Drilling Commences at the Red Mountain Lithium Project
Released
Released
Announcement PDF
10 October 2024
NEW PHASE OF GROWTH DRILLING COMMENCES AT RED
MOUNTAIN LITHIUM PROJECT, USA
Drilling designed to extend mineralisation and advance interpretation
Key Highlights
•
True North Drilling Diamond Drill (DD) rig on site and new
drilling campaign now underway.
•
Campaign comprises two permitted holes for a planned
400m of drilling.
•
Drilling designed to extend the mineralisation in the
Project’s north and establish a new horizon in the Project’s
south.
•
Campaign scheduled to be completed by early November,
with assay results expected by January 2025.
•
Astute in attendance at the inaugural Nevada Lithium
Summit, hosted by Nevada Governor Joe Lombardo.
•
Astute commences engagement with Federal and State
bodies to investigate potential funding opportunities for the
Red Mountain Mountain Lithium Project.
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to advise that it has
commenced its first-ever program of diamond drilling at the 100%-owned Red Mountain Lithium Project
in Nevada, USA. Since staking the Project in 2023, the Company has completed multiple surface
sampling campaigns, identifying widespread rock and soil lithium anomalism, and 11 Reverse
Circulation (RC) drill-holes, confirming a significant lithium discovery with every hole intersecting
mineralisation.
The current 2-hole, 400m diamond drilling campaign is designed to extend the mineralisation 375m
further north of the current northernmost drill intersections of clay-hosted lithium mineralisation, and to
test for a new horizon in the south of the project.
The holes are designed to enhance the Company’s geological interpretation of the lithium-clay bearing
stratigraphy in preparation for larger drill campaigns next field season to underpin an initial Mineral
Resource Estimate. The campaign is expected to be completed during November, with assays returned
to the Company by January 2025.
Astute Chairman, Tony Leibowitz, said:
“I am pleased to see this next phase of exploration drilling is underway at the Red Mountain Project.
One aspect of the Project that is difficult to comprehend from reading alone is the sheer scale of
the opportunity at Red Mountain. The technical team have traced lithium mineralisation in rock
samples and drilling over a 6.4km extent, and it has been confirmed in RC drilling in the bedrock
over 4.6km.
“The current phase of drilling is aiming to extend the mineralisation almost 400m further to the
north and potentially discover a new horizon in the south. If successful, it will reinforce the fact that
we have only just started to unlock the potential of this vast discovery for our shareholders.”
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Background
Located immediately adjacent to Route 6 near the township of Currant in central-eastern Nevada, the
Red Mountain Project was staked in August 2023. The Project area has broad mapped tertiary lacustrine
(lake) sedimentary rocks known locally as the Horse Camp Formation.
Elsewhere in the State of Nevada, equivalent rocks host large lithium deposits (see Figure 5) such as
Lithium Americas’ (NYSE: LAC) 16.1Mt LCE Thacker Pass Project 2, the American Battery Technology
Corporation’s (OTCMKTS: ABML) 16.9Mt LCE Tonopah Flats deposit3 and the American Lithium (TSX.V: LI)
10.7Mt LCE TLC Lithium Project4.
Astute has completed an 819-point soil sampling campaign and collected 118 rock chip samples at Red
Mountain. These programs have revealed widespread lithium anomalism in soils and confirmed lithium
mineralisation in bedrock with some exceptional grades of up to 4,150ppm Li1,6.
The Company’s maiden drill campaign at Red Mountain comprised 11 RC drill holes for 1,518m over a
4.6km strike length. This campaign was highly successful with5:
•
•
•
•
Strong lithium mineralisation intersected in every hole drilled;
Three holes intersecting lithium mineralisation starting from surface;
Three holes ending in mineralisation, indicating greater potential beyond the drilled extents;
Thick intersections included:
o RMRC004: 83.8m @ 1,230ppm Li from 16.8m
o RMRC001: 59.4m @ 1,300ppm Li from 73.2m
o RMRC005: 80.8m @ 1,270ppm Li from 56.4m
Other attractive Project characteristics include close proximity to infrastructure, with the Project being
immediately adjacent to the Grand Army of the Republic Highway (Route 6), which links the regional
cities of Ely with Tonopah.
