Work advances on maiden Mineral Resource Estimate for the Red
Mountain Lithium Project, USA following return of final drill assays
Maiden MRE expected within three weeks against a backdrop of rebounding lithium prices
Highlights
• Final assay results received from the October 2025 drilling campaign at the Red Mountain
Lithium Project, Nevada, USA.
• Drill-hole RMRC016 intersected a combined 10.6m of lithium mineralisation, including:
o 6.1m @ 2,130ppm Li from 32m, including 3m @ 3,550ppm Li from 33.5m
• Drill-hole RMRC017 intersected a combined 9.1m of lithium mineralisation, including:
o 3m @ 2,770ppm Li from 33.5m
• Drill-hole RMRC018 intersected a combined 9.1m of lithium mineralisation, including:
o 4.6m @ 1,320ppm Li from 22.9m
• Results add to previous high-grade intersections in the Project’s northern area9
, where lithium
mineralisation grading >2,000ppm has now been intersected in drill-holes over a >1km strike.
• Receipt of these results concludes the full drill dataset for the Red Mountain Project.
• Work has commenced on a maiden Mineral Resource Estimate (MRE), which is expected to be
delivered to market within three weeks.
• The imminent delivery of a maiden MRE comes as lithium prices continue to surge, with the
Shanghai Metal Market Battery-Grade Lithium Carbonate Price more than doubling over the
past five months to US$20,000/t11
.
• Investment banks such as Morgan Stanley and UBS are predicting a lithium supply deficit in
202612
.
Venari Minerals NL (ASX: VMS) (“Venari”, “the Company” or “VMS”) is pleased to advise that work has
commenced on a maiden Mineral Resource Estimate (MRE) for its 100%-owned Red Mountain Lithium
Project in Nevada, USA, following receipt of the final assay results from the 13-hole Reverse Circulation
(RC) drilling campaign completed in October 2025.
The latest assays, from holes drilled in the northern project area, reveal a similar high tenor of
mineralisation as the previous holes drilled in that part of the deposit, with two of the three holes
intersecting lithium mineralisation grades exceeding 2,000ppm Li (Figures 1 and 2).
The receipt of assays for these three holes completes the drill-hole dataset for the Red Mountain
Lithium Project, paving the way for reporting a maiden MRE within three weeks.
2
newmurchgold.com.a
Venari Chairman, Tony Leibowitz, said:
“With all results now received from last year’s drilling campaign, the full dataset has been sent to our
consultants and work is underway on the maiden Mineral Resource Estimate. Thanks to our counter-
cyclical commitment to this project over the past few years, we are now in an outstanding position to
deliver this significant milestone at a time when the lithium sector is rebounding strongly.
“Lithium prices have more than doubled in the past five months, and there are widespread expectations
of a market deficit this calendar year. As prices return to incentive levels, we are in the unique and
enviable position of having ownership of one of the largest new lithium projects in North America at a
time of enormous strategic interest in new, large-scale critical minerals assets.”
Figure 1. Red Mountain north and central (down-hole) drill intersections over gridded soil geochemistry image.
3
newmurchgold.com.a
Results
Intersections for the final three drill-holes are as follows:
Hole RMRC016
• 3m @ 1,030ppm Li / 0.55% Lithium Carbonate Equivalent10
(LCE) from 10.7m
• 6.1m @ 2,130ppm Li / 1.13% LCE from 32m incl
o 3m @ 3,550ppm Li / 1.89% LCE from 33.5m
• 1.5m @ 575ppm Li / 0.31% LCE from 91.4m
Hole RMRC017
• 4.6m @ 1,060ppm Li / 0.56% LCE from 9.1m
• 3m @ 2,770ppm Li / 1.47% LCE from 33.5m
• 1.5m @ 576ppm Li / 0.31% LCE from 94.5m.
Hole RMRC018
• 9.1m @ 1,110ppm Li / 0.59% LCE from 19.8m incl
o 4.6m @ 1,320ppm Li / 0.7% LCE from 22.9m
Figure 2. RMRC016-017 preliminary interpretative cross-section with down-hole lithium geochemistry.
Background
Located in central-eastern Nevada (Figure 4) the Red Mountain Project was staked by Venari in August
2023. Well-serviced by infrastructure, the project is adjacent to the Grand Army of the Republic
Highway (Route 6), 20km west of the 525kV One Nevada transmission line and less than 6km from a
113-acre private property with 590,000m3
of annual water rights secured by Option agreement7
.
4
newmurchgold.com.a
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the
Horse Camp Formation. Elsewhere in Nevada, equivalent rocks host large lithium deposits (see Figure
4) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3
and American Battery
Technology Corporation’s (NASDAQ: ABAT) 18.7Mt LCE Tonopah Flats deposit4
.
