Widest Lithium Mineralisation Intersected at Red Mountain
Released
Released
Announcement PDF
25 June 2025
WIDEST LITHIUM INTERSECTION TO DATE AT RED
MOUNTAIN PROJECT, USA
Broad, shallow intercept of 95m grading 1,340ppm Li
Key Highlights
•
•
Assay results received for RMDD007, including:
•
95m @ 1,340ppm Li from 54.9m;
•
5.4m @ 2,320ppm Li from 154m; and
•
24.3m @ 1,290ppm Li from 180.4m
Assay results also received for RMDD006, including:
•
31.8m @ 1,120ppm Li from 74.7m;
•
24.3m @ 1,040ppm Li from 7.6m; and
•
9.6m @ 1,040ppm from 57.5m
•
The 95m intercept returned in RMDD007 represents the
widest single intersection of lithium mineralisation to date
at Red Mountain
•
Additional rock chip sampling identifies un-tested zone of
lithium potential in the project’s east
•
Assays pending for two drill-holes
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report assay results for two
further holes from its April 2025 diamond drilling campaign at the 100%-owned Red Mountain Lithium
Project in Nevada, USA. Drill-holes RMDD007 and RMDD006 both returned multiple intersections of lithium
mineralisation, including the widest mineralised intercept returned from the project to date.
Highlights from the drilling included:
RMDD007:
•
•
•
95m @ 1,340ppm Li / 0.72% Lithium Carbonate Equivalent1 (LCE) from 54.9m:
5.4m @ 2,320ppm Li / 1.24% LCE from 154m; and
24.3m @ 1,290ppm Li / 0.68% LCE from 180.4m
RMDD006:
•
•
•
24.3m @ 1,040ppm Li / 0.55% LCE from 7.6m;
9.6m @ 1,040ppm Li / 0.55% LCE from 57.5m; and
31.8m @ 1,120ppm Li / 0.60% LCE from 74.7m
Drill-holes RMDD006 and RMDD007 were designed to test the main horizon of lithium-prospective
stratigraphy mid-project, with RMDD007 having the additional objective of acting as a ‘twin’ hole for the
previously drilled hole RMRC005. Both holes intersected multiple zones of lithium mineralisation, with
RMDD007 intersecting the widest zone of lithium mineralisation to date at the project.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
These results continue to strengthen the Company’s understanding of lithium mineralisation at Red
Mountain. Assays remain outstanding for two holes from the April campaign – RMDD004 and RMDD008
– which are expected to be returned to the Company during July.
Astute Chairman, Tony Leibowitz, said:
“The consistently high-grade nature of lithium intersections in Red Mountain drill holes demonstrates
the project is a standout compared to the majority of lithium clay projects in the US.
“The results from these latest two holes continue to affirm the Company’s interpretation of a strike
extensive and high-grade lithium deposit at Red Mountain returning broad mineralised intercepts
that will feed into our planned maiden Mineral Resource Estimate for Red Mountain later this year.”
Background
Located in central-eastern Nevada (Figure 5) adjacent to the Grand Army of the Republic Highway
(Route 6), which links the regional mining towns of Ely and Tonopah, the Red Mountain Project was staked
by Astute in August 2023.
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the
Horse Camp Formation2. Elsewhere in the state of Nevada, equivalent rocks host large lithium deposits
(see Figure 5) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3, American Battery
Technology Corporation’s (OTCMKTS: ABML) 15.8Mt LCE Tonopah Flats deposit 4 and American Lithium’s
(TSX.V: LI) 9.79Mt LCE TLC Lithium Project 5.
Astute has completed substantial surface sampling campaigns at Red Mountain, which indicate
widespread lithium anomalism in soils and confirmed lithium mineralisation in bedrock with some
exceptional grades of up to 4,150ppm Li2,8 (Figures 2 and 4).
A total of 13 RC and diamond drill holes have been drilled at the project for a combined 1,944m, prior to
this current drilling program. These campaigns were highly successful, intersecting strong lithium
mineralisation in every hole9.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration, and proof of concept
beneficiation test-work has indicated the potential to upgrade the Red Mountain mineralisation10,11.
Figure 1. RMDD007 interpretative cross-section, lithium geochemistry and (25-35m off-section) surface samples
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 2. Red Mountain drill-hole intersections, gridded soil geochemistry.
Results
Hole RMDD006 successfully intersected four zones of lithium mineralised rocks, hosted by clay-bearing
mudstone, sandstone and conglomerate.
The intersections are as follows:
24.3m @ 1,040ppm Li / 0.55% LCE from 7.6m
9.6m @ 1,040ppm Li / 0.55% LCE from 57.5m
31.8m @ 1,120ppm Li / 0.6% LCE from 74.7m
10.8m @ 770ppm Li / 0.41% LCE from 140.2m
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Hole RMDD007 successfully intersected five zones of lithium mineralised rocks, hosted by clay-bearing
mudstone, siltstone, claystone and marl. The rock types RMDD007 intersected comprised generally finergrained sedimentary rocks than in RMDD006, suggesting a coarsening sequence locally to the north.
