Final Assays Progress Red Mountain Toward Maiden Resource
Released
Released
Announcement PDF
25 July 2025
EXCEPTIONAL DRILL-HOLE INTERSECTS COMBINED
170m OF LITHIUM MINERALISATION AT RED MOUNTAIN
Highly successful drilling campaign brings project closer to a maiden resource
Key Highlights
•
•
•
RMDD008 intersected a total of 170.4m of mineralisation
across six zones of lithium, including:
•
62.4m @ 1,210ppm Li from 152.2m, including:
•
27m @ 1,420ppm Li from 176.7m
•
33.8m @ 1,130ppm Li from 34.8m, including:
•
10.7m @ 1,320ppm Li from 41.5m
•
Four other low-grade zones of lithium mineralisation
Result confirms wide zones of lithium mineralisation in
the south of the project, adding to a number of successful
intersections from the April drilling campaign, such as:
•
32.4m @ 3,260ppm Li from 57.2m, including 8.6m @
5,060ppm Li from 67.7m (RMDD003);
•
13.8m @ 1,330ppm Li from 39.6m; and 23.3m @
1,610ppm Li from 94.4m to end-of-hole (RMDD003)
•
95m @ 1,344ppm Li from 54.9m (RMDD007)
•
9.1m @ 1,350ppm Li from 57.9m, within a broader lowgrade zone of 80.8m @ 860ppm Li from 12.2m
(RMDD005)
Next steps are to design and execute a drilling campaign
to support a maiden Mineral Resource Estimate (MRE) by
the end of CY2025 with a focus on the northern and other
high-grade parts of the project.
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report the final batch of
assay results for the final two holes of its April 2025 diamond drilling campaign at the 100%-owned Red
Mountain Lithium Project in Nevada, USA.
Hole RMDD008 returned six intersections of lithium mineralisation in clay-bearing mudstones siltstones
and sandstones, for a combined 170.4m of lithium mineralisation, including:
•
33.8m @ 1,130ppm Li / 0.60% Lithium Carbonate Equivalent1 (LCE) from 34.8m including an
internal high-grade zone of 10.7m @ 1,320ppm Li / 0.70% LCE from 41.5m; and
•
62.4m @ 1,210ppm Li / 0.64% LCE from 152.2m including an internal high-grade zone of
27.5m @ 1,421ppm Li / 0.76% LCE from 176.7m.
Drill-hole RMDD004 drilled through a sequence of sub-aerial coarse polymictic conglomerate to breccia,
with occasional narrow zones of claystone with low lithium content. This conglomerate is interpreted to
be a localised alluvial fan, as lithium-bearing claystone is present at surface up-dip from the drill-hole
(Figure 3).
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
These results complete the assay dataset for the April diamond drilling campaign at Red Mountain. This
most recent drilling has been highly successful, delivering both the highest-grade (RMDD00312) and the
widest (RMDD00713) lithium intersections at the project to date, extending the known mineralisation 630m
north of the previous northernmost intersection (RMDD00312) and to depths of >180 metres below surface
(RMDD00514), as well as proving up lithium mineralisation in the south of the project (RMDD008).
The Company is in the process of designing the next round of drilling at Red Mountain, which will feed
into a maiden Mineral Resource Estimate for the project, planned for delivery by the end of CY2025.
Astute Chairman, Tony Leibowitz, said:
“This is a great way to finish what has been a highly successful drilling campaign, with hole RMD008
intersecting more than 170m of lithium mineralisation. The consistent high-grade intercepts seen in
the Red Mountain drill-holes reinforce the Project as a standout compared to the majority of lithium
clay projects in the USA.
“The drilling so far has delineated a sizeable body of clay-hosted lithium mineralisation over an
extensive strike length of 5.6km and extending to depths of 180m, with multiple broad, high-grade
intercepts. These results will feed into our planned maiden Mineral Resource Estimate for Red
Mountain later this year.”
