31 March 2026 Quarterly Report
Successful delivery of an initial JORC Inferred Mineral Resource Estimate for the Red Mountain
Lithium Project in Nevada, comprising 500Mt @ 1,139ppm Li for 3.03Mt of contained LCE
Highlights
Red Mountain Lithium Project, Nevada (USA)
• Maiden JORC Inferred Mineral Resource Estimate (MRE) for the Red Mountain Lithium
Project of 500Mt @ 1,139ppm Li for 3.03Mt contained Lithium Carbonate Equivalent (LCE)
reported above the preferred 700pm Li cut-off grade, comprising:
o Red Mountain North – 91.6Mt @ 1,618ppm Li for 0.79Mt LCE, including a high-grade
component of:
▪ 47.9Mt @ 2,193ppm Li for 0.56Mt LCE at a 1,300ppm lithium cut-off.
o Red Mountain Central – 408Mt @ 1,031ppm Li for 2.24Mt LCE at a 700ppm lithium
cut-off.
o Outstanding potential to grow the Mineral Resources with significant drill intersections
and high-grade surface samples sitting outside of the MRE extents and with
mineralisation open along strike and at depth.
o Venari now ranked as one of the larger lithium explorers on the ASX, on a contained
LCE basis.
• Final assay results received from the October 2025 drilling campaign at Red Mountain:
o Drill-hole RMRC016 intersected a combined 10.6m of lithium mineralisation,
including 6.1m @ 2,130ppm Li from 32m.
o Drill-hole RMRC017 intersected a combined 9.1m of lithium mineralisation,
including 3m @ 2,770ppm Li from 33.5m.
o Drill-hole RMRC018 intersected a combined 9.1m of lithium mineralisation,
including 4.6m @ 1,320ppm Li from 22.9m.
o Results add to previous high-grade intersections in the Project’s northern area9
, where
lithium mineralisation grading >2,000ppm has now been intersected in drill-holes over
>1km strike.
• Improved beneficiation test-work results achieved through pre-soaking of high-grade
material prior to attrition-scrubbing:
o Lithium upgraded by 46.2% from 2,600ppm Li to 3,800ppm Li in <20µm product
o Mass reduction of 54.6% from 926.15g to 420.54g in <20µm product
o Calcite content reduced by 14.9% from 35wt% to 29.8wt% in <20µm product
o Clay recovery of 66.8% and lithium recovery of 68.9% in <20µm product
o Results represent an incremental improvement over prior attrition scrubbing tests
that did not employ a pre-soaking step, with:
▪ Lithium upgrade improved to 46.2% from 44.2%
▪ Lithium recovery improved to 66.8% from 59.6%
2
newmurchgold.com.a
Corporate
• Share buyback of unmarketable parcels of shares (being 3,846 shares or less) at a price of 13
cents per share completed. The buyback has streamlined the Company’s share register and
reduced ongoing compliance costs.
Venari Minerals NL (ASX: VMS) (“Venari”, “the Company” or “VMS”) is pleased present its activities for
the quarter ended 31 March 2026.
Red Mountain Lithium Project, Nevada
Located in central-eastern Nevada (Figure 1), adjacent to the Grand Army of the Republic Highway
(Route 6), the Red Mountain Lithium Project was staked by Venari in August 2023. The Red Mountain
Project, including the Red Mountain Extension, comprises 407 unpatented lode mining claims for a
combined surface area of 33km2
.
The Red Mountain project is well-serviced by infrastructure, located immediately adjacent to the
transcontinental Route 6 and 20km west of the 525kV ‘One Nevada’ high-voltage transmission line, and
with 592,000m3
of annual water rights secured with an associated 113-acre private property only 6km
from the Project (Figure 2).
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the
Horse Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium deposits (see Figure
1) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project and American Battery
Technology Corporation’s (NASDAQ: ABAT) 18.7Mt LCE Tonopah Flats deposit.
A total of 32 drill-holes have been completed at the project across four drilling campaigns for a
combined 6,015.6m of drilling. These campaigns were highly successful, intersecting strong lithium
mineralisation in almost every hole.
