High-Grade Lithium Confirmed at Red Mountain North
Released
Released
Announcement PDF
ASX / Media Release
11 December 2025
Suite 116 Level 1, 165-167 Phillip St Sydney, NSW 2000
GPO Box 2733, Sydney NSW 2001
P. +61 (0) 2 8046 2799 | E. admin@venariminerals.com
venariminerals.com
Drill assays confirm high-grade mineralisation in northern area at
Red Mountain Lithium Project, Nevada
Highlights
• First assay results received from the northern area of Red Mountain from the October 2025
drilling campaign.
• Drill-hole RMRC014 (twin of RMDD002) intersected 89.9m @ 1,380ppm Li, including:
o 18.3m @ 2,530ppm Li from 44.2m; and
o 18.3m @ 1,420ppm Li from 67.1m.
• Results are consistent with diamond hole RMDD002, which intersected 86.9m @ 1,470ppm Li
from 18.3m, providing confidence in the representative nature of Reverse Circulation (RC)
sampling methods employed at the Project.
• Drill-hole RMRC015 intersected a combined 91.4m of lithium mineralisation (combined
estimated true width ‘ETW’ of 75m), including:
o 27.4m (ETW 23.4m) @ 2,160ppm Li from 57.9m, including
▪ 6.1m (ETW 5.2m) @ 3,550ppm Li from 73.2m; and
o 6.1m (ETW 4.7m) @ 1,290ppm Li from 111.3m
• Results add to previous high-grade intersections in the Project’s north.
• Assay results remain outstanding for four holes, expected in the coming fortnight. These assays
represent the final inputs for a maiden Mineral Resource Estimate for the Red Mountain Project.
Venari Minerals NL (ASX: VMS) (“Venari”, “the Company” or “VMS”) is pleased to report assay results
for a further three holes of the 13-hole Reverse Circulation (RC) drilling campaign completed at the
100%-owned Red Mountain Lithium Project in Nevada, USA, in October 2025.
The latest assays, from holes in the northern project area, reveal a similar high tenor of mineralisation
as previous holes drilled in the area, with a number of high-grade zones grading in excess of 2,000ppm
Li, within broader zones of mineralisation with widths between 41.1m and 89.9m (Figure 1).
Drill-hole RMRC014, drilled as a twin hole of RMDD002, intersected comparable mineralisation width
and grades, providing confidence in the representative nature of the RC sampling method as the
Company advances the project towards its maiden Mineral Resource Estimate (MRE). Assays for the
remaining four holes from the campaign are expected in the coming fortnight.
Venari Chairman, Tony Leibowitz, said:
“Assays from the October drilling campaign at Red Mountain are continuing to deliver outstanding
results, with this latest batch confirming the presence of high-grade lithium mineralisation in the
northern part of the project area.
2
newmurchgold.com.a
“We are continuing to see very broad mineralised intercepts – with one of the holes returning almost 90
metres of continuous lithium mineralisation – including internal high-grade zones.
“These results bode well for the forthcoming delivery of a maiden Mineral Resource for Red Mountain,
which will mark a significant milestone for the Company.
“Final assays from the October drilling are expected within the next two weeks, after which the
Company can progress the maiden Resource Estimate.”
Results
Intersections for the latest drill-hole results are as follows:
Hole RMRC014
• 89.9m @ 1,380ppm Li / 0.75% Lithium Carbonate Equivalent10
(LCE) from 15.2m, including:
o 18.3m @ 2,530ppm Li / 1.35% LCE from 44.2m; and
o 18.3m @ 1,420ppm Li / 0.76% LCE from 67.1m.
Hole RMRC015
• 50.3m (estimated true width ‘ETW’ 43m) @ 1,630ppm Li / 0.87% LCE from 39.6m, including:
o 27.4m (ETW 23.4m) @ 2,160ppm Li / 1.15% LCE from 57.9m, including:
▪ 6.1m (ETW 5.2m) @ 3,550ppm Li / 1.89% LCE from 73.2m
• 41.1m downhole (ETW 32m) @ 861ppm Li / 0.46% LCE from 94.5m, including:
o 6.1m (ETW 4.7m) @ 1,290ppm Li / 0.69% LCE from 111.3m; and
o 10.7m (ETW 8.3m) @ 1,180ppm Li / 0.63% LCE from 125m.