Figure 3. RMRC018-RMDD004 preliminary interpretative cross-section with down-hole lithium geochemistry.
A total of 32 drill holes have been completed at the project to date for a combined 6,015m of drilling
across four campaigns. These campaigns have been highly successful, intersecting strong lithium
mineralisation in almost every hole6,9
.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration5
, and beneficiation
test-work has indicated the potential to upgrade the Red Mountain mineralisation1,2,8
.
Hole ID
Easting
(NAD83)
Northing
(NAD83)
RL (m)
Azimuth
(°)
Dip
(°)
Depth
(m)
RMRC016 637019.9 4291604.7 1703.7 270.5 -50 167.64
RMRC017 637023.2 4291604.7 1704 0 -90 182.88
RMRC018 637266.1 4289961.9 1728.5 270.5 -70 140.208
Table 1. Drill collar details
About Lithium Carbonate Equivalent (LCE)
Unlike spodumene concentrate, which is a feedstock, Lithium Carbonate is a downstream product that
may be used directly in battery material production or converted to other battery products such as
lithium hydroxide.
5
newmurchgold.com.a
The Shanghai Metal Market Battery Grade Lithium Carbonate USD Price closed at US$20,001/t as of 9
January 202611
, having more than doubled over the past 5 months.
Lithium Carbonate may be produced directly from lithium clay deposits, such as Lithium Americas’
(NYSE: LAC) Thacker Pass Project3
, which is currently under construction. Accordingly, exploration
results for Red Mountain have been reported as both the standard parts-per-million (ppm) and as %
Lithium Carbonate Equivalent (LCE)10
.
Figure 4. Location of Red Mountain and other Nevada Lithium projects.
6
newmurchgold.com.a
References
1 – ASX: ASE, 22 April 2025, Beneficiation testwork successfully upgrades mineralisation at Red Mountain
2 - ASX: ASE, 10 June 2025, Beneficiation Delivers 4,480ppm Lithium Clay Concentrate at Red Mountain
3 - NYSE: LAC, 31 December 2024, Updated NI 43-101 Technical Report for the Thacker Pass Project
4 - NASDAQ: ABAT, 4 September 2025, Tonopah Flats Lithium Project S-K 1300 Technical Report and Preliminary Feasibility Study
5 - ASX: ASE, 9 December 2024, Positive initial metallurgical results from Red Mountain
6 - ASX: ASE, 25 June 2025, Exceptional Drill-hole Intersects combined 170m of Lithium Mineralisation at Red Mountain
7 - ASX: VMS, 10 December 2025, Red Mountain Lithium Project De-Risked with Water Rights Secured
8 - ASX: VMS, 15 October 2025, Metallurgical test-work delivers 132% upgrade to lithium mineralisation at Red Mountain, Nevada
9 - ASX: VMS, 16 December 2025, Highest-Grade lithium intersection to date at Red Mountain
10 - Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm)
x 5.323 /10,000
11 - SMM, 9 January 2026, Battery-Grade Lithium Carbonate Index, USD/mt (https://www.metal.com/Lithium/202212050001)
12 - Reuters, 5 January 2026, Energy storage boom strengthens demand outlook for beaten-down lithium
Authorisation
This announcement has been authorised for release by the Board of Venari Minerals NL.
Join the Venari Minerals Investor Hub
Engage with Venari Minerals through accessing reports, presentations, interviews
and other Company content. Ask Questions and browse responses to other
investors’ questions. Click here and follow the prompts to sign up.
For further information, please contact:
Matthew Healy Nicholas Read
Executive Director & CEO Media & Investor Relations
T: +61 (0) 431 683 952 T: +61 (0) 419 929 046
E: matt@venariminerals.com E: nicholas@readcorporate.com.au
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a full-time employee
of Venari Minerals NL and is eligible to participate in share-based incentive schemes of the Company.
Mr Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
7
newmurchgold.com.a
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
8
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 1 - SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
5.5” reverse circulation drilling was
undertaken for drill sample
collection. Samples were collected
on a 5-foot basis in calico bags,
with approximate 30% split
retained from a rotary cone splitter
for lab assay. Water was injected
throughout the hole.
Nominal small drill sample was
collected for chip tray records
Samples were air dried on elevated
grid mesh until practical to
transport
Claystone hosted lithium deposits
are thought to form as a result of
the weathering of lithium-bearing
volcanic glass within tertiary-aged
tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of
lithium from geothermal sources
have also been proposed.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
5.5” Reverse Circulation drilling
methods employed using a cross-
over sub immediately behind the
hammer.
9
newmurchgold.com.a
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries
and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Sample recoveries to be measured by
dry sample weight at the laboratory
prior to assay.
Some instances of poor recovery
noted.
Instances of poor recovery are not
expected to materially impact
interpretation of results
Logging Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of
the relevant intersections logged.