Figure 1. True North diamond drill rig set up at site RMS024.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 2. Existing and planned drill-hole locations over gridded lithium soil geochemistry.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Planned Drilling
The drilling campaign, utilising a True North Drilling small footprint Torque Drill TD900D rig, comprises
two diamond drill holes for a combined 400m of drilling. The planned northern hole, RMS002, is designed
to test for lithium mineralisation 375m north of the intersections in holes RMRC002 and 003, and beneath
strong soil and rock-chip anomalies.
The planned southern hole, RMS024, is designed to test for an additional zone of mineralised
stratigraphy west of the intersection in hole RMRC008 (25.9m @ 1,120ppm Li from 73.2m).
This drilling campaign will enhance the Company’s geological interpretation of the Red Mountain
Project, which will allow for the design and permitting of drill sites for drilling in the next field season
(Q2-Q4 2025). It is envisaged that this next phase of drilling would comprise a larger number of both
Reverse Circulation (RC) and diamond drill holes, with a view to calculating a maiden Mineral Resource
Estimate (MRE) by the end of the 2025 calendar year.
Design
Plan ID
Easting
Northing
Dip
Azimuth
Depth
(NAD83)
(NAD83)
(°)
(°)
(m)
RMS024
637546
4286147
-50
270
200
RMS002
637186
4290569
-50
270
200
Table 1. Planned drill-hole details
Nevada Lithium Summit
Astute Executive Director and Chief Executive Officer, Matt Healy, recently represented the Company at
the inaugural Nevada Lithium Summit, hosted by Nevada Governor Joe Lombardo.
Nevada is unique in North America in having the only operating commercial lithium mine (Albemarle’s
Silver Peak brine operation), substantial lithium clay and brine Mineral Resources, and is home to Tesla’s
only gigafactory, which produces electric motors, energy storage products, vehicle powertrains and
batteries.
The Summit, held from 29-30th September, was attended by Federal, State and local government
officials, industry leaders, and technical professionals with the ultimate goal of facilitating Nevada as a
premier lithium miner, processor, battery producer and battery recycler.
Substantial Federal grant funding and loan program support is available to facilitate US critical metals
independence, which includes miners seeking to mine and process lithium ores. The Company has
engaged with Government representatives and Regional Development Authorities to investigate
funding opportunities open to Astute as it advances the Red Mountain Project.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 5. Location of Astute Lithium Projects and Nevada lithium deposits.
1 ASX: ASE 8 July 2024 ‘High-Grade Rock Chip Assays at Red Mountain Project’
2 NYSE: LAC 2 November 2022 Feasibility Study NI 43-101 Technical Report for the Thacker Pass Project
3 NASDAQ: ABAT Updated Resource Estimate and Initial Assessment… 21 December 2023..’
4 TSX.V: LI 17 March 2023 ‘Tonopah Lithium Claims project NI 43-101 technical report – Preliminary Economic Assessment’
5 ASX: ASE 7 August 2024 ‘Receipt of Final Assays for the Red Mountain Project’
6 ASX: ASE 20 November 2023 ‘Large Lithium Soil Anomalies Discovered at Red Mountain’
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Authorisation
This announcement has been authorised for release by the Board of Astute.
More Information
Matt Healy
Executive Director & CEO
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report is based on information compiled by Mr Matthew Healy, a Competent
Person who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM Member
number 303597). Mr Healy is a full-time employee of Astute Metals NL and is eligible to participate in a
Loan Funded Share incentive plan of the Company. Mr Healy has sufficient experience that is relevant
to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Healy consents to the
inclusion in the report of the matters based on his information in the form and context in which it
appears
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Share your feedback
Discover