30 September 2026 Quarterly Report
Red Mountain development and growth strategy gains momentum with advancement of high-
value by-product strategy, in-fill drilling and Exploration Plan of Operations; Georgina
divestment sharpens focus; Successful $6.1m capital raise
Highlights
Red Mountain Lithium Project, Nevada (USA)
• By-Product Strategy Advanced:
o Potential to recover strontium and magnesium by-products alongside lithium
carbonate identified at the Red Mountain Project.
o Strontium has been declared a Strategic Material by the US Department of War
due to its use in tracer ordnance and flares. The US is 100% import-dependent.
o Magnesium is a US Department of Energy Critical Mineral with a rapidly growing
global market. The US is 59% import-dependent for magnesium compounds.
o Venari’s systematic strategy to create value from by-products includes:
▪ Addition of strontium and magnesium to the Project Mineral Resource Estimate;
▪ Metallurgical testing to extract by-products from leachate and/or residues;
▪ Engaging with US Government support programs for critical and strategic
minerals such as grant funding and fast-tracked permitting.
• In-fill drilling campaign commenced targeting the high-grade northern area of the Project:
o Diamond drilling commenced at the Red Mountain Project.
o 12-hole, 3,360m diamond drilling campaign designed to upgrade the high-grade
northern sector of the Mineral Resource Estimate (MRE) from Inferred to the higher-
confidence Indicated category, in accordance with the JORC (2012) Code.
o Updated MRE expected to underpin a Q1 2027 Scoping Study.
• Exploration Plan of Operations (EPO) to Fast-Track Exploration and Resource Expansion:
o Near-complete Exploration Plan of Operations (‘EPO’) to increase the Red Mountain
drilling footprint sevenfold from 5 acres currently to 35 acres.
o Once approved, the EPO will support a broader exploration program, including the
ability to progress Mineral Resource expansion, Mineral Resource JORC category
upgrades, and Exploration drilling of the Project’s substantial Exploration Target.
Corporate
o Highly successful $6.1 million capital raising completed, including a $1.35 million
Convertible Note that will convert into ordinary shares in the Company over two-year
period, allowing the Company to progress the next phase of work at Red Mountain,
culminating in a Scoping Study.
o Sale of the Georgina Basin IOCG asset in Australia further simplifies the Company’s
asset base, allowing it to concentrate on its flagship Red Mountain Lithium Project.
Sale realized $0.66 million and reduces the Company’s ongoing holding costs.
2
newmurchgold.com.a
Venari Minerals NL (ASX: VMS) (“Venari”, “the Company” or “VMS”) is pleased to present its activities
for the quarter ended 30 September 2026.
Red Mountain Lithium Project, Nevada
The Red Mountain Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known
locally as the Horse Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium
deposits (see Figure 1) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project and
American Battery Technology Corporation’s (NASDAQ: ABAT) 18.7Mt LCE Tonopah Flats deposit.
Prior to the drilling campaign that commenced during the quarter, a total of 32 drill holes had been
completed at the project for a combined 6,015m. These campaigns have been highly successful,
intersecting strong lithium mineralisation in almost every hole.
The Red Mountain maiden Mineral Resource Estimate of 500Mt @ 1,139ppm Li for 3.03Mt contained
LCE (at a 700ppm Li cut-off) includes a high-grade zone in the north of the project of 47.9Mt @
2,193ppm Li for 559kt contained LCE, at a 1,300ppm Li cut-off.
Figure 1. Location of Venari’s Red Mountain Lithium Project and other Nevada lithium deposits.
3
newmurchgold.com.a
Scoping leachability test-work on mineralised material from Red Mountain indicates high leachability
of lithium of up to 98%, varying with temperature, acid strength and leaching duration, while
beneficiation test-work has indicated the potential to upgrade the Red Mountain mineralisation. The
project has produced a high-purity (99.5%) battery-grade lithium carbonate directly from mineralised
rocks, with no third-party processing requirement.
