More High-Grade Lithium Results from Red Mountain Drilling
Released
Released
Announcement PDF
ASX / Media Release
24 November 2025
Suite 116 Level 1, 165-167 Phillip St Sydney, NSW 2000
GPO Box 2733, Sydney NSW 2001
P. +61 (0) 2 8046 2799 | E. admin@venariminerals.com
venariminerals.com
Further outstanding lithium results from Red Mountain, Nevada
Results complete drilling dataset for central zone, ahead of maiden MRE
Highlights
• Second batch of excellent assay results received from October drilling campaign.
• Drill-hole RMRC019 intersected a combined 166.1m of lithium mineralisation, including:
o 29m @ 1,460ppm Li from 44.2m; and
o 10.7m @ 1,480ppm Li from 112.8m; and
o 24.4m @ 1,300ppm Li from 141.7m.
• Drill-hole RMRC020 intersected a combined 56.4m of lithium mineralisation, including:
o 24.4m @ 1,600ppm Li from 4.6m; and
o 12.2m @ 1,610ppm Li from 42.7m.
• Drill-hole RMRC024 intersected a combined 182.8m of lithium mineralisation, including:
o 6.1m @ 1,330ppm Li from 74.7m; and
o 4.6m @ 1,450ppm Li from 97.5m; and
o 10.7m @ 1,090ppm Li from 167.6m; and
o 10.7m @ 1,590ppm Li from 195.1m.
• Drill-hole RMRC025 intersected a combined 115.9m of lithium mineralisation, including:
o 12.2m @ 1,697ppm Li from 146.3m; and
o 10.7m @ 1,641ppm Li from 169.2m.
• Results bolster previous wide intersections of lithium in the area, with lithium mineralisation
remaining open to the north, south and down dip.
• These results conclude the drill dataset for the central part of the Red Mountain Project area,
paving the way for the delivery of a maiden Mineral Resource Estimation later this quarter.
Venari Minerals NL (ASX: VMS) (“Venari”, “the Company” or “VMS”) is pleased to report assay results
for a further four holes of the 13-hole Reverse Circulation (RC) drilling campaign completed at the
100%-owned Red Mountain Lithium Project in Nevada, USA, in October 2025.
The latest assays include multiple thick zones of lithium mineralisation in holes RMRC019 and 020
(Figure 1) and RMRC024 and 025 (Figure 2) and build on the recently announced excellent results9
for
RMRC022 and 023, demonstrating wide intersections of lithium mineralisation with internal high-grade
zones in the central Red Mountain Project area.
2
newmurchgold.com.a
These results, which are consistent in width and tenor with those intersected in previous drill-holes
mid-project (Figure 3), mark the completion of the drill dataset in the central project area ahead of the
delivery of a maiden Mineral Resource Estimate for Red Mountain, scheduled for completion and
release next month. Assays for the remaining seven holes from the campaign, which focused on the
northern project area, are expected in the coming week.
Venari Chairman, Tony Leibowitz, said:
“These latest outstanding results from the October drilling campaign have further reinforced the
exceptional potential of the Red Mountain Project, returning broad lithium intercepts with multiple high-
grade zones. These holes complete the drilling data for the central project area, with momentum now
building towards the delivery of a maiden Mineral Resource Estimate for Red Mountain in December.
We also look forward to reporting further assay results from the northern zone of the Project later in the
month.”
Results
Highlighted intersections for the latest four drill-holes are as follows:
Hole RMRC019
• 24.4m @ 1,070ppm Li / 0.57% Lithium Carbonate Equivalent10
(LCE) from 1.5m; and
• 135.6m @ 1,120ppm Li / 0.6% LCE from 36.6m, including:
o 29m @ 1,460ppm Li / 0.78% LCE from 44.2m; and
o 10.7m @ 1,480ppm Li / 0.79% LCE from 112.8m; and
o 24.4m @ 1,300ppm Li / 0.69% LCE from 141.7m; and
• 6.1m @ 700ppm Li / 0.37% LCE from 189m.