The intersections in RMDD007 are as follows:
7.2m @ 805ppm Li / 0.43% LCE from 2.7m
24.3m @ 634ppm Li / 0.34% LCE from 13.8m
95m @ 1,340ppm Li / 0.72% LCE from 54.9m
5.4m @ 2,320ppm Li / 1.24% LCE from 154m
24.3m @ 1,290ppm Li / 0.68% LCE from 180.4m
A full table of assay results for RMDD006 and RMDD007 is provided in Appendix 2.
Interpretation
Lithium mineralisation intersected in RMDD006 (Figure 3) is interpreted as a continuation in strike of the
prospective stratigraphy northward from RMRC005/RMDD007, albeit at a lower average grade, due to a
coarsening of the rock types in the vicinity of RMDD006, which are less clay-rich as a result.
In contrast, the lithium mineralisation intersected in RMDD007 is thicker than average, resulting in the
widest intersection to date at the project – at 95m (Figure 1). A high-grade zone of 5.4m @ 2,320ppm Li
follows the 95m intersection, separated by a thin zone of unmineralised sandstone. A further 24.3m zone
of mineralisation was intersected in the hole, which is related to clay-rich sediments deposited atop a
limestone interval where the hole terminated. RMDD007 supports the broadening of prospective
stratigraphy mid project.
During the April drilling campaign, management took the opportunity to collect a further 74 rock chip
samples from locations in the central and northern parts of the main mineralised trend, and over a
prospective area to the east of the main trend. The results, plotted over mapped geology in Figure 4,
highlight a new emerging zone of lithium at surface, located approximately 500m southeast of RMRC004.
Further, the rock chip results also indicate a broadening of lithium-rich rocks mid-project, and an
apparent lower-grade zone between the middle and north of the Red Mountain Project.
A full table of rock chip assay results is provided in Appendix 3.
Easting
Northing
(NAD83)
(NAD83)
RMDD006
637341
4288618
RMDD007
637327
4288197
Hole ID
Dip
Azimuth
Depth
(°)
(°)
(m)
1716
-50
269
179.8
1705
-50
269
288.6
RL
Table 1. Drill-hole collar details
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 3. RMDD006 interpretative cross-section and lithium geochemistry.
Figure 4. Drill-hole locations and intersections, over interpreted geology and rock chip sample geochemistry.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Next Steps
The Company has finalised on-site core processing and the remaining two holes for the campaign have
been sampled and are with the laboratory awaiting preparation. Results for these two holes, RMDD004
and RMDD008, are expected in July. Once these results are received, the outcomes of the April drilling
campaign will be integrated with previous drilling results to inform the Company’s drilling plans for the
second half of 2025, with a view to completing a maiden Mineral Resource Estimate for the project by
the end of the calendar year.
About Lithium Carbonate Equivalent (LCE)
Unlike spodumene concentrate, which is a feedstock, lithium carbonate is a downstream product that
may be used directly in battery production or converted to other battery products such as lithium
hydroxide.
The Benchmark Mineral Intelligence Lithium Carbonate China Index priced lithium carbonate product at
US$8,359/t6 as of 19 June 2025.
Lithium carbonate is the product of many of the most advanced lithium clay projects around the world,
including Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project 3, which is currently under
construction. Accordingly, exploration results for Red Mountain have been reported as both the standard
parts-per-million (ppm) and as % Lithium Carbonate Equivalent (LCE) 1.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 5. Location of Astute Lithium Projects, and Nevada lithium deposits.
1 Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm) x 5.323 /10,000
2 ASX: ASE 27 November 2023 ‘Outstanding Rock-Chip Assays at Red Mountain Project’
3 NYSE: LAC 31 December 2024 Updated NI 43-101 Technical Report for the Thacker Pass Project
4 OTCMKTS: ABML 26 February 2023 ‘Technical Report Summary for The Tonopah Flats Lithium Project, Esmeralda.’
5 TSX.V: LI 17 March 2023 ‘Tonopah Lithium Claims project NI 43-101 technical report – Preliminary Economic Assessment’
6 Source: Benchmark Mineral Intelligence – Lithium Carbonate China Index 12/06/2024
7 ASX: ASE 16 December 2024 ‘Major new zones of Lithium Mineralisation at Red Mountain Project’
8 ASX: ASE 8 July 2024 ‘High-grade rock chip assays extend prospective lithium horizon at Red Mountain Project, USA’
9 ASX: ASE 20 January 2025 ‘Extension of lithium discovery at Red Mountain Project’
10 ASX: ASE 9 December 2024 ‘Positive initial metallurgical results from Red Mountain’
11 ASX: ASE 22 April 2025 ‘Beneficiation testwork successfully upgrades mineralisation at Red Mountain Lithium Project’
Authorisation
This announcement has been authorised for release by the Board of Astute.