The Red Mountain project is well-serviced by infrastructure, being located immediately adjacent to the
transcontinental Route 6, 20km west of a 525kV high-voltage transmission line and a 113-acre private
property with 592,000m3
.p.a of associated water rights secured only 6km from the Project (Figure 2).
Figure 2. The Red Mountain Lithium Project is well-serviced by road and power with nearby private water rights secured.
4
newmurchgold.com.a
Work completed during the quarter
By-product Strategy Advanced
During the quarter, the Company outlined its strategy to evaluate and potentially commercialise
strontium and magnesium by-products from the Red Mountain Project.
Recent metallurgical test work, undertaken as part of the Company’s lithium process development
program, identified the presence of magnesium and strontium within the sulfuric acid leach circuit,
alongside the production of battery-grade lithium carbonate.
While further metallurgical and economic evaluation is required, these minerals have the potential to
provide additional revenue streams, improve overall resource utilisation and reduce waste, improve
ESG credentials, and further strengthen the strategic positioning of the Red Mountain Project within the
US critical minerals supply chain – particularly for defence-critical strontium.
The Company has commenced a structured program to assess the commercial potential of these by-
products through additional metallurgical testing, incorporation into the next Mineral Resource
Estimate update and evaluation as part of the planned Scoping Study due in Q1 2027.
Strontium – a strategic defence material
Strontium is used in defence applications such as tracers in ordnance, flares, as well as in other
pyrotechnics,alloys,ceramics,glasses and nuclear batteries.Strontium is listed as a strategicmaterial
on the Strategic Materials of Interest list of the Defense Logistics Agency or DLA (the US’ logistics
combat support agency of the Department of War).
The global strontium market volumes are in the order of several hundred thousand tonnes per year
(various estimates place global demand in the 300–600kt range depending on scope and year), and US
demand typically runs into the tens of thousands of tonnes range when including processed forms.
Strontium carbonate, the common processed form of Strontium, typically commands a price of
US$2,000 per tonne landed in the US, however higher purity products can sell for over $14,000/t.
The United States is 100% net import reliant for strontium, and the National Defense Authorisation Act
of 2023 mandates domestic US (or select ally country) sourcing of defence-related chemicals,
including strontium compounds, by 2028, creating an incentive to establish domestic sources of
strontium to feed into critical defence supply chains.
This in turn creates the potential for premium offtake rates, government support, and/or defence
contractor partnerships. The incentive to establish domestic supply in the US is compounded by supply
concentration risks, with major producers including China, Mexico, Spain and Iran.
This creates a compelling strategic opportunity for Venari. The potential to establish domestic US
production from a Nevada lithium operation offers clear logistical and geopolitical advantages.
5
newmurchgold.com.a
Magnesium – a US Critical Mineral
Magnesium is listedon the currentUS Departmentof EnergyCritical Minerals list.Magnesiumhasmany
uses: in the metal form, it is used to reduce weight in vehicles and as the hydrated sulfate compound –
Epsomite – has diversified uses including in fertilizers, pharmaceuticals and industrial water treatment
as a flocculant.
The magnesium sulfate market is 2.7 million tonnes annually, of which the North American share is
estimated at 25%, and is expected to grow to 3.7Mt by 2034. The US currently imports 59% of its
magnesium sulfate, mainly from China. Epsomite prices in the US have ranged from US $370-430/t in
the past year11
, indicating a compelling incentive for the Company to further investigate this potentially
valuable by-product, particularly when the production of lithium carbonate already necessitates
magnesium removal.
Creating Value
The integration of by-product streams into Venari’s development strategy for the Red Mountain Lithium
Project offers multiple opportunities to extract value:
Revenue Diversification and Economics: By-products have the potential to contribute meaningfully to
future project cash flows, reducing the effective cost of lithium production and improving overall
returns.
Strategic and Geopolitical Positioning: Strontium production directly addresses US strategic mineral
vulnerabilities and defence supply chain mandates.This has the potential to attract offtake agreements
with US government entities and defence contractors, as well as adding potential eligibility for grants,
tax incentives, or fast-tracked permitting under critical minerals policies.