Hole RMRC020
• 35.1m @ 1,320ppm Li / 0.70% LCE from surface, including:
o 24.4m @ 1,600ppm Li / 0.85% LCE from 4.6m; and
• 21.3m @ 1,180ppm Li / 0.63% LCE from 39.6m, including:
o 12.2m @ 1,610ppm Li / 0.86% LCE from 42.7m.
Hole RMRC024
• 6.1m @ 566ppm Li / 0.30% LCE from 13.7m; and
• 24.4m @ 759ppm Li / 0.40% LCE from 36.6m; and
• 54.9m @ 919ppm Li / 0.49% LCE from 65.5m, including:
o 6.1m @ 1,330ppm Li / 0.71% LCE from 74.7m; and
o 4.6m @ 1,450ppm Li / 0.77% LCE from 97.5m; and
• 7.6m @ 787ppm Li / 0.42% LCE from 137.2m; and
• 71.6m @ 905ppm Li / 0.48% LCE from 153.9m, including:
o 10.7m @ 1,090ppm Li / 0.58% LCE from 167.6m; and
o 10.7m @ 1,590ppm Li / 0.85% LCE from 195.1m; and
• 9.1m @ 950 ppm Li / 0.51% LCE from 248.4m; and
• 9.1m @ 1,130ppm Li / 0.60% LCE from 262.1m.
3
newmurchgold.com.a
Hole RMRC025
• 12.2m @ 608ppm Li / 0.32% LCE from 12.2m; and
• 4.6m @ 737ppm Li / 0.39% LCE from 71.6m; and
• 99.1m @ 1,176ppm Li / 0.63% LCE from 97.5m, including:
o 12.2m @ 1,697ppm Li / 0.9% LCE from 146.3m; and
o 10.7m @ 1,641ppm Li / 0.87% LCE from 169.2m.
Figure 1. RMRC019-020 preliminary interpretative cross-section, lithium grade and (35m off-section) surface samples.
Figure 2. RMRC0024-025 preliminary interpretative cross-section, lithium grade and (35m off-section) surface samples.
4
newmurchgold.com.a
Figure 3. Red Mountain north and central drill intersections over gridded soil geochemistry image.
5
newmurchgold.com.a
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMRC019 637892.1 4288689.1 1736.2 270.5 -50 219.5
RMRC020 637672.3 4288761.1 1728.1 270.5 -50 298.7
RMRC024 637495.2 4287762.7 1723.8 270.5 -50 271.3
RMRC025 637239.8 4287748.2 1705.3 270.5 -60 243.8
Table 1. Drill collar details
Background
Located in central-eastern Nevada (Figure 4), adjacent to the Grand Army of the Republic Highway (Route
6), the Red Mountain Project was staked by Venari in August 2023.
Figure 4. Location of Red Mountain and other Nevada Lithium projects.
6
newmurchgold.com.a
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the Horse
Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium deposits (see Figure 4) such as
Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3
and American Battery Technology
Corporation’s (NASDAQ: ABAT) 15.8Mt LCE Tonopah Flats deposit4
.
Prior to the current campaign, a total of 19 drill holes had been completed at the project to date for a
combined 3,336m of drilling across three campaigns. These campaigns have been highly successful,
intersecting strong lithium mineralisation in almost every hole6
.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration5
, and beneficiation test-
work has indicated the potential to upgrade the Red Mountain mineralisation1,2,7
.
References
1 – ASX: ASE, 22 April 2025, Beneficiation testwork successfully upgrades mineralisation at Red Mountain
2 - ASX: ASE, 10 June 2025, Beneficiation Delivers 4,480ppm Lithium Clay Concentrate at Red Mountain
3 - NYSE: LAC, 31 December 2024, Updated NI 43-101 Technical Report for the Thacker Pass Project
4 - OTCMKTS: ABML, 26 February 2023, Technical Report Summary for The Tonopah Flats Lithium Project, Esmeralda
5 - ASX: ASE, 9 December 2024, Positive initial metallurgical results from Red Mountain
6 - ASX: ASE, 25 June 2025, Exceptional Drill-hole Intersects combined 170m of Lithium Mineralisation at Red Mountain
7 - ASX: ASE, 3 September 2025, Outstanding lithium anomalism in surface sampling at Red Mountain Extension
8 – ASX: VMS, 15 October 2025, Metallurgical test-work delivers 132% upgrade to lithium mineralisation at Red Mountain, Nevada
9 – ASX: VMS, 17 November 2025, Initial Red Mountain Assays confirm High-grade Lithium
10 – Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm)
x 5.323 /10,000
Authorisation
This announcement has been authorised for release by the Board of Venari Minerals NL.