3
newmurchgold.com.a
Figure 1. Location of Venari’s Lithium Projects and other Nevada lithium deposits
Initial metallurgical test-work has also been very positive, with scoping leachability test-work on
mineralised material from Red Mountain indicatinghigh leachability of lithium of up to 98%, varying with
temperature, acid strength and leaching duration, with beneficiation test-work also indicating the
potential to upgrade the Red Mountain mineralisation.
4
newmurchgold.com.a
Figure 2. The Red Mountain Lithium Project is well-serviced by road and power with nearby private water rights secured
5
newmurchgold.com.a
Work completed during the quarter
RC Drilling Results
Assay results for the final three drill holes from the Company’s Q3 2025 Reverse Circulation (RC) drilling
campaign were returned during the quarter. The objective of the drilling campaign was to provide
sufficient drill data to estimate a maiden Mineral Resource Estimate for the northern and central parts
of the project. Assay highlights for the three holes included:
Hole RMRC016
• 3m @ 1,030ppm Li / 0.55% Lithium Carbonate Equivalent (LCE) from 10.7m
• 6.1m @ 2,130ppm Li / 1.13% LCE from 32m incl
o 3m @ 3,550ppm Li / 1.89% LCE from 33.5m
• 1.5m @ 575ppm Li / 0.31% LCE from 91.4m
Hole RMRC017
• 4.6m @ 1,060ppm Li / 0.56% LCE from 9.1m
• 3m @ 2,770ppm Li / 1.47% LCE from 33.5m
• 1.5m @ 576ppm Li / 0.31% LCE from 94.5m.
Hole RMRC018
• 9.1m @ 1,110ppm Li / 0.59% LCE from 19.8m incl
o 4.6m @ 1,320ppm Li / 0.7% LCE from 22.9m
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMRC016 637019.9 4291604.7 1703.7 270.5 -50 167.64
RMRC017 637023.2 4291604.7 1704.0 - -90 182.88
RMRC018 637266.1 4289961.9 1728.5 270.5 -70 140.21
Table 1. Drill collar details for reported assay results
Complete assay results were provided in the appendices included in the original ASX release dated 12
January 2026.
These final assays, from holes drilled in the northern project area, demonstrate a similar high tenor of
mineralisation to the previous holes drilled in that part of the project, with two of the three holes
intersecting lithium mineralisation grades exceeding 2,000ppm Li (Figures 3, 4 and 5).
The receipt of assays for these three holes completed the drill-hole dataset for the Red Mountain
Lithium Project, paving the way for reporting a maiden MRE.
6
newmurchgold.com.a
Figure 3. RMRC016-017 preliminary interpretative cross-section with down-hole lithium geochemistry.
Figure 4. RMRC018-RMDD004 preliminary interpretative cross-section with down-hole lithium geochemistry.
7
newmurchgold.com.a
Figure 5. Red Mountain north and central (down-hole) drill intersections over gridded soil geochemistry image. Hole
RMDD002, used for beneficiation test-work, is shown fifth from the top on the right-hand side.
8
newmurchgold.com.a
Attrition Scrubbing Beneficiation Test-work
Results for Attrition Scrubbing Beneficiation test-work were reported during the Quarter. The latest test-
work was designed to follow-up on initial attrition scrubbing test-work (see ASX Release dated 2
February 2025) and incorporated a pre-soaking step prior to attrition scrubbing to enhance clay
liberation and lithium recovery.
Attrition scrubbing is an established technique whereby minerals are separated through the action of
particles impacting one another within a slurry. The objective of the test-work is to separate clay from
other minerals and achieve an upgraded concentrate of lithium-bearing clay with decreased waste
minerals.