Figure 1. RMRC014-015 preliminary interpretative cross-section with down-hole lithium geochemistry.
Hole RMRC012
Drill-hole RMRC012 (Figure 2) intersected no significant lithium mineralisation, which is interpreted to
represent a pinching out of the lithium bearing lens intersected in holes RMRC014, RMRC015 and
RMDD003, amongst other holes, to the far north of the project.
3
newmurchgold.com.a
Figure 2. Red Mountain north and central (down-hole) drill intersections over gridded soil geochemistry image.
Background
Located in central-eastern Nevada (Figure 3), adjacent to the Grand Army of the Republic Highway (Route
6), the Red Mountain Project was staked by Venari in August 2023.
4
newmurchgold.com.a
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the Horse
Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium deposits (see Figure 3) such as
Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3
and American Battery Technology
Corporation’s (NASDAQ: ABAT) 15.8Mt LCE Tonopah Flats deposit4
.
Prior to the current campaign, a total of 19 drill holes had been completed at the project to date for a
combined 3,336m of drilling across three campaigns. These campaigns have been highly successful,
intersecting strong lithium mineralisation in almost every hole6
.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration5
, and beneficiation test-
work has indicated the potential to upgrade the Red Mountain mineralisation1,2,7
.
Figure 3. Location of Red Mountain and other Nevada Lithium projects.
5
newmurchgold.com.a
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMRC012 637010.3 4291916.6 1705.5 266.5 -50 152.4
RMRC014 637192.5 4290568.7 1710.1 270.5 -50 121.9
RMRC015 637183.1 4290570.6 1709.9 90.5 -75 182.9
Table 1. Drill collar details
References
1 – ASX: ASE, 22 April 2025, Beneficiation testwork successfully upgrades mineralisation at Red Mountain
2 - ASX: ASE, 10 June 2025, Beneficiation Delivers 4,480ppm Lithium Clay Concentrate at Red Mountain
3 - NYSE: LAC, 31 December 2024, Updated NI 43-101 Technical Report for the Thacker Pass Project
4 - OTCMKTS: ABML, 26 February 2023, Technical Report Summary for The Tonopah Flats Lithium Project, Esmeralda
5 - ASX: ASE, 9 December 2024, Positive initial metallurgical results from Red Mountain
6 - ASX: ASE, 25 June 2025, Exceptional Drill-hole Intersects combined 170m of Lithium Mineralisation at Red Mountain
7 - ASX: ASE, 3 September 2025, Outstanding lithium anomalism in surface sampling at Red Mountain Extension
8 – ASX: VMS, 15 October 2025, Metallurgical test-work delivers 132% upgrade to lithium mineralisation at Red Mountain, Nevada
9 – ASX: VMS, 17 November 2025, Initial Red Mountain Assays confirm High-grade Lithium
10 – Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm)
x 5.323 /10,000
Authorisation
This announcement has been authorised for release by the Board of Venari Minerals NL.
Join the Venari Minerals Investor Hub
Engage with Venari Minerals through accessing reports, presentations, interviews
and other Company content. Ask Questions and browse responses to other
investors’ questions. Click here and follow the prompts to sign up.
For further information, please contact:
Matthew Healy Nicholas Read
Executive Director & CEO Media & Investor Relations
T: +61 (0) 431 683 952 T: +61 (0) 419 929 046
E: matt@venariminerals.com E: nicholas@readcorporate.com.au
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a full-time employee
of Venari Minerals NL and is eligible to participate in share-based incentive schemes of the Company.
Mr Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
6
newmurchgold.com.a
and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
7
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
5.5” reverse circulation drilling was
undertaken for drill sample
collection. Samples were collected
on a 5-foot basis in calico bags,
with approximate 30% split
retained from a rotary cone splitter
for lab assay. Water was injected
throughout the hole.
