Thick Lithium Claystone Host-Rocks Intersected at Altair
Released
Released
Announcement PDF
28 July 2023
THICK LITHIUM CLAYSTONE HOST-
ROCKS INTERSECTED AT ALTAIR, USA
Drilling hits wide zones of Siebert formation, a key regional
host rock for claystone-hosted lithium deposits
Key Highlights
•
109.7m (360ft) of prospective Siebert formation claystone
intersected in the first Altair Project drill hole, AL01.
•
59.4m (195ft) of Siebert formation claystone intersected
in Polaris redrill hole PL04A
•
The Siebert formation hosts large claystone lithium
deposits in the region, including:
•
•
American Battery Technology Corporation’s
(OTCMKTS: ABML) 15.8Mt Lithium Carbonate
Equivalent (LCE) Inferred category Tonopah Flats
Lithium Clay Deposit1
•
American Lithium Corporation’s (TSX.V: LI) 9.79Mt LCE
Measured and Indicated TLC Lithium Project2
Samples to be dispatched shortly for assay at ALS
Laboratories Reno, with results expected by early to midSeptember.
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to advise of continued success
in its maiden lithium drilling program in Nevada, USA with a thick 109.7m intersection of prospective
Siebert Formation claystone – the main prospective host rock for lithium claystone deposits in the region
– in its first drill-hole at the Altair Project, and a thicker intersection of claystone at Polaris hole PL04A
following a successful re-drill of this hole.
Astute’s Executive Chairman, Tony Leibowitz, said:
“Our lithium exploration strategy in North America is beginning to deliver some exciting results, with
wide intercepts of the prospective claystone host rocks in the first hole at Altair and the re-drilled
hole at Polaris. This is exactly what we wanted to see in the drilling, and provides significant
encouragement that our exploration strategy in this highly sought-after district is firmly on track.
We look forward to assays and further results from the drilling.”
Background
Centred south-west of the township of Tonopah, in the heart of one of the world’s most active lithium
exploration districts, the Altair and Polaris Projects were strategically staked proximal to outcropping
tertiary sedimentary host rock (known locally as the Siebert formation) that is known to host claystone
lithium deposits around Nevada.
The Company embarked on its maiden scout drill campaign in late April 2023, exploring for lithium
mineralisation within the Siebert formation claystone under alluvial (gravel) cover at the two projects.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Initial drilling was successful, confirming the presence of lithium-bearing claystone at Polaris, before
mechanical drill issues resulted in a drilling hiatus3. Drilling re-commenced in late June, with the dual
objectives of executing a re-drill strategy at Polaris to drill below strong lithium anomalism encountered
in the initial drilling and to complete a maiden drilling program at Altair3.
Drill Results
Since the re-commencement of drilling, the Company has completed its first drill hole at the Altair Project
and completed a re-drill of Polaris hole PL04.
Drill hole AL01 intersected 109.7m (360ft) of Siebert formation, including a thick continuous zone of bluegreen claystone and clayey gravels, from 71.6 –181.4m (end-of-hole) (235-595ft). This is the thickest
intersection of Siebert formation encountered to date by the Company in Nevada.
The re-drill strategy at Polaris has seen drill hole PL04A intersect 59.5m (195ft) of Siebert formation, a
significant extension beyond the original PL04 intersection of 27.4m, which ended in low-grade lithium
mineralisation of 3.05m (10 feet) grading 140.8ppm lithium3.
Figure 1. Schematic east-west cross-section of AL01 with remaining Altair planned holes
Interpretation
The thick intersection of Siebert formation at Altair confirms the presence of the prospective lithium host
rocks at the project, which has excellent potential for lithium mineralisation.
The Siebert Formation is the local name for lacustrine (lake) sedimentary rocks mapped across parts of
Nevada. The formation is known to host two of the largest lithium resources in the United States – the
15.8Mt LCE Tonopah Flats deposit1 and the 9.79Mt LCE TLC Lithium Project2.
The deepening of the Claystone intersection in PL04A was designed to test for higher-grade lithium
mineralisation beyond the original PL04 intersection of 3.05m (10 feet) grading 140.8ppm lithium at endof-hole, given the general increase in lithium grade observed toward the end of the hole.
The successful re-drill has significantly extended the claystone encountered in PL04A, highlighting the
significant potential in the project area. Furthermore, all drill holes at Polaris and Altair have ended in
Siebert formation claystones, indicating further potential beyond the extent of current drilling.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Figure 2. Chip tray samples at 5-foot (Approx. 1.5m) depth intervals from Altair drill hole AL01
CAUTIONARY STATEMENT ON VISUAL ESTIMATES OF MINERALISATION
References in this announcement to visual results are from geological logging of percussion chip
samples taken from exploration drilling. The claystone-dominant lithology intersected in drilling is
interpreted to be the Siebert formation, a claystone-dominant formation in which claystone-hosted
lithium deposits are observed to form elsewhere in the region.