Background
Located in central-eastern Nevada (Figure 4) adjacent to the Grand Army of the Republic Highway
(Route 6), which links the regional mining towns of Ely and Tonopah, the Red Mountain Project was staked
by Astute in August 2023.
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the
Horse Camp Formation2. Elsewhere in the state of Nevada, equivalent rocks host large lithium deposits
(see Figure 5) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3, American Battery
Technology Corporation’s (OTCMKTS: ABML) 15.8Mt LCE Tonopah Flats deposit 4 and American Lithium’s
(TSX.V: LI) 9.79Mt LCE TLC Lithium Project 5.
Astute has completed substantial surface sampling campaigns at Red Mountain, which indicate
widespread lithium anomalism in soils and confirmed lithium mineralisation in bedrock with some
exceptional grades of up to 4,150ppm Li 2,8 (Figure 2). A total of 11 RC and eight diamond drill holes have
been completed at the project for a combined 3,336m, including the April drilling campaign. These
campaigns were highly successful, intersecting strong lithium mineralisation in almost every hole.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration, and proof of concept
beneficiation test-work has indicated the potential to upgrade the Red Mountain mineralisation10,11.
Figure 1. RMDD008 interpretative cross-section, lithium geochemistry and surface samples.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 2. Red Mountain drill-hole intersections, gridded soil geochemistry.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Results
Hole RMDD008 successfully intersected six zones of lithium mineralised rocks, hosted by clay-bearing
mudstone, sandstone and conglomerate.
The intersections are as follows:
13.1m @ 970ppm Li / 0.52% LCE from 6.7m
33.8m @ 1,130ppm Li / 0.6% LCE from 34.8m,
Including 10.7m @ 1,320ppm Li / 0.7% LCE from 41.5m
and 4.6m @ 1,540ppm Li / 0.82% LCE from 56.3m
39.7m @ 859ppm Li / 0.46% LCE from 102.1m
62.4m @ 1,210ppm Li / 0.64% LCE from 152.2m
Including 27.5m @ 1,420ppm Li / 0.76% LCE from 176.7m
13.8m @ 995ppm Li / 0.53% LCE from 224m
7.6m @ 945ppm Li / 0.50% LCE from 242.3m
Hole RMDD004 drilled through a thick sequence of coarse polymictic conglomerate to breccia, with
occasional zones of claystone, but did not return any significant lithium assays.
A full table of assay results for RMDD008 and RMDD004 is provided in Appendix 2.
Interpretation
The lithium mineralisation intersected in RMDD008 (Figure 1) is interpreted to be a strike extension of the
prospective stratigraphy northward from RMRC001, RMRC009, RMRC008 and RMDD001.
The conglomerate intersected in hole RMDD004 is interpreted to be a localised sub-aerial alluvial fan.
The conglomerate is interpreted to grade rapidly from conglomerate through sandstone to finer
sediments up-dip, to where lithium-bearing claystone is present at surface with nearby surface sample
assays of up to 2,640ppm Li (Figure 3).
Further drilling is planned for this area to more effectively test the extent of lithium-mineralised clays and
constrain the limits of the unmineralised conglomerate.
Easting
Northing
(NAD83)
(NAD83)
RMDD004
637593
4289988
RMDD008
637516
4286902
Hole ID
Dip
Azimuth
Depth
(°)
(°)
(m)
1738
-50
269
306.3
1731
-50
269
249.9
RL
Table 1. Drill-hole collar details
Figure 3. RMDD004 interpretative cross-section, lithium geochemistry and nearby (+/- 150m off section) rock chip samples.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
April Drill Campaign Summary
The six-hole April drilling campaign was designed to test extensions to the previously defined lithium
mineralisation along strike, at depth and under alluvial cover. The campaign achieved each of these
objectives, which met with or exceeded expectations based on the previous drilling at the project.