Operational Synergies: By-product recovery reduces waste volumes sent to tailings, improves resource
utilisation and strengthens the project’s sustainability profile.
Processing Integration: Lithium leach circuits (acid-based or otherwise) can generate magnesium- and
strontium-bearing solutions or residues. Targeted separation (e.g., precipitation, crystallisation) can be
engineered into the flowsheet with relatively incremental capital, leveraging existing infrastructure.
Risk Mitigation: Commodity price and market risk is spread across lithium (battery/EV focus) and other
industrial/strategic minerals.
A systematic approach
The Company will systematically evaluate and advance the by-product potential of Red Mountain:
1. Metallurgical test-work (2026): Conduct dedicated testwork to quantify recoverable
grades/yields of strontium and magnesium compounds, with a focus on achieving commercial-
grade specifications (e.g., purity for defence, agricultural use). Test-work will consider
potentially extracting by-products in various forms from leachate/residue according to whether
lithium is extracted by sulfuric acid, hydrochloric acid, etc. Other potential by-products may be
identified as a result of this test-work.
6
newmurchgold.com.a
2. Addition to Mineral Resource Estimates (2026): Incorporate strontium and magnesium into
the current Inferred category MRE to define potential by-product tonnages and grades.
3. Funding and Partnerships: Explore strategic partnerships or offtake-linked financing. Engage
with US government support programs targeting critical minerals and domestic processing
(ongoing).
4. Economic Studies: Include by-product scenarios in the upcoming Scoping Study (Q1 2027).
The identification of strontium and epsomite by-products at Red Mountain significantly enhances the
project’s attractiveness. Strontium offers high strategic upside aligned with US national security
priorities, while magnesium sulfate benefits from stable, diversified industrial demand. Together, they
support a more robust, lower-risk, and higher-value development pathway.
In-fill Diamond Drilling Campaign Commences
During the quarter, a key in-fill drilling campaign commenced at Red Mountain (Figure 3). The 12-hole,
3,360m (Table 1) diamond drilling campaign is being undertaken at the high-grade northern end of the
Project (Figure 4) in order to upgrade this part of the MRE from Inferred to the higher-confidence
Indicated category in accordance with the JORC (2012) Code.
The upgraded MRE will form the foundation of the Company’s maiden Scoping Study, targeted for
completion in Q1 2027. The study will assess the development potential of the Red Mountain Project as
a significant US critical and strategic minerals project positioned to contribute to domestic US lithium
supply and reduce reliance on imports.
Figure 3. Diamond drill rig set up over drill-hole RMDD009 (Plan ID RMP006).
7
newmurchgold.com.a
Plan ID Site ID
East
(WGS84)
North
(WGS84)
RL (m) Azimuth
(°)
Dip
(°)
Depth
(m)
RMP001 RMS036 637512 4290986 1729 270 -50 325
RMP010 RMS036 637512 4290986 1729 0 -90 355
RMP002 RMS037 637596 4290842 1731 270 -50 355
RMP009 RMS037 637596 4290842 1731 270 -80 380
RMP006 RMS038 637349 4290424 1719 270 -50 200
RMP007 RMS038 637349 4290424 1719 90 -65 325
RMP008 RMS038 637349 4290424 1719 190 -50 465
RMP005 RMS039 637139 4291447 1705 270 -50 125
RMP011 RMS039 637139 4291447 1705 90 -80 155
RMP012 RMS039 637139 4291447 1705 90 -50 305
RMP003 RMS040 637168 4291042 1716 270 -50 145
RMP004 RMS041 637347 4290864 1719 270 -50 225
Table 1. Red Mountain Project planned diamond drill-hole details
8
newmurchgold.com.a
Figure 4. Recently permitted drill sites and previous drilling over MRE block model coloured by lithium cut-off grade.
