Two Lithium Zones Confirmed in Latest Red Mountain Drillhole
Released
Released
Announcement PDF
29 May 2025
TWO LITHIUM ZONES CONFIRMED IN LATEST DRILLHOLE AT RED MOUNTAIN PROJECT, USA
Result supports Exploration Target, successfully intersecting lithium under cover
Key Highlights
•
Diamond drill-hole RMDD005 intersected two zones of
lithium mineralisation under alluvial gravel, returning:
•
9.1m @ 1,350ppm Li from 57.9m, within a broader lowgrade zone of 80.8m @ 860ppm Li from 12.2m;
•
8.3m @ 1,210ppm Li from 240.8m to end-of-hole, within
a broader zone of 15.9m @ 955ppm Li from 233.2m to
end-of-hole
•
RMDD005 is the first drill-hole at Red Mountain to
successfully intersect ‘blind’ mineralisation.
•
Hole ended in lithium mineralisation, with the mineralised
zone remaining open down-dip to the east and along
strike.
•
Assays pending from four other recently completed drillholes.
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report assay results from the
second hole of its April 2025 diamond drilling campaign at the 100%-owned Red Mountain Lithium Project
in Nevada, USA.
Drill-hole RMDD005 returned two intersections of lithium mineralisation:
•
80.8m @ 860ppm Li / 0.46% Lithium Carbonate Equivalent1 (LCE) from 12.2m, including an
internal high-grade zone of 9.1m @ 1,349ppm Li / 0.72% LCE from 57.9m;
•
15.9m @ 955ppm Li / 0.51% LCE from 233.2m to end-of-hole, including an internal highgrade zone of 8.3m @ 1,209ppm Li / 0.64% LCE from 240.8m to end-of-hole.
Drill-hole RMDD005 is the first hole at Red Mountain to test for mineralisation interpreted as part of the
recently announced Exploration Target (ASX release 12 February 2025) under significant alluvial cover
(Figures 2 and 3). The hole was designed to test the lower extent of mineralisation in the eastern zone of
Target Area A, before passing through a zone of unmineralised rocks, and then testing a second, western
zone of interpreted mineralisation (see Figure 2). The hole successfully intersected both interpreted zones
of mineralisation, separated by a weakly mineralised sequence of mostly conglomerate and breccias.
This result reinforces the Company’s understanding of lithium mineralisation at Red Mountain, providing
further confidence in the geological model as work programs continue to progress. The more moderate
grades intersected in RMDD005, which was located centrally within the project area, also lend support to
the Company’s emerging interpretation that the northern part of the Red Mountain Project is likely to host
a high-grade zone of lithium mineralisation.
Assays are pending for a further four holes drilled as part of the April diamond drilling campaign, which
are expected to be received by the end of the financial year.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Astute Chairman, Tony Leibowitz, said:
“The results from this latest hole at Red Mountain are very encouraging, intersecting lithium
mineralisation under cover exactly where the technical team expected it to be. This provides
increased confidence in the geological model that underpins the Red Mountain Exploration Target
as we rapidly advance towards the planned delivery of a maiden JORC Mineral Resource Estimate
later this year.
“Our exploration at Red Mountain to date indicates significant scale potential, with lithium
mineralisation confirmed over a strike length of almost 6 kilometres. This latest drilling is continuing
to firm-up these results and reduce risk, successfully intersecting lithium between holes to delineate
an increasingly robust and coherent body of mineralisation.”
Background
Located in central-eastern Nevada (Figure 4) adjacent to the Grand Army of the Republic Highway
(Route 6), which links the regional mining towns of Ely and Tonopah, the Red Mountain Project was staked
by Astute in August 2023.
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the
Horse Camp Formation2. Elsewhere in the state of Nevada, equivalent rocks host large lithium deposits
(see Figure 4) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3, American Battery
Technology Corporation’s (OTCMKTS: ABML) 15.8Mt LCE Tonopah Flats deposit 4 and American Lithium’s
(TSX.V: LI) 9.79Mt LCE TLC Lithium Project 5.
Astute has completed substantial surface sampling campaigns at Red Mountain, which indicate
widespread lithium anomalism in soils and confirmed lithium mineralisation in bedrock with some
exceptional grades of up to 4,150ppm Li2,8 (Figures 2 and 3).
A total of 13 RC and diamond drill holes have been drilled at the project for a combined 1,944m, prior to
this current drilling program. These campaigns were highly successful, intersecting strong lithium
mineralisation in every hole9.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration, and proof of concept
beneficiation test-work has indicated the potential to upgrade the Red Mountain mineralisation10,11.