Nominal small drill sample was
collected for chip tray records
Samples were air dried on elevated
grid mesh until practical to
transport
Claystone hosted lithium deposits
are thought to form as a result of
the weathering of lithium-bearing
volcanic glass within tertiary-aged
tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of
lithium from geothermal sources
have also been proposed.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
5.5” Reverse Circulation drilling
methods employed using a cross-
over sub immediately behind the
hammer.
8
newmurchgold.com.a
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries
and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Sample recoveries to be measured by
dry sample weight at the laboratory
prior to assay.
Some instances of poor recovery
noted.
Instances of poor recovery are not
expected to materially impact
interpretation of results
Logging Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of
the relevant intersections logged.
Drill cuttings of entire hole logged
for lithology by consultant
geologist
Logging is qualitative with selective
quantitative logging (e.g. quartz
veining)
Chip tray photography undertaken
on all full drill holes
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the
sampling isrepresentative of the in-situ
material collected,including for instance
results for field duplicate/second-half
sampling.
Samples 30% split using a rotary cone
splitter and submitted to ALS
Laboratories in Reno for preparation
and analysis.
9
newmurchgold.com.a
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to
thegrain size of thematerial being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used andwhether the technique is
considered partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and theirderivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
Samples analysed by method ME-
MS61 which is an ICP-MS method
employing a 4-acid digest.
A comparison of aqua-regia and 4-
acid digests was undertaken for Red
Mountain mineralisation, with no
material difference in lithium results
identified.
Assay quality was monitored using
pulp blanks, as well as certified
reference materials (CRMs) at a range
of lithium grades. Pulp blank results
indicated no material contamination
of samples from sample preparation
or during the analytical process. CRM
results were within 3 standard
deviations of certified values. No
material systematic bias nor other
accuracy related issues were
identified.
Verification
of sampling
and
assaying
The verification of significant intersections
byeither independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entryprocedures, data verification, data
storage(physical and electronic)
protocols.
Discuss any adjustment to assay data.
Sample intervals assigned a unique
sample identification number
prior to sample despatch
Lithium-mineralised claystone
Certified Reference Materials
(standards), pulp blanks and coarse
blanks inserted into the sample
stream at regular intervals to monitor
lab accuracy and potential
contamination during sample prep
and analysis.
Location of
data points
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar locations determined using
hand held GPS with location reported
in NAD83 UTM Zone 11 with expected
accuracy of +/- 10m
Downhole surveys conducted on drill
holes at nominal 100ft intervals, with
drill rigs lined up by compass and
clino at start of hole.
10
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria JORC Code explanation Commentary
Data
spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Drill spacing appropriate for early
stage exploration
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Claystone beds are regionally
shallow-dipping at ~20°-45° to the
east and varying locally across the
Project with some evidence of faulting
and potential folding. Most holes are
drilled approximately perpendicular
to bedding, with some having a down-
dip component due to drill pad
location and allowable disturbance
limitations. These holes have
estimated true width intersections
included in the body release as well
as down hole intersections.
Sample
security
The measures taken to ensure sample
security.
Samples stored at secured yard and
shed located in township of Currant
until delivered by staff or contractors to
the ALS labs
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Not applicable
11
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Red Mountain Claims held in 100%
subsidiary Needles Holdings Inc.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified
by the Bureau of Land Management
(BLM)
Exploration
done by
other parties
Acknowledgment and appraisal of
exploration by other parties.
No known previous lithium exploration
conducted at Red Mountain.
Exploration conducted elsewhere in
Nevada by other explorers referenced in
body text.
Geology Deposit type, geological setting and style
of mineralisation.
The principal target deposit style is
claystone hosted lithium
mineralisation. Claystone hosted
lithium deposits are thought to form as
a result of the weathering of lithium-
bearing volcanic glass within tertiary-
aged tuffaceous lacustrine sediments
of the mapped Ts3 unit.
Lacustrine environments formed as a
result of extensional tectonic regime
that produced ‘basin and range’
topography observed across the state
of Nevada. Inputs of lithium from
geothermal sources have also been
proposed.