Join the Venari Minerals Investor Hub
Engage with Venari Minerals through accessing reports, presentations, interviews
and other Company content. Ask Questions and browse responses to other
investors’ questions. Click here and follow the prompts to sign up.
For further information, please contact:
Matthew Healy Nicholas Read
Executive Director & CEO Media & Investor Relations
T: +61 (0) 431 683 952 T: +61 (0) 419 929 046
E: matt@venariminerals.com E: nicholas@readcorporate.com.au
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
7
newmurchgold.com.a
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a full-time employee
of Venari Minerals NL and is eligible to participate in share-based incentive schemes of the Company.
Mr Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
8
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
5.5” reverse circulation drilling was
undertaken for drill sample
collection. Samples were collected
on a 5-foot basis in calico bags,
with approximate 30% split
retained from a rotary cone splitter
for lab assay. Water was injected
throughout the hole.
Nominal small drill sample was
collected for chip tray records
Samples were air dried on elevated
grid mesh until practical to
transport
Claystone hosted lithium deposits
are thought to form as a result of
the weathering of lithium-bearing
volcanic glass within tertiary-aged
tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of
lithium from geothermal sources
have also been proposed.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
5.5” Reverse Circulation drilling
methods employed using a cross-
over sub immediately behind the
hammer.
9
newmurchgold.com.a
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries
and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Sample recoveries to be measured by
dry sample weight at the laboratory
prior to assay.
Some instances of poor recovery
noted.
Instances of poor recovery are not
expected to materially impact
interpretation of results
Logging Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of
the relevant intersections logged.
Drill cuttings of entire hole logged
for lithology by consultant
geologist
Logging is qualitative with selective
quantitative logging (e.g. quartz
veining)
Chip tray photography undertaken
on all full drill holes
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the
sampling isrepresentative of the in-situ
material collected,including for instance
results for field duplicate/second-half
sampling.
Samples 30% split using a rotary cone
splitter and submitted to ALS
Laboratories in Elko for preparation
and analysis.
10
newmurchgold.com.a
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to
thegrain size of thematerial being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used andwhether the technique is
considered partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and theirderivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
Samples analysed by method ME-
MS61 which is an ICP-MS method
employing a 4-acid digest.
A comparison of aqua-regia and 4-
acid digests was undertaken for Red
Mountain mineralisation, with no
material difference in lithium results
identified.
Assay quality was monitored using
pulp blanks, as well as certified
reference materials (CRMs) at a range
of lithium grades. Pulp blank results
indicated no material contamination
of samples from sample preparation
or during the analytical process. CRM
results were within 3 standard
deviations of certified values. No
material systematic bias nor other
accuracy related issues were
identified.
Verification
of sampling
and
assaying
The verification of significant intersections
byeither independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entryprocedures, data verification, data
storage(physical and electronic)
protocols.
Discuss any adjustment to assay data.
Sample intervals assigned a unique
sample identification number
prior to sample despatch
Lithium-mineralised claystone
Certified Reference Materials
(standards), pulp blanks and coarse
blanks inserted into the sample
stream at regular intervals to monitor
lab accuracy and potential
contamination during sample prep
and analysis.
Location of
data points
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar locations determined using
hand held GPS with location reported
in NAD83 UTM Zone 11 with expected
accuracy of +/- 10m
Downhole surveys conducted on drill
holes at nominal 100ft intervals, with
drill rigs lined up by compass and
clino at start of hole.
11
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria JORC Code explanation Commentary
Data
spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Drill spacing appropriate for early
stage exploration
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Claystone beds are regionally
shallow-dipping at ~20°-45° to the
east and varying locally across the
Project with some evidence of faulting
and potential folding.