Figure 1. RMDD005 interpretative cross-section, lithium geochemistry and (25-35m off-section) rock chip samples
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 2. Red Mountain drill-hole intersections, gridded soil geochemistry and Exploration Targets A and B.
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 2 is conceptual in nature.
There has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Targets have been prepared
and reported in accordance with the 2012 edition of JORC Code.
The Exploration Targets have been defined through interpretation of exploration results conducted by the
Company including soil sample and rock chip geochemistry, geological mapping, structural measurements
and reverse circulation and diamond drilling. Refer to the original ASX Release dated 12 February 2025.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Results
Hole RMDD005 successfully intersected two zones of lithium mineralised rocks, with the upper zone
comprising clay-bearing siltstones and sandstones, and the lower zone comprising sandstone and
gravel conglomerates. The two mineralised zones are separated by a zone of weakly mineralised
(<500ppm Li) breccia and siltstone conglomerate (Figure 1).
The intersections are as follows:
•
80.8m @ 860ppm Li / 0.46% LCE from 12.2m to 93.0m, including an internal high-grade zone
grading 9.1m @ 1,349ppm Li / 0.72% LCE from 57.9m to 67.0m;
•
15.9m @ 955ppm Li / 0.51% LCE from 233.2m to end-of-hole (249.1m), including an internal highgrade zone grading 8.3m @ 1,209ppm Li / 0.64% LCE from 240.8m to end-of-hole (249.1m)
Interpretation
The two intersections of lithium mineralisation in RMDD005 are consistent with intersecting the eastern
and western zones of Target Area A (Figure 2). This is considered a firm validation of the Company’s
interpretation of mineralisation, given that it was intersected in an area of alluvial gravel cover, with no
proximal outcropping rocks, and no rock chip samples or drillholes within approximately 500m of the
collar of RMDD005 (Figure 3).
An emerging observation is the presence of higher-grade and, perhaps, broader intersections of lithium
mineralisation in the northern part of the Red Mountain Project. The relatively lower-grade nature of
mineralisation in RMDD005, which is located more centrally within the project, lends support to this
observation. The central part of the project had previously been sparsely drilled, with a gap of 1.69km
between hole RMRC007 and RMRC008 (Figures 2 and 3). This gap has been strategically infilled with
RMDD005 and RMDD008, the latter of which assay results are awaited.
The confirmation of mineralisation per Astute’s interpretation increases confidence in the Red Mountain
model, and the likelihood that mineralisation is continuous along the zones of interpreted mineralisation.
Hole ID
RMDD005
Easting
Northing
(NAD83)
(NAD83)
637290
4287427
RL
1714
Dip
Azimuth
Depth
(°)
(°)
(m)
-50
269
249.1
Table 1. Drill-hole collar details
Next Steps
The Company is completing core processing and awaiting assay results for the remaining four holes of
the April drilling campaign. The outcomes of this work will be integrated with surface sampling data to
assist in refining the Company’s drilling plans for the second half of 2025.
About Lithium Carbonate Equivalent (LCE)
Unlike spodumene concentrate, which is a feedstock, Lithium Carbonate is a downstream product that
may be used directly in battery production or converted to other battery products such as lithium
hydroxide.
The Benchmark Mineral Intelligence Lithium Carbonate China Index priced lithium carbonate product at
US$9,186/t6 as of 8 May 2025.
Lithium carbonate is the product of many of the most advanced lithium clay projects around the world,
including Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project 3, which is currently under
construction. Accordingly, exploration results for Red Mountain have been reported as both the standard
parts-per-million (ppm) and as % Lithium Carbonate Equivalent (LCE) 1.
A full table of assay results is provided in Appendix 2.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 3. Drill-hole locations and intersections, over interpreted geology and rock chip sample geochemistry.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 4. Location of Astute Lithium Projects, and Nevada lithium deposits.