Visual estimates are based on geological logging and thus are preliminary in nature. No attempt is made
to predict the lithium content of the intersected claystone and laboratory assays are required to
determine the presence of lithium mineralisation. Representative samples from select parts of the
intervals that have intersected the interpreted Siebert formation will shortly be dispatched to a thirdparty Laboratory for analysis, with results expected by early to mid-September.
Next Steps
Samples collected from Altair hole AL01, along with those from the Polaris hole re-drill PL04A, will be
dispatched to ALS Laboratories in Reno for analysis, with results expected by mid-September.
Due to the challenging ground conditions encountered during drilling of the initial sites at Polaris and
Altair, the Company has decided to demobilise the rig from site and return with a higher-powered rig to
drill the remaining holes at Altair. The Company has had initial discussions with the current drill
contractor, who has availability for a higher-powered rig in October 2023.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Figure 3. Polaris project drill hole location plan (PL04A located at site PL04)
Figure 4. Altair Project drill hole location plan
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Figure 5. Location of Polaris and Altair Projects, lithium deposits and exploration projects
Hole ID
Easting
Northing
Depth
AL01
470859
4189179
181.4m (595ft)
PL04A
472387
4203387
189.0m (620ft)
Comments
Re-drill of PL043
Table 1. Drill site locations
1 OTCMKTS: ABML 26 February 2023 ‘Technical Report Summary For The Tonopah Flats Lithium Project, Esmeralda..’
2 TSX.V: LI 17 March 2023 ‘Tonopah Lithium Claims project NI 43-101 technical report – Preliminary Economic Assessment’
3 ASX: ARO 27 June 2023 ‘Strong Lithium anomalism in initial Nevada Assays as drilling resumes’
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Authorisation
This announcement has been authorised for release by the Board of Astute.
More Information
Matt Healy
General Manager – Exploration
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a full-time employee of
Astute Metals NL and is eligible to participate in a Loan Funded Share incentive plan of the Company. Mr
Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr Newport is a member of the Australian Institute of Geoscientists and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialisedindustry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheldXRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
4.5” tri-cone (PL04A) and 4¾” reverse
circulation (AL01) drilling was undertaken for
drill sample collection. Samples were
collected on a 5-foot basis in calico bags.
Include reference to measures taken to
ensuresample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, suchas where there is
coarse gold that has inherentsampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Drilling
techniques
Drill sample
recovery
Samples were air dried on elevated grid mesh
until practical to transport
Claystone hosted lithium deposits are thought to
form as a result of the weathering of
lithium-bearing volcanic glass within
tertiary-aged tuffaceous lacustrine sediments
ofthe mapped Ts3 unit. Inputs of lithium from
geothermal sources have also been proposed.
Drill type (eg core, reverse circulation, openholehammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
isoriented and if so, by what method, etc).
4.5” tri-cone (PL04A) and 4¾” reverse circulation
(AL01) drilling methods employed. Water was
injected to assist with transport ofsample from
bit to surface, as required.
Method of recording and assessing core
andchip sample recoveries and results
assessed.
Sample recovery established by dry sample
weights undertaken by independent
laboratory prior to sample preparation and
analysis
Measures taken to maximise sample
recoveryand ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gainof fine/coarse material.
Logging
Nominal small drill sample was collected for chip
tray and sandwich-sized ziplock bags, with all
remaining sample collected in calico bag for
despatch to external laboratory
Whether core and chip samples have
been geologically and geotechnically
logged to alevel of detail to support
appropriate MineralResource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or
quantitative innature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevantintersections logged.
Drilling was unable to be completed to desired
depth in some holes as a function of poor ground
conditions
Challenging ground conditions arising from the
drilling of quaternary alluvial and soft claystones
did result in poor recovery in some instances.
Instances of poor recovery are not expected
tomaterially impact interpretation of results
Drill cuttings for entire hole logged for lithology by
contract geologist and company geologists
Logging is qualitative
Photography of material intersections of
claystone taken of relevant chip trays
See Appendix 2 for preliminary lithology
logging
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Criteria
JORC Code explanation
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Commentary
N/A No sample assays reported
If non-core, whether riffled, tube sampled,
rotarysplit, etc and whether sampled wet or
dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the
sampling isrepresentative of the in situ
material collected,including for instance
results for field duplicate/second-half
sampling.
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to
thegrain size of the material being sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial ortotal.
No new sample assays reported. Previously
reported assay results referenced in footnotes
of this announcement
For geophysical tools, spectrometers,
handheldXRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precisionhave been established.
Verification
of sampling
and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Sample intervals to be assigned a unique
sample identification number prior to sample
despatch
The use of twinned holes.