Hole ID From (ft) To (ft) Composite
RMDD002 165 170
High-grade
RMDD002 170 175
RMDD002 175 180
RMDD002 180 186
RMDD002 186 190.5
RMDD002 190.5 195
RMDD002 195 201.7
RMDD002 215 220
Low-grade
RMDD002 220 225.4
RMDD002 225.4 230
RMDD002 230 235
Table 2. Source drill-hole details for Attrition Scrubbing composite samples (see Figure 5 for collar location)
One sample was provided to Hazen for this beneficiation test-work with a pre-soaking step – a high-
grade composite made up of half HQdrill core from diamond drill hole RMDD002 (Tables 2 and 3, Figure
5). Samples were stage-crushed to 850µm and split into 1kg charges for attrition scrubbing
experiments. Head assays were conducted on each of the composite samples (Table 3).
Composite Sample Li (ppm) Ca (%)
High-grade 2,500 13.0
Table 3. Lithium and calcium head assays for composite samples
After pre-soaking with gentle agitation for 48hrs, one attrition scrubbing experiment was conducted on
the high-grade composite using a pulp density of 30%. Attrition scrubbing test-work was conducted
using a Denver attrition scrubbing machine, a 1L plexiglass cell and an impeller speed of 1,330rpm for
a 12-minute test time. The scrubbed material was then wet-screened at 106, 75, 38 and 20µm size
fractions which were each dried, weighed and assayed for lithium and calcium, and mineralogy
determined using powder XRD. Clay minerals are very fine and concentrate in the <20µm fraction.
9
newmurchgold.com.a
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMDD002 637186 4290574 1709 270 -50 182.88
Table 4. Drill collar details for RMDD002
Attrition scrubbing with pre-soaking resulted in improved beneficiation results over the previous test.
The test removed 54.6% of sample mass (between head sample and <20µm fraction), a reduction in
calcite content from 35wt% to 29.8wt%, and a lithium grade increase from 2,600ppm in the head
sample to 3,800ppm. Clay and lithium recoveries were 66.8% and 68.9%, respectively.
These results compare favourably with the previous attrition scrubbing test-work results:
• Improved lithium upgrade of 46.2% vs 44.2%
• Comparable reduction in (acid-consuming) calcite content of 14.9% vs 15.7%
• Improved lithium recovery of 66.8% vs 59.6%
• Slightly lower mass reduction of 54.6% vs 59.6%
The Company intends to undertake further beneficiation test-work to optimise waste mineral removal
and lithium recovery. Beneficiation is featured in the flowsheets of most advanced sedimentary lithium
projects and plays an important role in reducing reagent consumption and increasing lithium head
grade ahead of leaching. Test-work aimed at producing a lithium carbonate product from Red Mountain
mineralisation continues, and is expected to be completed in the next quarter.
During the quarter, the Company engaged highly-regarded Brisbane-based engineering consultancy,
Pitch Black Group (Pitch Black), to review and evaluate the metallurgical test-work conducted to date
anddevelop a program offuture test-work that will lead to the development of a scoping-level flowsheet
for the Red Mountain Project. Pitch Black has extensive expertise in flow-sheet development for lithium
projects around the world, including sedimentary lithium deposits such as Red Mountain.
Maiden Mineral Resource Estimate
Undoubtedly, the highlight for the quarter was the declaration of a maiden JORC Mineral Resource
Estimate (MRE) for the Red Mountain Lithium Project in February 2026. The Inferred MRE was reported
at a preferred cut-off grade of 700ppm Li and totalled 500Mt @ 1,139ppm Li for 3Mt of contained LCE
(Table 5). An exceptionally high-grade zone of mineralisation is present in the project’s north, where the
Company has established a high-grade MRE of 47.9Mt @ 2,193ppm Li for 560kt contained LCE at a
higher 1,300ppm Li cut-off (Table 7).
The maiden MRE for Red Mountain has been delivered less than two years since the discovery hole was
drilled into the deposit in May 2024. Since that time, the Company has rapidly advanced the project,
adopting a counter-cyclical approach to its exploration at a time of weakness in the lithium market.
With the lithium industry now undergoing a strong resurgence,the delivery of this substantial initial MRE
has confirmed Red Mountain as a significant deposit in the USA with potential to become a valuable,
new, long-life source of lithium aligned with Western supply chains.
Unlike most other sedimentary lithium deposits, the Red Mountain Project stratigraphy dips gently to
the east, which results in outcropping, or shallowly sub-cropping, mineralised rocks.
