigns undertaken and announced previously by the Company1,2, providing confidence in historical
data despite some shortcomings in historical record keeping. Rock chip geochemistry in gold and silver
is typically elevated in trends of north-east oriented sampled veins and around historical workings.
Figure 5. Location of Needles Gold Project, and significant Nevada gold deposits.
mm
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Exploration Drilling
Drill collar locations for historical campaigns have been validated with aerial imagery. Drillhole
orientation data has been located for all holes, including setup orientations and downhole surveys.
Summary geological logging data is complete, however copies of original drill logs are missing for the
Taranis and Excalibur drill campaigns. Only drill hole intersections for which an original lab file has been
sourced have been quoted in this announcement. Drill collar and assay data is tabulated in Appendices
3 and 2 respectively.
Next Steps
The Company is in advanced discussions with a drill contractor to conduct RC drilling at the Needles
Project, and is actively engaging with the BLM ahead of its approval of the drilling campaign and
associated ground disturbance, with a view to commencing drilling within the next three weeks.
Concurrently, drill design and permitting work for the Red Mountain Lithium Project is underway with a
view to drilling commencing at Red Mountain immediately upon the completion of RC drilling at Needles.
1 ASX: ARO 18 Dec 2017 ‘Update on Needles Exploration Project’
2 ASX: ARO 1 Dec 2020 ‘Mapping results confirm Needles as a viable exploration gold Project’
3 ASX: ASE 30 June 2025 ‘Needles Gold-Silver Project: Data review identifies priority drill targets’
4 ASX: ARO 25 Feb 2022 ‘Drilling update assays for holes 21ND_001 and 21ND_002’
5 ASX: ARO 26 May 2022 ‘Drilling update assays for holes 21ND_003’
6 ASX: ARO 25 July 2022 ‘Drilling update assays for holes 21ND_004’
7 ASX: ARO 19 Dec 2019 ‘Needles RC drilling results’
8 2016, Howell, S., Formation of disseminated epithermal gold ore at Round Mountain, GSA Annual Meeting in Denver, CO, USA - 2016
Authorisation
This announcement has been authorised for release by the Board of Astute.
Astute Metals NL Interactive Investor Hub
Engage with Astute Metals through accessing reports, presentations, interviews and
other Company content.
Ask questions and browse responses to other investors’ questions
Click on https://astutemetals.com/auth/signup and follow the prompts to sign up
More Information
Matt Healy
Executive Director & CEO
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report is based on information compiled by Mr. Matthew Healy, a Competent
Person who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM Member number
303597). Mr. Healy is a full-time employee of Astute Metals NL and is eligible to participate in a Loan
Funded Share incentive plan of the Company. Mr. Healy has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr. Healy consents to the inclusion in the report
of the matters based on his information in the form and context in which it appears.
mm
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialisedindustry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheldXRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Taranis rock chips were collected on a 2-5kg
basis using a hammer and chisel. Rock
exposures and (mine) dump samples were
collected as part of the campaigns. See
Appendices for details.
Include reference to measures taken to
ensuresample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation thatare Material to the Public
Report.
No details on sampling methods for the Barrick
campaign of rock chips.
Astro Resources rock chips and drilling
previously announced incl. JORC Table 1 (see
footnotes 1 and 2)
Taranis & Excalibur drilling using NQ diamond
methods and half-core sampling.
.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, suchas where there is
coarse gold that has inherentsampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openholehammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
NQ drilling methods employed by Taranis and
Excalibur. HQ and RC methods employed by Astro,
which were previously announced incl. JORC
Table 1 (see footnotes 4, 5, 6 and 7)
Drill sample
recovery
Method of recording and assessing core
andchip sample recoveries and results
assessed.
No formal recovery records are available for
the Taranis or Excalibur drilling.
Measures taken to maximise sample
recoveryand ensure representative nature
of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gainof fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
innature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the
relevantintersections logged.
Poor drill core recovery is to be expected near
surface as a function of rock weathering.
Recovery for Astro Resources diamond drilling
previously announced incl. JORC Table 1 (see
footnotes 4, 5, 6 and 7)
Drill core/percussion chips for the entire hole was
logged for lithology by contract/staff geologists
for the Taranis, Excalibur and Astro drilling
campaigns
Logging is mostly qualitative with some numerical
estimates of notable minerals
Photography of drill core was undertaken
systematically for the Astro diamond holes
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and
sample
preparatio
n
If core, whether cut or sawn and whether
quarter, half or all core taken.
Taranis and Excalibur drill core was sampled to
a maximum of 1.5m length or to geological
boundaries. Drill core was marked up on site,
and appears to have been half-cored off site.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness
of
the
sample
preparationtechnique.
Astro Resources Drilling announced previously
incl. JORC Table 1 (see footnotes 4, 5, 6 and 7)
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the sampling
isrepresentative of the in-situ material
collected,including for instance results for field
duplicate/second-half sampling.