12
newmurchgold.com.a
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
• easting and northing of the drill
hole collar
• elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception
depth
• hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Drill hole information is tabulated in
body text and/or shown in relevant
maps.
Data
Aggregation
Methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated
Intersections, where quoted are
weighted by length. Lengths originally
recorded in feet are quoted to the
nearest 10cm.
Estimates of ‘true width’ intersections
given where drilling is interpreted to
have a significant down-dip component.
Rounding is conducted to 3 significant
figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance
for 10ft of internal dilution by lower
grade material.
Low grade mineralisation (300-500ppm
Li) is present outside of the quoted
intersections
Intersections are quoted in both lithium
ppm and as wt% Lithium Carbonate
Equivalent (LCE). LCE is calculated as
LCE = Li (ppm) x 5.323 / 10,000, as per
industry conventions
13
newmurchgold.com.a
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Insufficient information available due to
early exploration status, although
interpretation to date is that
intersections in this hole approximate
true width unless otherwise indicated.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Included in ASX announcement.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
This release describes all relevant
information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
This release describes all relevant
information
Further work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
The Red Mountain lithium project is
emerging as a significant lithium
discovery in Nevada and is being
advanced toward a maiden Mineral
Resource Estimate later this year. It is
the Company’s intent to advance the
project beyond this to technical
studies.
14
newmurchgold.com.a
APPENDIX 2 – Red Mountain Drilling Sample Assay Table
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC014 0 5 No sample RMRC014 210 215 716 0.38
RMRC014 5 10 42.8 0.02 RMRC014 215 220 920 0.49
RMRC014 10 15 77.3 0.04 RMRC014 220 225 1195 0.64
RMRC014 15 20 163 0.09 RMRC014 225 230 1965 1.05
RMRC014 20 25 247 0.13 RMRC014 230 235 1000 0.53
RMRC014 25 30 228 0.12 RMRC014 235 240 335 0.18
RMRC014 30 35 205 0.11 RMRC014 240 245 873 0.46
RMRC014 35 40 76.5 0.04 RMRC014 245 250 1375 0.73
RMRC014 40 45 342 0.18 RMRC014 250 255 1890 1.01
RMRC014 45 50 408 0.22 RMRC014 255 260 1320 0.70
RMRC014 50 55 654 0.35 RMRC014 260 265 1205 0.64
RMRC014 55 60 1100 0.59 RMRC014 265 270 1485 0.79
RMRC014 60 65 1055 0.56 RMRC014 270 275 1835 0.98
RMRC014 65 70 921 0.49 RMRC014 275 280 2600 1.38
RMRC014 70 75 1890 1.01 RMRC014 280 285 542 0.29
RMRC014 75 80 1135 0.60 RMRC014 285 290 547 0.29