10
newmurchgold.com.a
The thickness of the mineralised zones, the presence of high-grade mineralisation of >2,000ppm Li in
the Project north, together with their outcropping character, bodes well for any future assessment of
project economics (Figure 7 and 8).
The Red Mountain Lithium Project compares favourably with other ASX-listed companies’ Lithium
MREs on the basis of contained Lithium (Figure 6, Table 6).
Area Category Tonnes (Mt) Li (ppm) LCE (%) LCE (Mt)
North Inferred 91.6 1,618 0.86% 0.79
Central Inferred 408 1,031 0.55% 2.24
TOTAL Inferred 500 1,139 0.61% 3.03
Table 5. Red Mountain maiden MRE at the preferred reporting cut-off grade of 700ppm Li.
Figure 6. ASX-listed lithium explorer (producers and developers excluded) ranked by contained Lithium Carbonate
Equivalent (LCE) by Mineral Resource Category and deposit type. Contained LCE calculated using 2.475 conversion
factor for Li2O – LCE and 5.323 conversion factor for ppm Li to LCE. Source MRE details provided in Table 6
0
5
10
15
20
25
Li
in
Combined
MRE
(LCE,
Mt)
Red Mountain
Lithium Project
11
newmurchgold.com.a
Company, Ticker, Resource type Mineral Resource Estimates
LCE in Mineral Resources
(Mt)
Measured Indicated Inferred Meas. Ind. Inf. Total
Jindalee Lithium, JLL, Sed.
1470Mt @
1420ppm Li
1540Mt @
1270ppm Li
11 10 21.5
Lake Resources, LKE, Brine
4.19Mt LCE @
226.4mg/l Li
4Mt LCE @
206.6mg/l Li
2.89Mt LCE @
215mg/l Li
4.19 4.00 2.89 11.07
European Metal Holdings, EMH,
Spod.
53.3Mt @
0.48% Li2O
360.2Mt @
0.44% Li2O
294.7Mt @
0.39% Li2O
0.63 3.92 2.84 7.40
Pmet, PMT, Spod.
108.68Mt @
1.41% Li2O
35.08Mt @
1.35% Li2O
3.80 1.17 4.97
Prairie Lithium, PL9, Brine
4.6Mt LCE @
98mg/l Li
4.60 4.60
Venari Minerals, VMS, Sed.
500Mt @
1,139ppm Li
3.03 3.03
Winsome Resources, WR1, Spod.
61.4Mt @
1.14% Li2O
16.5Mt @
1.19% Li2O
1.73 0.49 2.22
Wildcat Resources, WC8, Spod.
70Mt @ 1.01%
Li2O
4.1Mt @
0.76% Li2O
1.75 0.08 1.83
Global Lithium Resources, GL1,
Spod.
36.7Mt @
1.03% Li2O
32.9Mt @
0.96% Li2O
0.94 0.78 1.72
Atlantic Lithium, A11, Spod.
3.7Mt @
1.37% Li2O
26.1Mt @
1.24% Li2O
7Mt @ 1.15%
Li2O
0.13 0.80 0.20 1.13
Pursuit Minerals, PUR, Brine
0.59Mt LCE @
515.1mg/l Li
0.51Mt LCE @
495.4mg/l Li
0.59 0.51 1.10
Greenwing Resources, GW1, Brine
0.67Mt LCE @
192mg/l Li
0.4Mt LCE @
200mg/l Li
0.67 0.40 1.07
Delta Lithium, DLI, Spod.
0.5Mt @ 1.2%
Li2O
23.3Mt @
1.09% Li2O
12.9Mt @
1.01% Li2O
0.01 0.63 0.32 0.97
Green Technology Metals, GT1,
Spod.
16.1Mt @
1.29% Li2O
14.2Mt @
1.01% Li2O
0.51 0.35 0.87
Infinity Metals, INF, Spod.
59Mt @ 0.29%
Li2O
52.2Mt @
0.27% Li2O
0.42 0.35 0.77
European Lithium, EUR, Spod.