9
newmurchgold.com.a
Exploration Plan of Operations to Fast-Track Exploration and Resource Expansion
Since the discovery hole was drilled at the Red Mountain Project in April 2024, the Company has
permitted a total of 44 drill-holes across five drilling campaigns, including the campaign currently
underway. This rapid advancement of exploration has resulted in the Company utilising 4.75 of the
Project’s 5-acre limit of disturbance under Notice-level permitting. As a result, in 2025 the Company
filed an Exploration Plan of Operations with the Bureau of Land Management (BLM), which included a
proposed 100-acre disturbance, conducted in two phases. The first phase comprises a series of 17
east-west drill traverses spanning the full strike length of the Project (Figure 5), including 124 drill sites
and totalling 35 acres of new disturbance allowance.
These drill traverses are 60m wide and mostly spaced at 400m intervals, allowing excellent flexibility
for exploration drilling and drill spacing sufficient to support JORC Indicated category Mineral
Resources, as well as opening up additional expansion areas for exploration drill testing of the
substantial Exploration Target of 10.7 – 18.6Mt contained LCE (Figure 5, Table 2). The second phase of
the EPO will open up exploration areas between the drill traverses and allow for comprehensive in-fill
drilling to be undertaken to support future feasibility-level study work.
During the quarter, the EPO was issued for public notice. This is a key milestone in the permitting
pathway to expand the Project’s authorised surface disturbance beyond the current Notice-level limit
of five acres. Subject to completion of the public notice process and receipt of the required approvals,
the expanded disturbance allowance of the EPO will support systematic drill testing of the Project’s
substantial JORC Exploration Target areas (Figure 5, Table 2), with the objective of advancing targets
into discoveries and ultimately into additional Mineral Resources to expand the Project Mineral
Resource Estimate.
The Company considers this an important step in advancing Red Mountain to the next stage of project
definition. Venari expects the Plan of Operations to be in place by the end of 2026. The timing of
approvals remains subject to the public notice process and the relevant regulatory agencies.
Cautionary Statement
The potential quantity and grade of the Exploration Targets set out in Table 2 is conceptual in
nature. There has been insufficient exploration in the target areas to date, to estimate a Mineral
Resource and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The Exploration Target has been prepared and reported in accordance with the 2012
edition of JORC Code.
Exploration
Target
Tonnage (Mt) Grade (ppm Li) Grade (% LCE) LCE (Mt)
Red Mountain 1,200 – 1,600 1,000 – 1,300 0.53 - 0.69% 6.39 – 11.1
Red Mtn Ext.*
816 – 1,090 1,000 – 1,300 0.53 - 0.69% 4.35 – 7.53
Project 2,020 – 2,690 1,000 – 1,300 0.53 - 0.69% 10.7 – 18.6
Table 2. Combined Exploration Target for the Red Mountain Lithium and Strategic Minerals Project.
Note – The Red Mountain Extension Claims are located on a Wilderness Study Area which is part of a draft Nye County
Public Lands Bill that recommends this land be re-classified for multiple use, including exploration, however this requires
approval by Congress. Currently no ground disturbing exploration (i.e. drill pad preparation) is possible, however surface
sampling may be undertaken.
10
newmurchgold.com.a
Figure 5. Plan of Operations: Phase 1 disturbance areas, Mineral Resource Estimate extents and Exploration Target.
Cautionary Statement
The potential quantity and grade of the Exploration Targets presented in Figure 5 is conceptual in nature.
There has been insufficient exploration to date to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Target has been prepared
and reported in accordance with the 2012 edition of JORC Code. Refer to original 18 Feb 2026 ASX release.
11
newmurchgold.com.a
Needles Gold Project, Nevada
The 100%-owned Needles Project comprises 216 unpatented lode mining claims covering an area of
18km2
and lies 92km east of the mining town of Tonopah in Nye County, Nevada, USA (Figure 6). The
project was acquired due to its geological similarities with bulk-tonnage gold operations in Nevada
such as the 20Moz+ Round Mountain mine.
Figure 6. Location of Needles Gold Project and significant Nevada gold deposits.