Sample
security
The measures taken to ensure sample
security.
Samples stored at secured yard and
shed located in township of Currant
until delivered by staff or contractors to
the ALS labs
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Not applicable
12
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Red Mountain Claims held in 100%
subsidiary Needles Holdings Inc.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified
by the Bureau of Land Management
(BLM)
Exploration
done by
other parties
Acknowledgment and appraisal of
exploration by other parties.
No known previous lithium exploration
conducted at Red Mountain.
Exploration conducted elsewhere in
Nevada by other explorers referenced in
body text.
Geology Deposit type, geological setting and style
of mineralisation.
The principal target deposit style is
claystone hosted lithium
mineralisation. Claystone hosted
lithium deposits are thought to form as
a result of the weathering of lithium-
bearing volcanic glass within tertiary-
aged tuffaceous lacustrine sediments
of the mapped Ts3 unit.
Lacustrine environments formed as a
result of extensional tectonic regime
that produced ‘basin and range’
topography observed across the state
of Nevada. Inputs of lithium from
geothermal sources have also been
proposed.
13
newmurchgold.com.a
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
• easting and northing of the drill
hole collar
• elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception
depth
• hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Drill hole information is tabulated in
body text and/or shown in relevant
maps.
Data
Aggregation
Methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated
Intersections, where quoted are
weighted by length. Lengths originally
recorded in feet are quoted to the
nearest 10cm.
Rounding is conducted to 3 significant
figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance
for 10ft of internal dilution by lower
grade material.
Low grade mineralisation (300-500ppm
Li) is present outside of the quoted
intersections
Intersections are quoted in both lithium
ppm and as wt% Lithium Carbonate
Equivalent (LCE). LCE is calculated as
LCE = Li (ppm) x 5.323 / 10,000, as per
industry conventions
14
newmurchgold.com.a
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Insufficient information available due to
early exploration status, although
interpretation to date is that
intersections in this hole approximate
true width.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Included in ASX announcement.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
This release describes all relevant
information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
This release describes all relevant
information
Further work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
The Red Mountain lithium project is
emerging as a significant lithium
discovery in Nevada and is being
advanced toward a maiden Mineral
Resource Estimate later this year. It is
the Company’s intent to advance the
project beyond this to technical
studies.
15
newmurchgold.com.a
APPENDIX 2 – Red Mountain Drilling Sample Assay Table