4.31Mt @
1.13% Li2O
5.43Mt @
0.95% Li2O
3.14Mt @
0.9% Li2O
0.12 0.13 0.07 0.32
Critical Resources, CRR, Spod.
8Mt @ 1.07%
Li2O
0.21 0.21
Lithium Plus Minerals, LPM, Spod.
0.42Mt @
1.22% Li2O
3.67Mt @
1.45% Li2O
0.01 0.13 0.14
Anson Resources, ASN, Brine
0.02Mt LCE @
93.5mg/l Li
0.08Mt LCE @
93.5mg/l Li
0.02 0.08 0.10
Table 6. ASX-listed lithium explorers (i.e. producers and developers excluded) Mineral Resource Estimates and
contained Lithium Carbonate Equivalent (LCE). Brine Resources as contained LCE and Li as mg/L, sedimentary
resources in Mt and ppm Li and spodumene resources in Mt and Li2O%. Contained LCE calculated from source Mineral
Resource Estimates using 2.475 conversion factor for Li2O – LCE and 5.323 conversion factor for ppm Li to LCE
Mineral Resource Estimate Sources:
ASX: LKE Noosa Mining Conference Presentation, 11 Nov 2025 ASX: JLL McDermitt PFS, 19 Nov 2024
ASX: EMH Transitional Annual Report 2024, 31 Mar 2025 ASX: PMT Corporate Presentation, Dec 2025
ASX: WR1-LiFT Corporate Presentation, 15 Dec 2025 ASX: LPM AGM Presentation, 27 Nov 2024
ASX: A11 Annual Report 2025, 11 Sept 2025 ASX: INF Annual Report 2025
ASX: GW1 AGM Presentation, 25 Nov 2025 ASX: DLI AGM Presentation, 27 Nov 2025
ASX: GT1 Investor Presentation, 10 Sept 2025 ASX: ASN AGM Presentation, 26 Nov 2025
ASX: EUR Wolfsberg Project Updated presentation, May 2022 ASX: WC8 Annual Report 2025, 23 Sept 2025
ASX: CRR NZ Gold and Antimony Projects Presentation, 6 Aug 2025 ASX: GL1 Annual Report 2025, 29 Oct 2025
ASX: PUR Resources Rising Stars Presentation, 17 Sept 2025 ASX: PL9 Annual Report 2025, 26 Sept 2025
12
newmurchgold.com.a
Area Category
Cut-off
(ppm Li)
Tonnes
(Mt)
Li
(ppm)
LCE (%)
Contained
LCE (Mt)
North Inferred 500 113 1427 0.76% 0.85
North Inferred 700 91.6 1618 0.86% 0.79
North Inferred 900 77.8 1765 0.94% 0.73
North Inferred 1100 60.3 1988 1.06% 0.64
North Inferred 1300 47.9 2193 1.17% 0.56
North Inferred 1500 38.2 2395 1.27% 0.49
North Inferred 1700 30.0 2614 1.39% 0.42
Central Inferred 500 563 912 0.49% 2.73
Central Inferred 700 408 1031 0.55% 2.24
Central Inferred 900 266 1157 0.62% 1.64
Central Inferred 1100 145.6 1295 0.69% 1.00
Central Inferred 1300 66.0 1427 0.76% 0.50
Central Inferred 1500 20.3 1572 0.84% 0.17
Central Inferred 1700 3.9 1765 0.94% 0.04
Total Inferred 500 675 998 0.53% 3.59
Total Inferred 700 500 1139 0.61% 3.03
Total Inferred 900 344 1295 0.69% 2.37
Total Inferred 1100 206 1497 0.80% 1.64
Total Inferred 1300 114 1749 0.93% 1.06
Total Inferred 1500 58.5 2109 1.12% 0.66
Total Inferred 1700 33.9 2516 1.34% 0.45
Table 7. Red Mountain MRE at various cut-off grades
Notes
• Mineral Resources are not mineable Reserves and economic viability has not been demonstrated
• There is no guarantee that any of the reported Mineral Resources will convert to Mineral Reserves
• The Mineral Resource Estimate has been prepared by Competent Person Richard Newport, principal
partner of Richard Newport & Associates – Consultant Geoscientists.