Lithium-mineralised claystone Certified
Reference Materials (standards), pulp blanks
and coarse blanks to be inserted into the
sample stream at regular intervals to
monitor lab accuracy and potential
contamination during sample prep and
analytical processes
Documentation of primary data, data
entryprocedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Drill collar locations determined using handheld GPS with location reported in NAD83 UTM
Zone 11. Expected hole location accuracy of +/10m
No downhole surveys conducted on vertical
holes
Quality and adequacy of topographic
control.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing is appropriate for early exploration
purposes
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
MineralResource and Ore Reserve estimation
procedure(s) and classifications applied.
5-foot sample interval widely adopted as
standard practice in air drilling in the USA.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
Claystone beds are regionally sub-horizontal
withshallow dip of <5° although locally this may
vary
Sample
security
The measures taken to ensure sample security.
Samples delivered from the drill site to Freight
agent by Company staff/contractors for
delivery to external laboratory
Audits or
reviews
The results of any audits or reviews of
samplingtechniques and data.
Not applicable
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
Polaris and Altair Claims held in 100% Astute
subsidiary Needles Holdings Inc.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration
byother parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified by the
Bureau of Land Management (BLM)
No known lithium exploration conducted on
Polaris or Altair areas.
Exploration conducted in the region by other
explorers referenced in announcement body
text
The principal target deposit style is claystone
hosted lithium mineralisation. Claystone hosted
lithium deposits are thought to form as a result of
the weathering of lithium-bearing volcanic glass
within tertiary-aged tuffaceous lacustrine
sediments of the mapped Ts3 unit.
Lacustrine environments formed as a result of
extensional tectonic regime that produced ‘basin
and range’ topography observed across the
stateof Nevada. Inputs of lithium from
geothermal sources havealso been proposed.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
◦ easting and northing of the drill hole collar
◦ elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
◦ dip and azimuth of the hole
◦ down hole length and interception depth
◦ hole length.
Drillhole locations and drilled depths are
tabulated in body report
All holes drilled vertically
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated.
N/A
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations should
be shownin detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
Insufficient information available due to early
exploration status
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (eg ‘down hole length, true width not
known’).
Diagrams
Appropriate maps and sections (with scales)
andtabulations of intercepts should be included
for any significant discovery being reported
These should include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Included in ASX announcement
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
This release describes all relevant information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysicalsurvey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
This release describes all relevant information
Further work
The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Drill results arising from the current campaign will
dictate whether further work is warranted at the
Polaris and Altair project areas
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
APPENDIX
PolarisAircore
AircoreDrilling
Drilling
APPENDIX 22––Polaris
Preliminary Lithology Logging
Hole ID
From
To
Rock Formation
Lithology
Comments
AL01
0
235
Unconsolidated
Alluvium
Pebbly, rounded to angular and polymictic
AL01
235
275
Siebert
Clayey Gravel
Variable light orange-brown clay content
AL01
275
335
Siebert
Claystone
Tan claystone with minor gravel
AL01
335
350
Siebert
Claystone
Light olive brown claystone
AL01
350
370
Siebert
Claystone
Bluey green claystone
AL01
370
385
Siebert
Clayey Gravel
AL01
385
395
Siebert
Claystone
AL01
395
405
Siebert
Clayey Gravel
AL01
405
445
Siebert
Claystone
AL01
445
475
Siebert
Clayey Gravel
AL01
475
490
Siebert
Claystone
Bluey green claystone with minor gravel
AL01
490
500
Siebert
Claystone
Bluey green claystone
AL01
500
535
Siebert
Claystone
Bluey green claystone with minor gravel
AL01
535
585
Siebert
Claystone
Light bluey green claystone
AL01
585
595
Siebert
Claystone
Dark grey green claystone
Bluey green claystone in part
Bluey green claystone with gravel
Bluey green claystone in part
Bluey green claystone with gravel
Bluey green claystone in part
PL04A
0
425
Unconsolidated
Alluvium
Pebbly to sandy yellowish brown and polymictic
PL04A
425
430
Siebert
Claystone
Olive brown silty claystone
PL04A
430
485
Siebert
Gravel
Gravel, brown. Clayey in part
PL04A
485
500
Siebert
Claystone
Olive brown silty to sandy claystone
PL04A
500
510
Siebert
Claystone
Medium brown
PL04A
510
520
Siebert
Claystone
Light tan brown
PL04A
520
540
Siebert
Claystone
Bluey green claystone
PL04A
540
545
Siebert
Claystone
Olive brown
PL04A
545
555
Siebert
Clayey Gravel
PL04A
555
560
Siebert
Claystone
PL04A
560
585
Siebert
Gravel
PL04A
585
595
Siebert
Claystone
PL04A
595
620
Siebert
Gravel
Medium olive brown. Clayey in part
Olive brown
Grey, tan, clayey in part
Olive brown
Light brown. Clayey in part
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutuemetals.com
Share your feedback
Discover