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Sample
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC019 5 10 830 0.44 RMRC019 215 220 281 0.15
RMRC019 10 15 779 0.41 RMRC019 220 225 1620 0.86
RMRC019 15 20 925 0.49 RMRC019 225 230 1620 0.86
RMRC019 20 25 1715 0.91 RMRC019 230 235 1840 0.98
RMRC019 25 30 1085 0.58 RMRC019 235 240 1400 0.75
RMRC019 30 35 585 0.31 RMRC019 240 245 929 0.49
RMRC019 35 40 487 0.26 RMRC019 245 250 347 0.18
RMRC019 40 45 1050 0.56 RMRC019 250 255 716 0.38
RMRC019 45 50 1010 0.54 RMRC019 255 260 1130 0.60
RMRC019 50 55 949 0.51 RMRC019 260 265 652 0.35
RMRC019 55 60 1145 0.61 RMRC019 265 270 466 0.25
RMRC019 60 65 1200 0.64 RMRC019 270 275 750 0.40
RMRC019 65 70 1415 0.75 RMRC019 275 280 1550 0.83
RMRC019 70 75 985 0.52 RMRC019 280 285 1500 0.80
RMRC019 75 80 875 0.47 RMRC019 285 290 1280 0.68
RMRC019 80 85 2030 1.08 RMRC019 290 295 537 0.29
RMRC019 85 90 408 0.22 RMRC019 295 300 999 0.53
RMRC019 90 95 410 0.22 RMRC019 300 305 1495 0.80
RMRC019 95 100 384 0.20 RMRC019 305 310 1790 0.95
RMRC019 100 105 158 0.08 RMRC019 310 315 1550 0.83
RMRC019 105 110 80 0.04 RMRC019 315 320 1170 0.62
RMRC019 110 115 73.1 0.04 RMRC019 320 325 1010 0.54
RMRC019 115 120 482 0.26 RMRC019 325 330 811 0.43
RMRC019 120 125 858 0.46 RMRC019 330 335 1235 0.66
RMRC019 125 130 922 0.49 RMRC019 335 340 1045 0.56
RMRC019 130 135 LOSS - RMRC019 340 345 1300 0.69
RMRC019 135 140 907 0.48 RMRC019 345 350 967 0.51
RMRC019 140 145 700 0.37 RMRC019 350 355 626 0.33
RMRC019 145 150 1175 0.63 RMRC019 355 360 522 0.28
RMRC019 150 155 1370 0.73 RMRC019 360 365 885 0.47
RMRC019 155 160 1355 0.72 RMRC019 365 370 975 0.52
RMRC019 160 165 1250 0.67 RMRC019 370 375 1615 0.86
RMRC019 165 170 1325 0.71 RMRC019 375 380 1940 1.03
RMRC019 170 175 1115 0.59 RMRC019 380 385 1680 0.89
RMRC019 175 180 1385 0.74 RMRC019 385 390 1505 0.80
RMRC019 180 185 1480 0.79 RMRC019 390 395 1410 0.75
RMRC019 185 190 2060 1.10 RMRC019 395 400 1115 0.59
RMRC019 190 195 1440 0.77 RMRC019 400 405 1085 0.58
RMRC019 195 200 619 0.33 RMRC019 405 410 962 0.51
RMRC019 200 205 2250 1.20 RMRC019 410 415 475 0.25
RMRC019 205 210 2560 1.36 RMRC019 415 420 1025 0.55
RMRC019 210 215 1575 0.84 RMRC019 420 425 736 0.39
16
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Sample
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC019 425 430 938 0.50 RMRC019 635 640 889 0.47
RMRC019 430 435 615 0.33 RMRC019 640 645 327 0.17
RMRC019 435 440 344 0.18 RMRC019 645 650 312 0.17
RMRC019 440 445 633 0.34 RMRC019 650 655 230 0.12
RMRC019 445 450 296 0.16 RMRC019 655 660 249 0.13
RMRC019 450 455 466 0.25 RMRC019 660 665 379 0.20
RMRC019 455 460 1000 0.53 RMRC019 665 670 162.5 0.09
RMRC019 460 465 852 0.45 RMRC019 670 675 128 0.07
RMRC019 465 470 1515 0.81 RMRC019 675 680 120 0.06
RMRC019 470 475 1420 0.76 RMRC019 680 685 340 0.18
RMRC019 475 480 1220 0.65 RMRC019 685 690 192.5 0.10
RMRC019 480 485 1190 0.63 RMRC019 690 695 161.5 0.09
RMRC019 485 490 745 0.40 RMRC019 695 700 149.5 0.08
RMRC019 490 495 1510 0.80 RMRC019 700 705 279 0.15
RMRC019 495 500 969 0.52 RMRC019 705 710 179 0.10
RMRC019 500 505 564 0.30 RMRC019 710 715 122.5 0.07
RMRC019 505 510 1020 0.54 RMRC019 715 720 154 0.08