12
newmurchgold.com.a
Previously known as the Arrowhead district, the Needles Gold Project includes numerous historical
gold-silver workings dating from the early 1900’s to 1920’s, with some of notable scale. While historical
records are sparse, the Arrowhead Mine is recorded as an incline shaft to 350ft (106.7m) with drifting
on four levels, and the Arrowhead Extension Mine was a 150ft (45.7m) two-compartment shaft with two
working levels. These operations mined bonanza-style epithermal vein gold and silver mineralisation.
Adjacent drilling has intersected gold and silver mineralisation along strike from the shaft, including:
• Needles-63 intersected 3.42m @ 2.92g/t Au and 905g/t Ag from 25.54m
• Needles-28 intersected 6.5m @ 0.95g/t Au and 235g/t Ag from 26.2m
• Needles-27 intersected 1.4m @ 1.7g/t Au and 528g/t Ag from 31.2m
• Needles-11 intersected 1.6m @ 3.8g/t Au and 546g/t Ag from 17.6m
• Needles-7 intersected 6.1m @ 1.46g/t Au and 424g/t Ag from 26m
The current project area has seen a number of previous explorers including Newcrest (2002-04), Taranis
Resources (2002-07), Excalibur Resources (2007-09) and Greenock Resources, amongst others.
Exploration drilling conducted by Venari in 2025 successfully intersected mineralised structures,
although the tenor of gold and silver grades indicated that deeper drilling is required. Most of the drilling
to date at theproject is interpreted to have only tested the high-level ‘cap’ of the system (i.e the Kaolinite
and chalcedony zones in Figure 7), with greater prospectivity deeper in the system below the extents of
drilling to date.
Figure 7. Schematic diagram of a low-sulphidation epithermal deposit.
13
newmurchgold.com.a
A wide zone of geochemical anomalism grading from arsenic-rich to antimony-rich with depth at the
Whopper Junior target is highly prospective. Shallow, relatively arsenic-rich rocks with deeper
antimony-rich rocks is a feature observed at the 3.4Moz Pajingo epithermal gold deposit, located in
Queensland. At Pajingo, only anomalous gold is associated with the shallow arsenic-rich zone while
ore-grade gold is associated with antimony and is deeper in the deposit.
Figure 8. September 2025 RC drill collars, main prospects and soil anomaly locations over analytic signal magnetics
demonstrating a broad zone of hydrothermally altered rocks with a low magnetic response.
Airborne Magnetic Surveydata collected in 2025 identified a large zone of demagnetised rocks (see blue
and green colour zones in Figure 8), consistent with magnetite destructive alteration that would be
expected in a large-scale low-sulphidation epithermal system.
14
newmurchgold.com.a
An 820-point 2025 soil sampling campaign resulted in the identification of a number of strong multi-
element soil anomalies bearing key geochemical characteristics of large-scale epithermal gold-silver
systems that are all untested by exploration drilling. Figure 9 and Figure 10 show the location of the
identified anomalies, with gold and antimony geochemistry, respectively.
Figure 9. Gridded gold soil sample geochemistry, major prospects, drill collars and anomaly locations.
15
newmurchgold.com.a
Figure 10. Gridded antimony soil sample geochemistry, major prospects, drill collars and anomaly locations.
Work completed during the quarter
No work was completed during the quarter for the Needles Gold Project.
16
newmurchgold.com.a
Governor Broome Mineral Sands Project, WA
The 100%-owned Governor Broome Mineral Sands Project is located approximately 95km by sealed
road south of Busselton in Western Australia, 105km south of Iluka’s processing plant at Capel, and
135km from Bunbury Port and from Picton, where Doral has a heavy mineral separation plant (Figure
11). A 132kV power line is located just 5km to the north and a three-phase power line passes through
the Governor Broome Project, giving it significant strategic advantages from an infrastructure and
access perspective.