These most recent results support that the Red Mountain project has potential to be one of the highestgrade lithium projects in the US. In order to advance the project to a maiden Mineral Resource Estimate,
further drilling is required, and the results to date clearly warrant this next phase of work.
Next Steps
The results of the April diamond drilling campaign, in conjunction with previous drilling results from Red
Mountain, justify further drilling to support the calculation of a maiden Mineral Resource Estimate (MRE)
for the Project. The Company’s technical team is currently in the process of designing holes to be drilled
in Q3-Q4, with a priority focus on the northern end and other high-grade parts of the project.
The Company aims to complete a maiden MRE for the Project by the end of the 2025 calendar year.
Figure 4. Location of Astute Lithium Projects, and Nevada lithium deposits.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
About Lithium Carbonate Equivalent (LCE)
Unlike spodumene concentrate, which is a feedstock, lithium carbonate is a downstream product that
may be used directly in battery production or converted to other battery products such as lithium
hydroxide.
The Benchmark Mineral Intelligence Lithium Carbonate China Index priced lithium carbonate product at
US$8,651/t6 as of 10 July 2025.
Lithium carbonate is the product of many of the most advanced lithium clay projects around the world,
including Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project 3, which is currently under
construction. Accordingly, exploration results for Red Mountain have been reported as both the standard
parts-per-million (ppm) and as % Lithium Carbonate Equivalent (LCE) 1.
1 Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm) x 5.323 /10,000
2 ASX: ASE 27 November 2023 ‘Outstanding Rock-Chip Assays at Red Mountain Project’
3 NYSE: LAC 31 December 2024 Updated NI 43-101 Technical Report for the Thacker Pass Project
4 OTCMKTS: ABML 26 February 2023 ‘Technical Report Summary for The Tonopah Flats Lithium Project, Esmeralda.’
5 TSX.V: LI 17 March 2023 ‘Tonopah Lithium Claims project NI 43-101 technical report – Preliminary Economic Assessment’
6 Source: Benchmark Mineral Intelligence – Lithium Carbonate China Index 12/06/2024
7 ASX: ASE 16 December 2024 ‘Major new zones of Lithium Mineralisation at Red Mountain Project’
8 ASX: ASE 8 July 2024 ‘High-grade rock chip assays extend prospective lithium horizon at Red Mountain Project, USA’
9 ASX: ASE 20 January 2025 ‘Extension of lithium discovery at Red Mountain Project’
10 ASX: ASE 9 December 2024 ‘Positive initial metallurgical results from Red Mountain’
11 ASX: ASE 22 April 2025 ‘Beneficiation testwork successfully upgrades mineralisation at Red Mountain Lithium Project’
12 ASX: ASE 19 May 2025 ‘Exceptional lithium intercept extends Red Mountain Discovery’
13 ASX: ASE 25 June 2025 ‘Widest lithium mineralisation intersected at Red Mountain’
14 ASX: ASE 29 May 2025 ‘Two lithium zones intersected in latest drillhole at Red Mountain’
Authorisation
This announcement has been authorised for release by the Board of Astute.
Astute Metals NL Interactive Investor Hub
Engage with Astute Metals through accessing reports, presentations, interviews and
other Company content.
Ask questions and browse responses to other investors’ questions
Click on https://astutemetals.com/auth/signup and follow the prompts to sign up
More Information
Matt Healy
Executive Director & CEO
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr. Healy is a full-time employee
of Astute Metals NL and is eligible to participate in a Loan Funded Share incentive plan of the Company.
Mr. Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Healy consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialisedindustry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheldXRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
HQ diamond drilling was undertaken for drill
sample collection. Samples were collected on
a nominal 5-foot basis or sampled to
geological boundaries based on lithological
logging. Samples were photographed, halfcored, and despatched to an external lab by
an external contractor.
Include reference to measures taken to
ensuresample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation thatare Material to the Public
Report.