• Headline Mineral Resource Estimates are shown in bold text
• Wireframe cut-off grade and lowest block reporting cut-off grade of 500ppm is based on mining and
processing costs of $10 and $30 per tonne, respectively, a Lithium Carbonate price of $19,000 and 80%
recovery
• Mineral Resources assume open-pit mining to a nominal maximum depth of 200m below surface
• Lithium Carbonate Equivalent has been calculated from Lithium parts-per-million (ppm) by the formula
LCE (%) = Li (ppm) x 5.323 /10,000
• Reported figures are rounded and therefore may not sum to totals
13
newmurchgold.com.a
Figure 7. Northern Red Mountain drill section 4291200mN Block model and drill-holes coloured by lithium grade.
Looking northward, horizontal grid of 100m and vertical grid of 50m
Figure 8. Central Red Mountain drill section 4287780m N Block model and drill-holes coloured by lithium grade. Looking
northward, horizontal grid of 100m and vertical grid of 50m
Revised Red Mountain Exploration Target
The Company has undertaken significant exploration at the Red Mountain Project, including soil and
rock chip sampling, geological mapping of rock types, structural orientation measurements, Reverse
Circulation (RC) and diamond exploration drilling. The announcement of the maiden MRE for the Red
Mountain Lithium Project rendered the previous Exploration target redundant.As a result, the Company
has now established a revised Exploration Target, based on exploration results from across the Project
(Table 8).
The Company intends to systematically explore the Exploration Target areas through selective drilling
and rock chip sampling in 2026, and further drilling in 2027.
14
newmurchgold.com.a
The Company has calculated separate Exploration Targets for the Red Mountain claim block and Red
Mountain Extension claim block, which together form a combined Red Mountain Lithium Project
Exploration Target (Table 8). Grade ranges are provided as Lithium (ppm) and Lithium Carbonate
Equivalent weight percent (% LCE). The global Exploration Target is estimated to range from 2,020Mt to
2,690Mt at an average grade range of between 1,000 and 1,300ppm Li, or 0.53 and 0.69% LCE, for a
range of contained lithium of between 10.7 and 18.6Mt LCE.
Cautionary Statement
The potential quantity and grade of the Exploration Targets set out in Table 8 is conceptual in
nature. There has been insufficient exploration in the target areas to date to estimate a Mineral
Resource and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The Exploration Target has been prepared and reported in accordance with the 2012
edition of JORC Code.
Exploration
Target
Tonnage (Mt) Grade (ppm Li) Grade (% LCE) LCE (Mt)
Red Mountain 1,200 – 1,600 1,000 – 1,300 0.53 - 0.69% 6.39 – 11.1
Red Mtn Ext.*
816 – 1,090 1,000 – 1,300 0.53 - 0.69% 4.35 – 7.53
Project 2,020 – 2,690 1,000 – 1,300 0.53 - 0.69% 10.7 – 18.6
Table 8. Combined revised Exploration Target for the Red Mountain Lithium Project.
Note – The Red Mountain Extension Claims are located on a Wilderness Study Area which is part of a draft Nye County
Public Lands Bill that recommends this land be re-classified for multiple use, including exploration, however this requires
approval by Congress. Currently no ground disturbing exploration (i.e. drill pad preparation) is possible, however surface
sampling may be undertaken.
Basis for Exploration Target
The basis for digitising the exploration target areas is surface sample geochemistry and mapped
geology. Coherent zones of >50ppm Li anomalism in soils were digitised across rock types deemed
prospective for sedimentary lithium mineralisation, taking into account the presence of alluvium that
may mask prospective bedrock (Figure 9). These ten distinct areas range in surface area from 0.024km2
to 2.48km2
(Table 9).