Tenement Category Tonnage (Mt) HM (%) Slimes (%)
R70/58
Jack Track
Measured 20.2 4.2 8.4
Indicated 21 3.5 7.9
Total 41 3.9 8.2
R70/53
Governor Broome
Measured 8.0 5.0 13
Indicated 44 5.0 13
Inferred 7 3.5 12
Total 59 4.8 12.5
R70/22
Fouracres
Indicated 0.72 11.4 6.5
Inferred 0.2 3.5 9
Total 0.93 9.6 7.1
Project
Measured 28.4 4.4 9.7
Indicated 66 4.5 12
Inferred 7 3.5 12
Total 101 4.5 11
Table 3. Governor Broome Project Mineral Resources – at a 2% HM lower block-cut-off grade
Note that the above figures have been appropriately rounded.
The Fouracres Resources estimated at a 3% Heavy Mineral (HM) lower block-cut-off grade
Governor Broome and Jack Track Resources estimated at a 2% HM lower block-cut-off grade
The Company has progressed its de-risking strategy for the Governor Broome Project over the past two
years, with the successful execution of in-fill drilling allowing for the upgrade of Inferred Mineral
Resources to high-value Measured and Indicated status (Table 3), the acquisition of the high-grade
Fouracres deposit, located along strike from Jack Track, and the completion of a bulk test-work
program on samples from the most recent Jack Track drilling campaign.
The bulk test-work program was highly successful, demonstrating the amenability of the Jack Track
Deposit to processing through the feed preparation circuit using conventional mineral sands
processing equipment. The material was processed without difficulty with the sand fraction containing
the valuable heavy minerals (Heavy Mineral Concentrate/HMC) readily liberated from the slimes
without the need for energy intensive processing equipment.
Furthermore, subsequent dry test-work demonstrated that a range of ilmenite, leucoxene, rutile and
zircon products could be recovered from the heavy mineral concentrate.
17
newmurchgold.com.a
Monazite was also recovered to a para-magnetic concentrate stream. Product qualities are consistent
with other heavy mineral products on the market.
Scoping Study
In April 2024, the Company announced the results from the Scoping Study for the Governor Broome
Project and the financial metrics from the Study were exceptionally positive, as tabulated below:
Metric Unit Value
Capital cost A$ million 91
Average annual revenue A$ million 125
Average annual operating cost A$ million 83
Pre-tax NPV (at 10% discount rate) A$ million 139
Pre-tax IRR % 54
Weighted average revenue to cash cost ratio (payback period) - 1.9
Capital Payback Period Years <2
Table 4. Scoping Study material outputs
The full release for the Scoping Study, including detailed assumptions, results and Cautionary
Statements is available in the ASX Announcement dated 4 April 2024.
The Company confirms that all material assumptions underpinning the production targets and
forecast financial information derived from the Scoping Study results in the 4 April 2024 release
continue to apply and have not materially changed.
Figure 11. Governor Broome Project Location, WA.
18
newmurchgold.com.a
Work During the Quarter
No work was undertaken during the quarter on the Governor Broome Project. The Company continues
to actively investigate its options for realising value from the Project, including through potential joint
ventures, an outright trade sale and other avenues.
Georgina Basin IOCG Project, Northern Territory
On 7 July 2026,the Company entered into a conditionalsale of its 100% shareholding in Knox Resources
Pty Ltd (Knox), the owner of the Georgina Basin project and the sale was completed on the 16 July 2026.
Further details of the sale can be found in the corporate section below.
Corporate
Two-Tranche Capital Raising and Convertible Note
On 20 July 2026, the Company announced firm commitments for an oversubscribed, Company-led
capital raising of $6.1 million (before costs), comprising a $4.75 million two-tranche share placement
(Placement) and a $1.35 million convertible note (Convertible Note).
The funds received from the capital raising are being applied to advance the Red Mountain Project,
including undertaking in-fill and extensional drilling, the addition of strontium and magnesium by-
products to the Mineral Resource Estimate and the delivery of a Scoping Study, targeted for Q1 2027.