1 Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm) x 5.323 /10,000
2 ASX: ASE 27 November 2023 ‘Outstanding Rock-Chip Assays at Red Mountain Project’
3 NYSE: LAC 31 December 2024 Updated NI 43-101 Technical Report for the Thacker Pass Project
4 OTCMKTS: ABML 26 February 2023 ‘Technical Report Summary for The Tonopah Flats Lithium Project, Esmeralda.’
5 TSX.V: LI 17 March 2023 ‘Tonopah Lithium Claims project NI 43-101 technical report – Preliminary Economic Assessment’
6 Source: Benchmark Mineral Intelligence – Lithium Carbonate China Index 12/06/2024
7 ASX: ASE 16 December 2024 ‘Major new zones of Lithium Mineralisation at Red Mountain Project’
8 ASX: ASE 8 July 2024 ‘High-grade rock chip assays extend prospective lithium horizon at Red Mountain Project, USA’
9 ASX: ASE 20 January 2025 ‘Extension of lithium discovery at Red Mountain Project’
10 ASX: ASE 9 December 2024 ‘Positive initial metallurgical results from Red Mountain’
11 ASX: ASE 22 April 2025 ‘Beneficiation testwork successfully upgrades mineralisation at Red Mountain Lithium Project’
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Authorisation
This announcement has been authorised for release by the Board of Astute.
Astute Metals NL Interactive Investor Hub
Engage with Astute Metals through accessing reports, presentations, interviews and
other Company content.
Ask questions and browse responses to other investors’ questions
Click on https://astutemetals.com/auth/signup and follow the prompts to sign up
More Information
Matt Healy
Executive Director & CEO
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr. Healy is a full-time employee
of Astute Metals NL and is eligible to participate in a Loan Funded Share incentive plan of the Company.
Mr. Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Healy consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
Exploration Targets
The information in this report that relates to Exploration Targets is based on information compiled by Mr.
Richard Newport, principal partner of Richard Newport & Associates – Consultant Geoscientists. Mr.
Newport is a member of the Australian Institute of Geoscientists and has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person under the 2012 Edition of the ’Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves‘. Mr. Newport consents to the
inclusion in this announcement of the matters based on this information in the form and context in which
it appears.
The initial exploration target included this release was originally announced on 12 February 2025 and
has been wholly based on previously announced exploration results for the Red Mountain Project. The
ASX releases for these results, including the relevant JORC Table 1 disclosures, are listed as follows:
•
ASX: ASE 20 November 2023 ‘Large lithium soil anomalies discovered at Red Mountain’
•
ASX: ASE 27 November 2023 ‘Outstanding Rock-Chip Assays at Red Mountain Project’
•
ASX: ASE 18 June 2024 ‘Significant Lithium discovery at Red Mountain Project’
•
ASX: ASE 8 July 2024 ‘High-grade rock chip assays extend prospective lithium horizon at Red
Mountain Project, USA’
•
ASX: ASE 22 July 2024 ‘Further high-grade intersections at Red Mountain’
•
ASX: ASE 7 August 2024 ‘Receipt of final assays for the Red Mountain Project’
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
•
ASX: ASE 9 December 2024 ‘Positive initial metallurgical results from Red Mountain’
•
ASX: ASE 16 December 2024 ‘Major new zones of Lithium Mineralisation at Red Mountain Project’
•
ASX: ASE 20 January 2025 ‘Extension of Lithium Discovery at Red Mountain Project’
•
ASX: ASE 4 February 2025 ‘Geological mapping and further rock chips enhance Red Mountain
Lithium Project, USA’
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialisedindustry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheldXRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
HQ diamond drilling was undertaken for drill
sample collection. Samples were collected on
a nominal 5-foot basis or sampled to
geological boundaries based on lithological
logging. Samples were photographed, halfcored, and despatched to an external lab by
an external contractor.
Include reference to measures taken to
ensuresample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation thatare Material to the Public
Report.
Claystone hosted lithium deposits are thought to
form as a result of the weathering of
lithium-bearing volcanic glass within
tertiary-aged tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of lithium from
geothermal sources have also been proposed.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, suchas where there is
coarse gold that has inherentsampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openholehammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
HQ drilling methods employed. Core was not
oriented for this drill hole.
Drill sample
recovery
Method of recording and assessing core
andchip sample recoveries and results
assessed.
Sample recovery established by recovery
logging and dry sample weights undertaken
by independent laboratory prior to sample
preparation and analysis
Measures taken to maximise sample
recoveryand ensure representative nature
of the samples.
Logging
Poor drill core recovery at surface and one section
of core loss at end of hole.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gainof fine/coarse material.
Instances of poor recovery are not expected
tomaterially impact interpretation of results
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Drill core for the entire hole was logged for
lithology bycompany geologists
Whether logging is qualitative or quantitative
innature. Core (or costean, channel, etc.)
photography.
Logging is qualitative
Photography of drill core undertaken by
contractors in Elko, NV, prior to delivery to
external laboratory
The total length and percentage of the
relevantintersections logged.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and
sample
preparatio
n
If core, whether cut or sawn and whether
quarter, half or all core taken.