To establish the upper target tonnage ranges, a nominal density of 2g/cm3
and a depth extent of 200m
was applied, with the lower tonnage range calculated as 75% of the upper tonnage range. The lower
grade range is equal to the 50th
percentile value of all 1,790 drill samples assaying ≥500ppm Li on the
Project to date (1,035ppm Li), rounded to the nearest 100ppm (1,000ppm Li)1-14
. The upper grade range
is equal to the 70th
percentile value of all drill samples assaying ≥500ppm Li on the Project to date
(1,335ppm Li), rounded to the nearest 100ppm (1,300ppm Li).
Exploration to Date
The combined Red Mountain Project has had substantial exploration to date, including two soil
sampling campaigns comprising 1,116 sample points, conducted at 400m-spaced east west lines
covering the majority of the project area, with 100m-spaced sampling points along those lines. A total
of 259 rock chip samples have been collected over several campaigns. These rock chip samples are
from outcropping or shallowly subcropping rocks.
15
newmurchgold.com.a
Exploration
Target Area
Claim Block
Tonnage
(Mt)
Grade
(ppm Li)
Grade
(% LCE)
LCE (kt)
A Red Mountain 7 - 10 1,000 – 1,300 0.53 - 0.69% 39 - 67
B Red Mountain 37 - 49 1,000 – 1,300 0.53 - 0.69% 196 - 339
C Red Mountain 27 - 35 1,000 – 1,300 0.53 - 0.69% 141 - 245
D Red Mountain 77 - 103 1,000 – 1,300 0.53 - 0.69% 411 - 712
E Red Mountain 141 - 188 1,000 – 1,300 0.53 - 0.69% 751 – 1,302
F Red Mountain 103 - 137 1,000 – 1,300 0.53 - 0.69% 548 - 950
G Red Mountain 171 - 228 1,000 – 1,300 0.53 - 0.69% 909 – 1,575
H Red Mountain 637 - 850 1,000 – 1,300 0.53 - 0.69% 3,392 – 5,879
I Red Mtn Ext. 744 - 992 1,000 – 1,300 0.53 - 0.69% 3,960 – 6,865
J Red Mtn Ext. 72 - 97 1,000 – 1,300 0.53 - 0.69% 386 - 668
Sub-total Red Mountain 1200 - 1600 1,000 – 1,300 0.53 - 0.69% 6,386 – 11,069
Sub-total Red Mtn Ext. 816 – 1,089 1,000 – 1,300 0.53 - 0.69% 4,346 – 7,533
Table 9. Exploration Target for the Red Mountain and Red Mountain Extension Claim blocks
Cautionary Statement
The potential quantity and grade of the Exploration Targets set out in Table 9 is conceptual in nature. There
has been insufficient exploration in the target areas to date to estimate a Mineral Resource and it is
uncertain if further exploration will result in the estimation of a Mineral Resource. The Exploration Target
has been prepared and reported in accordance with the 2012 edition of JORC Code.
Drilling comprising 32 diamond and RC drill-holes has been completed on the project1-14
. Two of these
holes were collared inside the digitised Exploration Target. These holes, RMRC010 and RMRC011, were
both located in Exploration Target Area H, and both intersected significant lithium mineralisation3
.
Geological mapping has been completed over the claim block area23
.
RMRC010: 33.5m @ 1,260ppm Li / 0.67% LCE from 19.8m
30.5m @ 898ppm Li / 0.48% LCE from 74.7m
RMRC011: 44.2m @ 905ppm Li / 0.48% LCE from Surface
48.8m @ 834ppm Li / 0.44% LCE from 51.8m
13.7m @ 1,260ppm Li / 0.67% LCE from 120.4m to End of Hole
16
newmurchgold.com.a
Figure 9. Rock chip geochemistry, MRE and Exploration Target Areas over gridded soil sample geochemistry image
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 9 is conceptual in nature.
There has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Target has been prepared
and reported in accordance with the 2012 edition of JORC Code.
17
newmurchgold.com.a
Red Mountain Lithium Project next steps
The Venari technical team is currently designing the next round of drilling for the Red Mountain Project,
which is anticipated to include infill drilling and extensional drilling, with a view to upgrading the
Resource category from Inferred to Indicated, and possibly some to Measured, and expanding the
Resource. In addition,the team will undertake exploration drilling to test further drill targets and identify
new zones of mineralisation for the exploration-resource pipeline. The Company intends to update the
market with firmer drilling plans in Q2 of 2026.