The details of each component of the capital raising initiative were as follows:
(a) Placement
The Placement comprised 59,375,000 fully paid ordinary shares at $0.08 per share, issued to high
net worth, institutional and sophisticated investors. The issue price represented a 5.9% discount to
the last traded price of $0.085 and a 22.1% discount to the 15-day VWAP of $0.1028.
Participants were also entitled to one free attaching option for every ten shares subscribed,
exercisable at $0.12 with a term of two years (Placement Options).
Tranche Shares Amount raised Issue date Approval basis
Tranche 1 22,095,000 $1,767,600 31 July 2026
Listing Rules 7.1 and 7.1A
capacity
Tranche 2 37,280,000 $2,982,400
25 September
2026
Shareholder approval, 11
September 2026
Total 59,375,000 $4,750,000
Table 5. Venari Minerals NL Two Tranche Placement, announced on 20 July 2026
19
newmurchgold.com.a
Tranche 2 included participation by the Company's Directors, being Mr Tony Leibowitz for $161,000
(2,012,500 shares), Mr Vincent Fayad for $80,000 (1,000,000 shares) and Mr Matthew Healy for
$20,000 (250,000 shares).
Following the completion of Tranche 2 of the placement, the capital structure of the Company was
as follows:
Security ASX code Number (undiluted) Number (Fully diluted)
Fully paid ordinary shares VMS 168,091,637 195,185,7971
Listed options (exercise
price $0.12, expiring 6
August 2028)
VMSOA 10,219,160 Nil2
Unlisted options (exercise
price $0.30, expiring 26
September 2028)
VMSAU 3,000,000 3,000,0003
Performance rights
(expiring 7 April 2028)
VMSAA -
VMSAD
3,812,000 3,812,0004
Convertible note (face
value $1,350,000)
- 1 Nil5
Table 6. Capital structure after the Venari Minerals July 2026 Placement
Notes regarding the ‘Fully Diluted’ basis in Table 6
1. The expanded number of shares has been based on the following:
(a) See note 2 below for the exercise of the listed Options; and
(b) see note 5 below for the conversion of the Convertible Notes.
2. Assumes that the listed Options are exercised given the remaining time to expiry (6 August 2028) and
the VMSOA trading price of $0.04 per listed Option, notwithstanding that the share price of $0.10 as
at 30 September 2026 is below the exercise price of $0.12 per listed Option.
3. Based on a share price of $0.10 as at 30 September 2026, exercise price of $0.30 per share is well
“out of the money”.
4. Performance Rights are assumed not converted into fully paid ordinary shares as the milestone
hurdles are $0.80, $1.20 $1.60 and $2.00 and are well above the share price of $0.10 at 30
September 2026.
5. As set out in note (b) below, the Convertible Notes are repayable by way of issue of ordinary shares
every six months to the noteholder. Assuming that all of the Convertible Notes are repaid as at 30
September 2026, this would result in the issue of 16,875,000 fully paid shares. The interest that
accumulates on the Convertible Notes is assumed to be paid in cash by the Company.
20
newmurchgold.com.a
(b) Convertible Note
The $1.35 million Convertible Note was subscribed for by a high-net-worth investor, with funds
received on 30 July 2026. Key terms were as follows:
• Term: 2 years, unsecured.
• Interest: 8% per annum, payable at the end of the term in cash or shares at the noteholder's
election.
• Repayment: every six months by the issue of shares at a fixed price of $0.08, each issue equal
to 3% of the Company's issued capital. The expected timeperiod to convert into ordinary shares
of the Company is two years.
• Application fee: 1,687,500 options on the same terms as the Placement Options.
• Early repayment: immediately repayable on a takeover of the Company, a sale of the Red
Mountain Project or other specified corporate action.
The issue of the Convertible Note and the application fee options was approved by shareholders on
11 September 2026 at the Company’s General Meeting.
Loyalty Options
In recognition of existing shareholder support, the Company offered eligible shareholders one
Loyalty Option for every ten shares held at the record da