Astute Metals NL Interactive Investor Hub
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Engage with Astute Metals through accessing reports, presentations, interviews and
other Company content.
Ask questions and browse responses to other investors’ questions
Click on https://astutemetals.com/auth/signup and follow the prompts to sign up
More Information
Matt Healy
Executive Director & CEO
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr. Healy is a full-time employee
of Astute Metals NL and is eligible to participate in a Loan Funded Share incentive plan of the Company.
Mr. Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Healy consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialisedindustry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheldXRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
HQ diamond drilling was undertaken for drill
sample collection. Samples were collected on
a nominal 5-foot basis or sampled to
geological boundaries based on lithological
logging. Samples were photographed, halfcored, and despatched to an external lab by
an external contractor.
Include reference to measures taken to
ensuresample representivity and the
appropriate calibration of any
measurement tools or systems used.
Rock chip samples of approx. 1kg were taken
from outcropping or shallowly subcropping
rocks using a geopick.
Aspects of the determination of
mineralisation thatare Material to the Public
Report.
Claystone hosted lithium deposits are thought to
form as a result of the weathering of
lithium-bearing volcanic glass within
tertiary-aged tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of lithium from
geothermal sources have also been proposed.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, suchas where there is
coarse gold that has inherentsampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openholehammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
HQ drilling methods employed. Core was not
oriented for this drill hole.
Drill sample
recovery
Method of recording and assessing core
andchip sample recoveries and results
assessed.
Sample recovery established by recovery
logging and dry sample weights undertaken
by independent laboratory prior to sample
preparation and analysis
Measures taken to maximise sample
recoveryand ensure representative nature
of the samples.
Logging
Poor drill core recovery at surface and one section
of core loss at end of hole.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gainof fine/coarse material.
Instances of poor recovery are not expected
tomaterially impact interpretation of results
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Drill core for the entire hole was logged for
lithology bycompany geologists
Whether logging is qualitative or quantitative
innature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the
relevantintersections logged.
Rock chips were logged for lithology
Logging is qualitative
Photography of drill core undertaken by
contractors in Elko, NV, prior to delivery to
external laboratory
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and
sample
preparatio
n
If core, whether cut or sawn and whether
quarter, half or all core taken.
Core half cored at a third part contractor
facility in Elko, NV, and submitted to ALS
Laboratories in Elko for preparation and
analysis.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness
of
the
sample
preparationtechnique.
Full rock chip samples were submitted to ALS
Laboratories in Elko.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the sampling
isrepresentative of the in-situ material
collected,including for instance results for field
duplicate/second-half sampling.
Quality of
assay
data and
laboratory
tests
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used
and whether the technique is considered
partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the parameters
used in determining the analysis including
instrument make and model, reading times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precisionhave been established.
Verification
of
sampling
and
assaying
A comparison of aqua-regia and 4-acid
digests was undertaken for Red Mountain
mineralisation, with no material difference in
lithium results identified.
Assay quality was monitored using pulp blanks,
as well as certified reference materials (CRMs)
at a range of lithium grades. Pulp blank results
indicated no material contamination of
samples from sample preparation or during the
analytical process. CRM results were within 3
standard deviations of certified values. No
material systematic bias nor other accuracy
related issues were identified.
The verification of significant intersections by
either independent or alternative company
personnel.
Sample intervals to be assigned a unique
sample identification number prior to sample
despatch
The use of twinned holes.
Lithium-mineralised claystone Certified
Reference Materials (standards), pulp
blanks and coarse blanks to be inserted into
the sample stream at regular intervals to
monitor lab accuracy and potential
contamination during sample prep and
analysis
Documentation of primary data, data
entry procedures, data verification, data
storage (physical
and
electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Drill Samples analysed by method ME-MS61
which is an ICP-MS method employing a 4acid digest. Rock samples were ME-MS41, a 2acid digest method.
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar and sample locations determined
using hand-held GPS with location reported in
NAD83 UTM Zone 11. Expected location accuracy
of +/- 10m
Downhole survey data yet to be validated.
For the purposes of drill sections, drill holes
have been plotted at the setup azimuth of
270° (Grid). This is not expected to make a
material difference to interpretation of
results.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing is appropriate for early exploration
purposes
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
MineralResource and Ore Reserve estimation
procedure(s) and classifications applied.
5-foot sample interval, or to geological
boundaries where appropriate, widely adopted
as standard practice in drilling in the USA.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
Claystone beds are regionally shallow-dipping at
~20°-45° to the east and varying locally across
the Project with some evidence of faulting and
potential folding
Sample
security
The measures taken to ensure sample security.