Claystone hosted lithium deposits are thought to
form as a result of the weathering of
lithium-bearing volcanic glass within
tertiary-aged tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of lithium from
geothermal sources have also been proposed.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, suchas where there is
coarse gold that has inherentsampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openholehammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
HQ drilling methods employed. Core was not
oriented for this drill hole.
Drill sample
recovery
Method of recording and assessing core
andchip sample recoveries and results
assessed.
Sample recovery established by recovery
logging and dry sample weights undertaken
by independent laboratory prior to sample
preparation and analysis
Measures taken to maximise sample
recoveryand ensure representative nature
of the samples.
Logging
Poor drill core recovery at surface and one section
of core loss at end of hole.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gainof fine/coarse material.
Instances of poor recovery are not expected
tomaterially impact interpretation of results
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Drill core for the entire hole was logged for
lithology bycompany geologists
Whether logging is qualitative or quantitative
innature. Core (or costean, channel, etc.)
photography.
Logging is qualitative
Photography of drill core undertaken by
contractors in Elko, NV, prior to delivery to
external laboratory
The total length and percentage of the
relevantintersections logged.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and
sample
preparatio
n
If core, whether cut or sawn and whether
quarter, half or all core taken.
Core half cored at a third part contractor
facility in Elko, NV, and submitted to ALS
Laboratories in Elko for preparation and
analysis.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness
of
the
sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the sampling
isrepresentative of the in-situ material
collected,including for instance results for field
duplicate/second-half sampling.
Quality of
assay
data and
laboratory
tests
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used
and whether the technique is considered
partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the parameters
used in determining the analysis including
instrument make and model, reading times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precisionhave been established.
Verification
of
sampling
and
assaying
A comparison of aqua-regia and 4-acid
digests was undertaken for Red Mountain
mineralisation, with no material difference in
lithium results identified.
Assay quality was monitored using pulp blanks,
as well as certified reference materials (CRMs)
at a range of lithium grades. Pulp blank results
indicated no material contamination of
samples from sample preparation or during the
analytical process. CRM results were within 3
standard deviations of certified values. No
material systematic bias nor other accuracy
related issues were identified.
The verification of significant intersections by
either independent or alternative company
personnel.
Sample intervals to be assigned a unique
sample identification number prior to sample
despatch
The use of twinned holes.
Lithium-mineralised claystone Certified
Reference Materials (standards), pulp
blanks and coarse blanks to be inserted into
the sample stream at regular intervals to
monitor lab accuracy and potential
contamination during sample prep and
analysis
Documentation of primary data, data
entry procedures, data verification, data
storage (physical
and
electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Drill Samples analysed by method ME-MS61
which is an ICP-MS method employing a 4acid digest. Rock samples were ME-MS41, a 2acid digest method.
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar and sample locations determined
using hand-held GPS with location reported in
NAD83 UTM Zone 11. Expected location accuracy
of +/- 10m
Downhole survey data yet to be validated.
For the purposes of drill sections, drill holes
have been plotted at the setup azimuth of
270° (Grid). This is not expected to make a
material difference to interpretation of
results.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing is appropriate for early exploration
purposes
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
MineralResource and Ore Reserve estimation
procedure(s) and classifications applied.
5-foot sample interval, or to geological
boundaries where appropriate, widely adopted
as standard practice in drilling in the USA.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
Claystone beds are regionally shallow-dipping at
~20°-45° to the east and varying locally across
the Project with some evidence of faulting and
potential folding
Sample
security
The measures taken to ensure sample security.
Samples stored at secure yard and shed located
in township of Currant until delivered by staff or
contractors to the core processing contractors at
Elko, and then to ALS lab at Elko, NV
Audits or
reviews
The results of any audits or reviews of
samplingtechniques and data.