In 2025, the Company filed an Exploration Plan of Operations (EPO) with the Bureau of Land
Management (BLM)28
. Once approved, the EPO will increase the disturbance allowance of the Red
Mountain Project. Approval from the EPO is expected to align broadly with the commencement of the
field season.
Separately, the Company is advancing metallurgical test-work for the Red Mountain Project. With
lithium carbonate product test-work underway and results expected by the end of April, and the recent
engagement of highly-regarded engineering consultants Pitch Black Group, the Company is well placed
to advance the Project to a scoping-level flowsheet.
In the interim, additional campaigns of surface sampling will be undertaken to identify new zones of
lithium-bearing rocks within the Red Mountain Project, and the Company is considering options for
geophysical surveying to increase its understanding of the subsurface potential of the Project.
18
newmurchgold.com.a
Needles Gold Project, Nevada
The 100%-owned Needles Project comprises 216 unpatented lode mining claims covering an area of
18km2
and lies 92km east of the mining town of Tonopah in Nye County, Nevada, USA (Figure 10). The
project was acquired due to its geological similarities with bulk-tonnage gold operations in Nevada
such as the 20Moz+ Round Mountain mine.
Figure 10. Location of Needles Gold Project, and significant Nevada gold deposits
19
newmurchgold.com.a
Previously known as the Arrowhead district, the project includes numerous historical gold-silver
workings dating from the early 1900’s to 1920’s, with some of notable scale. While historical records
are sparse, the Arrowhead Mine is recorded as an incline shaft to 350ft (106.7m) with drifting on four
levels, and the Arrowhead Extension Mine was a 150ft (45.7m) two-compartment shaft with two working
levels. These operations mined bonanza-style epithermal vein gold and silver mineralisation.
Adjacent drilling has intersected gold and silver mineralisation along strike from the shaft, including:
• Needles-63 intersected 3.42m @ 2.92g/t Au and 905g/t Ag from 25.54m
• Needles-28 intersected 6.5m @ 0.95g/t Au and 235g/t Ag from 26.2m
• Needles-27 intersected 1.4m @ 1.7g/t Au and 528g/t Ag from 31.2m
• Needles-11 intersected 1.6m @ 3.8g/t Au and 546g/t Ag from 17.6m
• Needles-7 intersected 6.1m @ 1.46g/t Au and 424g/t Ag from 26m
The current project area has seen a number of previous explorers including Newcrest (2002-04), Taranis
Resources (2002-07), Excalibur Resources (2007-09) and Greenock Resources, amongst others.
Exploration drilling conducted by Venari in 2025 successfully intersected mineralised structures,
though the tenor of gold and silver grades indicated that that deeper drilling is required. Most of the
drilling to date at the project is interpreted have only tested the high-level ‘cap’ of the system (i.e the
Kaolinite and chalcedony zones in Figure 11), with greater prospectivity deeper in the system below the
extents of drilling to date.
Figure 11. Schematic diagram of a low-sulphidation epithermal deposit
20
newmurchgold.com.a
A wide zone of geochemical anomalism grading from arsenic-rich to antimony-rich with depth at the
Whopper Junior target is highly prospective. Shallow, relatively arsenic-rich rocks with deeper
antimony-rich rocks is a feature observed at the 3.4Moz Pajingo epithermal gold deposit, located in
Queensland. At Pajingo, only anomalous gold is associated with the shallow arsenic-rich zone while
ore-grade gold is associated with antimony and is deeper in the deposit.
Figure 12. September 2025 RC drill collars, main prospects and soil anomaly locations over analytic signal magnetics
demonstrating a broad zone of hydrothermally altered rocks with a low magnetic response
Airborne Magnetic Surveydata collected in 2025 identified a large zone of demagnetised rocks (see blue
and green colour zones in Figure 12), consistent with magnetite destructive alteration that would be
expected in a large-scale low-sulphidat