Quality of
assay
data and
laboratory
tests
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used
and whether the technique is considered
partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the parameters
used in determining the analysis including
instrument make and model, reading times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precisionhave been established.
Verification
of
sampling
and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical
and
electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Assay method for gold for Barrick rock chips
unknown, but ICP-MS for multielement
Taranis and Astro Resources rock chips were
fire assay for gold, and four-acid and ICP-MS or
ICP-OES finish. Some samples employed a 2acid digest and ICP finish.
Assay methods employed for historical work
are appropriate (where known), particularly for
the main metals of interest – gold and silver.
Some digests employed (esp. 2-acid) are
partial in nature and therefore concentrations
of some elements may be underestimated e.g.
Zr.
Sample intervals were assigned a unique
sample identification number prior to sample
despatch. No duplicate sample IDs exist across
historical explorers.
Most historical exploration does not appear
to have used CRMs and/or blanks for QAQC.
While there are some apparent CRM results in
historical assays, there is no record of QAQC
details and/or assessment. See Footnotes 1, 2,
4, 5, 6 and 7 for Astro Resources QAQC details.
Drill collar and sample locations determined
using hand-held GPS with location reported in
either WGS84, NAD27 or NAD83 UTM Zone 11.
Expected hole location accuracy of +/- 10m.
Drill hole locations were validated by using
aerial imagery, which indicated no issues.
Downhole survey data collected for all holes
with the exception of some vertical drill holes.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing is appropriate for early exploration
purposes. Rock chip sampling is appropriate
for exploration purposes.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
MineralResource and Ore Reserve estimation
procedure(s) and classifications applied.
1.5m sample intervals, or to geological
boundaries where appropriate, widely adopted
as standard practice in drilling in the USA.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
Sample
security
The measures taken to ensure sample security.
No details for historical work programmes. See
footnotes 1, 2, 4, 5, 6 and 7 for Astro Resources
work programme details
Audits or
reviews
The results of any audits or reviews of
samplingtechniques and data.
Not applicable
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Typical mineralised structure orientations at
Needles are east-northeast or north-northwest.
There is some evidence of other orientations,
which would not be unusual in an epithermal
environment. Drill holes appear to have
attempted to target structures at right angles
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
Needles Mining Claims held in 100% Astute
subsidiary Needles Holdings Inc.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified by the
Bureau of Land Management (BLM)
Exploration
done by
other parties
Acknowledgment and appraisal of exploration
byother parties.
Previous exploration discussed in body text and
summarised in ASX release of 30 June 2025 –
See footnote 3
Geology
Deposit type, geological setting and style of
mineralisation.
The principal target deposit style is lowsulfidation epithermal gold and silver
mineralisation. The Project comprises mainly
oligocene to Miocene volcanic rocks, with minor
igneous intrusives. A large alteration system is
evident from ASTER imagery and geological
mapping/logging and petrography.
Some tuffs at the project are porous and thus
considered prospective for dissemination style
mineralisation. Vein style mineralisation evident
at surface, which has been exploited by
historical mining efforts (Footnote 3).
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
◦ easting and northing of the drill hole collar
◦ elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
◦ dip and azimuth of the hole
◦ down hole length and interception depth
◦ hole length.
Planned drillhole locations, orientations and
drilled depths are tabulated in body report,
with historical drillhole details in appendix 3.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Intersections, where quoted are weighted by
length.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations should
be shownin detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
Insufficient information available due to early
exploration status.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
notknown’).
Diagrams
Appropriate maps and sections (with scales)
andtabulations of intercepts should be included
for any significant discovery being reported
These should include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Included in ASX announcement
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
This release describes all relevant information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysicalsurvey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
This release describes all relevant information
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions orlarge-scale step-out drilling).
Exploration results to date at Needles justify further
exploration.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 2 – Needles Drilling
Sample Assay Table
Hole ID
From
(m)
To (m)
Au (g/t)
Ag (g/t)
Hole ID
From
(m)
To (m)
As
(ppm)
Sb
(ppm)
Hg
(ppm)
Needles-7
26
27.3
388
428
Needles-5
44.1
44.4
82
0.90
0.28
Needles-7
27.3
28.2
90
43
Needles-5
44.4
45
104
1.00
0.34
Needles-7
28.2
28.9
3974
1249
Needles-5
45
45.5
73
1.00
0.21
Needles-7
28.9
29.8
1658
448
Needles-5
45.5
45.6
241
3.40
0.16
Needles-7
29.8
30.4
40
13
Needles-5
45.6
46.5
308
2.70
0.77
Needles-7
30.4
31
696
124
Needles-5
46.5
47.4
131
2.10
0.39
Needles-7
31
31.6
5020
912
Needles-5
47.4
47.9
196
1.90
0.67
Needles-7
31.6
32.1
1192
Share your feedback