Not applicable
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
Red Mountain Claims held in 100% Astute
subsidiary Needles Holdings Inc.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration
byother parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified by the
Bureau of Land Management (BLM)
No known previous lithium exploration
conducted at Red Mountain
Exploration conducted elsewhere in Nevada by
other explorers referenced in announcement
body text
The principal target deposit style is claystone
hosted lithium mineralisation. Claystone hosted
lithium deposits are thought to form as a result of
the weathering of lithium-bearing volcanic glass
within tertiary-aged tuffaceous lacustrine
sediments of the mapped Ts3 unit.
Lacustrine environments formed as a result of
extensional tectonic regime that produced ‘basin
and range’ topography observed across the
stateof Nevada. Inputs of lithium from
geothermal sources have also been proposed.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
◦ easting and northing of the drill hole collar
◦ elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
◦ dip and azimuth of the hole
◦ down hole length and interception depth
◦ hole length.
Drillhole locations, orientations and drilled
depths are tabulated in body report
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations should
be shownin detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Intersections, where quoted are weighted by
length. Lengths originally recorded in feet are
quoted to the nearest 10cm.
Rounding is conducted to 3 significant figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance for 10ft of
internal dilution by lower grade material.
Low grade mineralisation (300-500ppm Li) is
present outside of the quoted intersections
Intersections are quoted in both lithium ppm and
as wt% Lithium Carbonate Equivalent (LCE). LCE is
calculated as LCE = Li (ppm) x 5.323 / 10,000, as
per industry conventions.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
Insufficient information available due to early
exploration status, although interpretation to
date is that intersections in this hole
approximate true width.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
notknown’).
Diagrams
Appropriate maps and sections (with scales)
andtabulations of intercepts should be included
for any significant discovery being reported
These should include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Included in ASX announcement
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
This release describes all relevant information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysicalsurvey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
This release describes all relevant information
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions orlarge-scale step-out drilling).
Drill results demonstrate further work at the Red
Mountain project is warranted.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Suite 116, 165 Phillip St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 2 – Red Mountain Drilling
Sample Assay Table
Hole ID
From
(ft)
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMDD008
18.7
22
RMDD008
22
25
RMDD008
235
240
445
0.24
RMDD008
240
245
342
0.18
RMDD008
25
30
RMDD008
30
35
0.61
RMDD008
245
250
269
0.14
0.57
RMDD008
250
255
312
0.17
RMDD008
35
40
RMDD008
40
45
RMDD008
255
260
496
0.26
RMDD008
260
265
509
0.27
RMDD008
45
50
RMDD008
50
55
0.53
RMDD008
265
270
503
0.27
0.54
RMDD008
270
275
419
0.22
RMDD008
55
60
RMDD008
60
65
RMDD008
275
280
566
0.30
RMDD008
280
285
453
0.24
RMDD008
65
RMDD008
70
0.18
RMDD008
285
290
342
0.18
0.21
RMDD008
290
295
461
0.25
RMDD008
RMDD008
299
0.16
RMDD008
295
300
555
0.30
278
0.15
RMDD008
300
305
703
0.37
RMDD008
85
90
RMDD008
90
95
387
0.21
RMDD008
305
310
300
0.16
454
0.24
RMDD008
310
315
288
0.15
RMDD008
95
100
RMDD008
100
105
479
0.25
RMDD008
315
320
262
0.14
496
0.26
RMDD008
320
325
267
0.14
RMDD008
105
110
RMDD008
110
114.1
447
0.24
RMDD008
325
330
331
0.18
428
0.23
RMDD008
330
335
305
0.16
RMDD008
114.1
RMDD008
119
119
1165
0.62
RMDD008
335
340
654
0.35
123
1320
0.70
RMDD008
340
345
440
0.23
RMDD008
123
127
RMDD008
127
131
740
0.39
RMDD008
345
350
543
0.29
1035
0.55
RMDD008
350
356
489
0.26
RMDD008
131
136
RMDD008
136
141
892
0.47
RMDD008
356
361
810
0.43
152
Share your feedback
Discover