Core half cored at a third part contractor
facility in Elko, NV, and submitted to ALS
Laboratories in Elko for preparation and
analysis.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness
of
the
sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the sampling
isrepresentative of the in-situ material
collected,including for instance results for field
duplicate/second-half sampling.
Quality of
assay
data and
laboratory
tests
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used
and whether the technique is considered
partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the parameters
used in determining the analysis including
instrument make and model, reading times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precisionhave been established.
Verification
of
sampling
and
assaying
A comparison of aqua-regia and 4-acid
digests was undertaken for Red Mountain
mineralisation, with no material difference in
lithium results identified.
Assay quality was monitored using pulp blanks,
as well as certified reference materials (CRMs)
at a range of lithium grades. Pulp blank results
indicated no material contamination of
samples from sample preparation or during the
analytical process. CRM results were within 3
standard deviations of certified values. No
material systematic bias nor other accuracy
related issues were identified.
The verification of significant intersections by
either independent or alternative company
personnel.
Sample intervals to be assigned a unique
sample identification number prior to sample
despatch
The use of twinned holes.
Lithium-mineralised claystone Certified
Reference Materials (standards), pulp
blanks and coarse blanks to be inserted into
the sample stream at regular intervals to
monitor lab accuracy and potential
contamination during sample prep and
analysis
Documentation of primary data, data
entry procedures, data verification, data
storage (physical
and
electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Samples analysed by method ME-MS61 which is
an ICP-MS method employing a 4-acid digest.
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar locations determined using handheld GPS with location reported in NAD83 UTM
Zone 11. Expected hole location accuracy of +/10m
Downhole survey data yet to be validated.
For the purposes of drill sections, drill holes
have been plotted at the setup azimuth of
270° (Grid). This is not expected to make a
material difference to interpretation of
results.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing is appropriate for early exploration
purposes
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
MineralResource and Ore Reserve estimation
procedure(s) and classifications applied.
5-foot sample interval, or to geological
boundaries where appropriate, widely adopted
as standard practice in drilling in the USA.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
Claystone beds are regionally shallow-dipping at
~20°-45° to the east and varying locally across
the Project with some evidence of faulting and
potential folding
Sample
security
The measures taken to ensure sample security.
Samples stored at secure yard and shed located
in township of Currant until delivered by staff or
contractors to the core processing contractors at
Elko, and then to ALS lab at Elko, NV
Audits or
reviews
The results of any audits or reviews of
samplingtechniques and data.
Not applicable
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
Red Mountain Claims held in 100% Astute
subsidiary Needles Holdings Inc.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration
byother parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified by the
Bureau of Land Management (BLM)
No known previous lithium exploration
conducted at Red Mountain
Exploration conducted elsewhere in Nevada by
other explorers referenced in announcement
body text
The principal target deposit style is claystone
hosted lithium mineralisation. Claystone hosted
lithium deposits are thought to form as a result of
the weathering of lithium-bearing volcanic glass
within tertiary-aged tuffaceous lacustrine
sediments of the mapped Ts3 unit.
Lacustrine environments formed as a result of
extensional tectonic regime that produced ‘basin
and range’ topography observed across the
stateof Nevada. Inputs of lithium from
geothermal sources have also been proposed.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
◦ easting and northing of the drill hole collar
◦ elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
◦ dip and azimuth of the hole
◦ down hole length and interception depth
◦ hole length.
Drillhole locations, orientations and drilled
depths are tabulated in body report
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations should
be shownin detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Intersections, where quoted are weighted by
length. Lengths originally recorded in feet are
quoted to the nearest 10cm.
Rounding is conducted to 3 significant figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance for 10ft of
internal dilution by lower grade material.
Low grade mineralisation (300-500ppm Li) is
present outside of the quoted intersections
Intersections are quoted in both lithium ppm and
as wt% Lithium Carbonate Equivalent (LCE). LCE is
calculated as LCE = Li (ppm) x 5.323 / 10,000, as
per industry conventions.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
Insufficient information available due to early
exploration status, although interpretation to
date is that intersections in this hole
approximate true width.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
notknown’).
Diagrams
Appropriate maps and sections (with scales)
andtabulations of intercepts should be included
for any significant discovery being reported
These should include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Included in ASX announcement
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
This release describes all relevant information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysicalsurvey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
This
Share your feedback
Discover