RMRC014 80 85 508 0.27 RMRC014 290 295 797 0.42
RMRC014 85 90 822 0.44 RMRC014 295 300 706 0.38
RMRC014 90 95 783 0.42 RMRC014 300 305 1105 0.59
RMRC014 95 100 316 0.17 RMRC014 305 310 963 0.51
RMRC014 100 105 1005 0.53 RMRC014 310 315 1000 0.53
RMRC014 105 110 1780 0.95 RMRC014 315 320 1140 0.61
RMRC014 110 115 2280 1.21 RMRC014 320 325 997 0.53
RMRC014 115 120 1195 0.64 RMRC014 325 330 824 0.44
RMRC014 120 125 924 0.49 RMRC014 330 335 1230 0.65
RMRC014 125 130 1020 0.54 RMRC014 335 340 1320 0.70
RMRC014 130 135 1510 0.80 RMRC014 340 345 534 0.28
RMRC014 135 140 839 0.45 RMRC014 345 350 414 0.22
RMRC014 140 145 490 0.26 RMRC014 350 355 323 0.17
RMRC014 145 150 1685 0.90 RMRC014 355 360 418 0.22
RMRC014 150 155 2670 1.42 RMRC014 360 365 349 0.19
RMRC014 155 160 2860 1.52 RMRC014 365 370 241 0.13
RMRC014 160 165 2760 1.47 RMRC014 370 375 190 0.10
RMRC014 165 170 2320 1.23 RMRC014 375 380 244 0.13
RMRC014 170 175 2700 1.44 RMRC014 380 385 239 0.13
RMRC014 175 180 2240 1.19 RMRC014 385 390 159 0.08
RMRC014 180 185 1985 1.06 RMRC014 390 395 184.5 0.10
RMRC014 185 190 2580 1.37 RMRC014 395 400 125.5 0.07
RMRC014 190 195 3100 1.65 RMRC015 0 5 33.9 0.02
RMRC014 195 200 3660 1.95 RMRC015 5 10 33.2 0.02
RMRC014 200 205 1830 0.97 RMRC015 10 15 237 0.13
RMRC014 205 210 403 0.21 RMRC015 15 20 268 0.14
15
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC015 20 25 104.5 0.06 RMRC015 230 235 2350 1.25
RMRC015 25 30 162 0.09 RMRC015 235 240 1745 0.93
RMRC015 30 35 174.5 0.09 RMRC015 240 245 3410 1.82
RMRC015 35 40 172 0.09 RMRC015 245 250 3400 1.81
RMRC015 40 45 156.5 0.08 RMRC015 250 255 4040 2.15
RMRC015 45 50 192 0.10 RMRC015 255 260 3340 1.78
RMRC015 50 55 723 0.38 RMRC015 260 265 978 0.52
RMRC015 55 60 414 0.22 RMRC015 265 270 1045 0.56
RMRC015 60 65 118.5 0.06 RMRC015 270 275 2460 1.31
RMRC015 65 70 102.5 0.05 RMRC015 275 280 1030 0.55
RMRC015 70 75 199.5 0.11 RMRC015 280 285 662 0.35
RMRC015 75 80 262 0.14 RMRC015 285 290 551 0.29
RMRC015 80 85 294 0.16 RMRC015 290 295 533 0.28
RMRC015 85 90 231 0.12 RMRC015 295 300 273 0.15
RMRC015 90 95 190.5 0.10 RMRC015 300 305 288 0.15
RMRC015 95 100 178.5 0.10 RMRC015 305 310 420 0.22
RMRC015 100 105 491 0.26 RMRC015 310 315 569 0.30
RMRC015 105 110 385 0.20 RMRC015 315 320 571 0.30
RMRC015 110 115 609 0.32 RMRC015 320 325 857 0.46
RMRC015 115 120 334 0.18 RMRC015 325 330 579 0.31
RMRC015 120 125 173.5 0.09 RMRC015 330 335 732 0.39
RMRC015 125 130 225 0.12 RMRC015 335 340 326 0.17
RMRC015 130 135 877 0.47 RMRC015 340 345 341 0.18
RMRC015 135 140 1055 0.56 RMRC015 345 350 590 0.31
RMRC015 140 145 1050 0.56 RMRC015 350 355 834 0.44
RMRC015 145 150 804 0.43 RMRC015 355 360 90.8 0.05
RMRC015 150 155 1445 0.77 RMRC015 360 365 360 0.19
RMRC015 155 160 1100 0.59 RMRC015 365 370 1545 0.82
RMRC015 160 165 2360 1.26 RMRC015 370 375 1175 0.63
RMRC015 165 170 1905 1.01 RMRC015 375 380 1040 0.55