RMRC019 510 515 1690 0.90 RMRC020 0 5 582 0.31
RMRC019 515 520 1890 1.01 RMRC020 5 10 919 0.49
RMRC019 520 525 757 0.40 RMRC020 10 15 795 0.42
RMRC019 525 530 1415 0.75 RMRC020 15 20 1280 0.68
RMRC019 530 535 1930 1.03 RMRC020 20 25 2010 1.07
RMRC019 535 540 1710 0.91 RMRC020 25 30 1330 0.71
RMRC019 540 545 1260 0.67 RMRC020 30 35 1225 0.65
RMRC019 545 550 862 0.46 RMRC020 35 40 1180 0.63
RMRC019 550 555 863 0.46 RMRC020 40 45 1635 0.87
RMRC019 555 560 438 0.23 RMRC020 45 50 1420 0.76
RMRC019 560 565 650 0.35 RMRC020 50 55 1125 0.60
RMRC019 565 570 331 0.18 RMRC020 55 60 1305 0.69
RMRC019 570 575 344 0.18 RMRC020 60 65 1785 0.95
RMRC019 575 580 342 0.18 RMRC020 65 70 2020 1.08
RMRC019 580 585 312 0.17 RMRC020 70 75 1335 0.71
RMRC019 585 590 162.5 0.09 RMRC020 75 80 1795 0.96
RMRC019 590 595 139.5 0.07 RMRC020 80 85 2630 1.40
RMRC019 595 600 192.5 0.10 RMRC020 85 90 2290 1.22
RMRC019 600 605 301 0.16 RMRC020 90 95 1150 0.61
RMRC019 605 610 249 0.13 RMRC020 95 100 843 0.45
RMRC019 610 615 184.5 0.10 RMRC020 100 105 403 0.21
RMRC019 615 620 211 0.11 RMRC020 105 110 552 0.29
RMRC019 620 625 833 0.44 RMRC020 110 115 714 0.38
RMRC019 625 630 554 0.29 RMRC020 115 120 361 0.19
RMRC019 630 635 525 0.28 RMRC020 120 125 299 0.16
17
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Sample
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC020 125 130 264 0.14 RMRC020 335 340 87.8 0.05
RMRC020 130 135 584 0.31 RMRC020 340 345 186.5 0.10
RMRC020 135 140 487 0.26 RMRC020 345 350 245 0.13
RMRC020 140 145 1015 0.54 RMRC020 350 355 131.5 0.07
RMRC020 145 150 1865 0.99 RMRC020 355 360 115 0.06
RMRC020 150 155 2160 1.15 RMRC020 360 365 477 0.25
RMRC020 155 160 1545 0.82 RMRC020 365 370 631 0.34
RMRC020 160 165 1885 1.00 RMRC020 370 375 385 0.20
RMRC020 165 170 1750 0.93 RMRC020 375 380 383 0.20
RMRC020 170 175 1555 0.83 RMRC020 380 385 263 0.14
RMRC020 175 180 1110 0.59 RMRC020 385 390 227 0.12
RMRC020 180 185 765 0.41 RMRC020 390 395 385 0.20
RMRC020 185 190 654 0.35 RMRC020 395 400 367 0.20
RMRC020 190 195 437 0.23 RMRC020 400 405 222 0.12
RMRC020 195 200 687 0.37 RMRC020 405 410 281 0.15
RMRC020 200 205 453 0.24 RMRC020 410 415 580 0.31
RMRC020 205 210 314 0.17 RMRC020 415 420 424 0.23
RMRC020 210 215 219 0.12 RMRC020 420 425 250 0.13
RMRC020 215 220 302 0.16 RMRC020 425 430 153.5 0.08
RMRC020 220 225 394 0.21 RMRC020 430 435 394 0.21
RMRC020 225 230 244 0.13 RMRC020 435 440 513 0.27
RMRC020 230 235 327 0.17 RMRC020 440 445 407 0.22
RMRC020 235 240 387 0.21 RMRC020 445 450 222 0.12
RMRC020 240 245 114 0.06 RMRC020 450 455 155.5 0.08
RMRC020 245 250 231 0.12 RMRC020 455 460 128 0.07
RMRC020 250 255 207 0.11 RMRC020 460 465 165.5 0.09
RMRC020 255 260 206 0.11 RMRC020 465 470 228 0.12
RMRC020 260 265 110 0.06 RMRC020 470 475 270 0.14
RMRC020 265 270 160 0.09 RMRC020 475 480 225 0.12
RMRC020 270 275 195 0.10 RMRC020 480 485 210 0.11
RMRC020 275 280 177 0.09 RMRC020 485 490 140.5 0.07
RMRC020 280 285 140 0.07 RMRC020 490 495 114.5 0.06
RMRC020 285 290 98 0.05 RMRC020 495 500 125.5 0.07
RMRC020 290 295 129.5 0.07 RMRC020 500 505 136.5 0.07
RMRC020 295 300 157 0.08 RMRC020 505 510 82.5 0.04
RMRC020 300 30
Share your feedback