Samples stored at secure yard and shed located
in township of Currant until delivered by staff or
contractors to the core processing contractors at
Elko, and then to ALS lab at Elko, NV
Audits or
reviews
The results of any audits or reviews of
samplingtechniques and data.
Not applicable
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
Red Mountain Claims held in 100% Astute
subsidiary Needles Holdings Inc.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration
byother parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified by the
Bureau of Land Management (BLM)
No known previous lithium exploration
conducted at Red Mountain
Exploration conducted elsewhere in Nevada by
other explorers referenced in announcement
body text
The principal target deposit style is claystone
hosted lithium mineralisation. Claystone hosted
lithium deposits are thought to form as a result of
the weathering of lithium-bearing volcanic glass
within tertiary-aged tuffaceous lacustrine
sediments of the mapped Ts3 unit.
Lacustrine environments formed as a result of
extensional tectonic regime that produced ‘basin
and range’ topography observed across the
stateof Nevada. Inputs of lithium from
geothermal sources have also been proposed.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
◦ easting and northing of the drill hole collar
◦ elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
◦ dip and azimuth of the hole
◦ down hole length and interception depth
◦ hole length.
Drillhole locations, orientations and drilled
depths are tabulated in body report
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations should
be shownin detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Intersections, where quoted are weighted by
length. Lengths originally recorded in feet are
quoted to the nearest 10cm.
Rounding is conducted to 3 significant figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance for 10ft of
internal dilution by lower grade material.
Low grade mineralisation (300-500ppm Li) is
present outside of the quoted intersections
Intersections are quoted in both lithium ppm and
as wt% Lithium Carbonate Equivalent (LCE). LCE is
calculated as LCE = Li (ppm) x 5.323 / 10,000, as
per industry conventions.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
Insufficient information available due to early
exploration status, although interpretation to
date is that intersections in this hole
approximate true width.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
notknown’).
Diagrams
Appropriate maps and sections (with scales)
andtabulations of intercepts should be included
for any significant discovery being reported
These should include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Included in ASX announcement
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
This release describes all relevant information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysicalsurvey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
This release describes all relevant information
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions orlarge-scale step-out drilling).
Drill results demonstrate further work at the Red
Mountain project is warranted.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Rock chip results have identified a new zone of
lithium mineralisation requiring follow up.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 2 – Red Mountain Drilling
Sample Assay Table
Hole ID
From
(ft)
To (ft)
RMDD006
15.7
20
RMDD006
20
25
RMDD006
25
30.8
RMDD006
30.8
35
RMDD006
35
40
RMDD006
40
45
RMDD006
45
RMDD006
50
RMDD006
RMDD006
RMDD006
RMDD006
Li
(ppm)
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMDD006
225
230
488
0.26
RMDD006
230
235
593
0.32
RMDD006
235
240
271
0.14
RMDD006
240
245
243
0.13
0.34
RMDD006
245
250
712
0.38
0.16
RMDD006
250
255
797
0.42
837
0.45
RMDD006
255
259.4
525
0.28
1930
1.03
RMDD006
259.4
260.5
1675
0.89
2050
1.09
RMDD006
260.5
266
740
0.39
2010
1.07
RMDD006
266
271
1225
0.65
1485
0.79
RMDD006
271
276.2
1195
0.64
682
0.36
RMDD006
276.2
281
2030
1.08
75
1030
0.55
RMDD006
281
285.5
2290
1.22
79
113
0.06
RMDD006
285.5
289.2
654
0.35
83.6
1015
0.54
RMDD006
289.2
291.1
1285
0.68
88.2
1060
0.56
RMDD006
291.1
296
995
0.53
92
1675
0.89
RMDD006
296
300
2270
1.21
96
1085
0.58
RMDD006
300
304
2210
1.18
LCE (%)
Hole ID
413
0.22
491
0.26
962
0.51
509
0.27
644
295
50
54
54
57.5
57.5
61.4
61.4
65
65
70
RMDD006
70
RMDD006
75
RMDD006
79
RMDD006
83.6
RMDD006
88.2
RMDD006
92
RMDD006
96
100
796
0.42
RMDD006
304
308.2
1920
1.02
RMDD006
100
104.7
1185
0.63
RMDD006
308.2
312
172
0.09
RMDD006
104.7
110.7
431
0.23
RMDD006
312
316.5
222
0.12
RMDD006
110.7
115
125.5
0.07
RMDD006
316.5
320
1080
0.57
RMDD006
115
120
152.5
0.08
RMDD006
320
325
703
0.37
RMDD006
120
125
143
0.08
RMDD006
325
330
528
0.28
RMDD006
125
130
168.5
0.09
RMDD006
330
335
741
0.
Share your feedback
Discover