RMRC015 170 175 548 0.29 RMRC015 380 385 1395 0.74
RMRC015 175 180 655 0.35 RMRC015 385 390 861 0.46
RMRC015 180 185 821 0.44 RMRC015 390 395 805 0.43
RMRC015 185 190 551 0.29 RMRC015 395 400 919 0.49
RMRC015 190 195 2020 1.08 RMRC015 400 405 644 0.34
RMRC015 195 200 2300 1.22 RMRC015 405 410 765 0.41
RMRC015 200 205 1965 1.05 RMRC015 410 415 1135 0.60
RMRC015 205 210 1145 0.61 RMRC015 415 420 1105 0.59
RMRC015 210 215 1935 1.03 RMRC015 420 425 707 0.38
RMRC015 215 220 2160 1.15 RMRC015 425 430 1250 0.67
RMRC015 220 225 1260 0.67 RMRC015 430 435 1410 0.75
RMRC015 225 230 2360 1.26 RMRC015 435 440 1435 0.76
16
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC015 440 445 1200 0.64 RMRC012 50 55 36.2 0.02
RMRC015 445 450 460 0.24 RMRC012 55 60 36.5 0.02
RMRC015 450 455 345 0.18 RMRC012 60 65 30.4 0.02
RMRC015 455 460 361 0.19 RMRC012 65 70 35.5 0.02
RMRC015 460 465 497 0.26 RMRC012 70 75 32.3 0.02
RMRC015 465 470 692 0.37 RMRC012 75 80 29.6 0.02
RMRC015 470 475 527 0.28 RMRC012 80 85 25.7 0.01
RMRC015 475 480 314 0.17 RMRC012 85 90 29.4 0.02
RMRC015 480 485 265 0.14 RMRC012 90 95 34.2 0.02
RMRC015 485 490 299 0.16 RMRC012 95 100 39.4 0.02
RMRC015 490 495 177.5 0.09 RMRC012 100 105 38.7 0.02
RMRC015 495 500 159.5 0.08 RMRC012 105 110 60.1 0.03
RMRC015 500 505 350 0.19 RMRC012 110 115 74.4 0.04
RMRC015 505 510 279 0.15 RMRC012 115 120 37.8 0.02
RMRC015 510 515 269 0.14 RMRC012 120 125 36 0.02
RMRC015 515 520 210 0.11 RMRC012 125 130 44.6 0.02
RMRC015 520 525 286 0.15 RMRC012 130 135 55.2 0.03
RMRC015 525 530 189.5 0.10 RMRC012 135 140 77.9 0.04
RMRC015 530 535 98.8 0.05 RMRC012 140 145 93.1 0.05
RMRC015 535 540 123 0.07 RMRC012 145 150 97.1 0.05
RMRC015 540 545 147 0.08 RMRC012 150 155 72.6 0.04
RMRC015 545 550 235 0.13 RMRC012 155 160 85 0.05
RMRC015 550 555 166.5 0.09 RMRC012 160 165 98.2 0.05
RMRC015 555 560 141 0.08 RMRC012 165 170 113 0.06
RMRC015 560 565 164.5 0.09 RMRC012 170 175 160.5 0.09
RMRC015 565 570 69.6 0.04 RMRC012 175 180 116.5 0.06
RMRC015 570 575 133.5 0.07 RMRC012 180 185 86.8 0.05
RMRC015 575 580 302 0.16 RMRC012 185 190 112 0.06
RMRC015 580 585 1315 0.70 RMRC012 190 195 134 0.07
RMRC015 585 590 516 0.27 RMRC012 195 200 115 0.06
RMRC015 590 595 381 0.20 RMRC012 200 205 93.6 0.05
RMRC015 595 600 285 0.15 RMRC012 205 210 76.3 0.04
RMRC012 0 5 28.7 0.02 RMRC012 210 215 81.8 0.04
RMRC012 5 10 45 0.02 RMRC012 215 220 115 0.06
RMRC012 10 15 42.9 0.02 RMRC012 220 225 49.7 0.03
RMRC012 15 20 52.7 0.03 RMRC012 225 230 51.7 0.03
RMRC012 20 25 36.7 0.02 RMRC012 230 235 51.3 0.03
RMRC012 25 30 38.6 0.02 RMRC012 235 240 36.1 0.02
RMRC012 30 35 36 0.02 RMRC012 240 245 20.3 0.01
RMRC012 35 40 37.6 0.02 RMRC012 245 250 30.4 0.02
RMRC012 40 45 30.4 0.02 RMRC012 250 255 30.2 0.02
RMRC012 45 50 38.5 0.02 RMRC012 255 260 66 0.04
17
newmurchgold.com.a
Hole ID
From
(ft)
To (f
Share your feedback
Discover