Drill cuttings of entire hole logged
for lithology by consultant
geologist
Logging is qualitative with selective
quantitative logging (e.g. quartz
veining)
Chip tray photography undertaken
on all full drill holes
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the
sampling isrepresentative of the in-situ
material collected,including for instance
results for field duplicate/second-half
sampling.
Samples 30% split using a rotary cone
splitter and submitted to ALS
Laboratories in Elko for preparation
and analysis.
10
newmurchgold.com.a
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to
thegrain size of thematerial being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used andwhether the technique is
considered partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and theirderivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
Samples analysed by method ME-
MS61 which is an ICP-MS method
employing a 4-acid digest.
A comparison of aqua-regia and 4-
acid digests was undertaken for Red
Mountain mineralisation, with no
material difference in lithium results
identified.
Assay quality was monitored using
pulp blanks, as well as certified
reference materials (CRMs) at a range
of lithium grades. Pulp blank results
indicated no material contamination
of samples from sample preparation
or during the analytical process. CRM
results were within 3 standard
deviations of certified values. No
material systematic bias nor other
accuracy related issues were
identified.
Verification
of sampling
and
assaying
The verification of significant intersections
byeither independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entryprocedures, data verification, data
storage(physical and electronic)
protocols.
Discuss any adjustment to assay data.
Sample intervals assigned a unique
sample identification number
prior to sample despatch
Lithium-mineralised claystone
Certified Reference Materials
(standards), pulp blanks and coarse
blanks inserted into the sample
stream at regular intervals to monitor
lab accuracy and potential
contamination during sample prep
and analysis.
Location of
data points
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar locations determined using
hand held GPS with location reported
in NAD83 UTM Zone 11 with expected
accuracy of +/- 10m
Downhole surveys conducted on drill
holes at nominal 100ft intervals, with
drill rigs lined up by compass and
clino at start of hole.
11
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria JORC Code explanation Commentary
Data
spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Drill spacing appropriate for early
stage exploration
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Claystone beds are regionally
shallow-dipping at ~20°-45° to the
east and varying locally across the
Project with some evidence of faulting
and potential folding. Most holes are
drilled approximately perpendicular
to bedding, with some having a down-
dip component due to drill pad
location and allowable disturbance
limitations. These holes have
estimated true width intersections
included in the body release as well
as down hole intersections.
Sample
security
The measures taken to ensure sample
security.
Samples stored at secured yard and
shed located in township of Currant
until delivered by staff or contractors to
the ALS labs
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Not applicable
12
newmurchgold.com.a
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
SECTION 2 - REPORTING OF EXPLORATION RESULTS
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Red Mountain Claims held in 100%
subsidiary Needles Holdings Inc.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified
by the Bureau of Land Management
(BLM)
Exploration
done by
other parties
Acknowledgment and appraisal of
exploration by other parties.
No known previous lithium exploration
conducted at Red Mountain.
Exploration conducted elsewhere in
Nevada by other explorers referenced in
body text.
Geology Deposit type, geological setting and style
of mineralisation.
The principal target deposit style is
claystone hosted lithium
mineralisation. Claystone hosted
lithium deposits are thought to form as
a result of the weathering of lithium-
bearing volcanic glass within tertiary-
aged tuffaceous lacustrine sediments
of the mapped Ts3 unit.
Lacustrine environments formed as a
result of extensional tectonic regime
that produced ‘basin and range’
topography observed across the state
of Nevada. Inputs of lithium from
geothermal sources have also been
proposed.
13
newmurchgold.com.a
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
• easting and northing of the drill
hole collar
• elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception
depth
• hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Drill hole information is tabulated in
body text and/or shown in relevant
maps.
Data
Aggregation
Methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated
Intersections, where quoted are
weighted by length. Lengths originally
recorded in feet are quoted to the
nearest 10cm.
Estimates of ‘true width’ intersections
given where drilling is interpreted to
have a significant down-dip component.
Rounding is conducted to 3 significant
figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance
for 10ft of internal dilution by lower
grade material.
Low grade mineralisation (300-500ppm
Li) is present outside of the quoted
intersections
Intersections are quoted in both lithium
ppm and as wt% Lithium Carbonate
Equivalent (LCE). LCE is calculated as
LCE = Li (ppm) x 5.323 / 10,000, as per
industry conventions
14
newmurchgold.com.a
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Insufficient information available due to
early exploration status, although
interpretation to date is that
intersections in this hole approximate
true width unless otherwise indicated.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Included in ASX announcement.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
This release describes all relevant
information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
This release describes all relevant
information
Further work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
The Red Mountain lithium project is
emerging as a significant lithium
discovery in Nevada and is being
advanced toward a maiden Mineral
Resource Estimate later this year. It is
the Company’s intent to advance the
project beyond this to technical
studies.
15
newmurchgold.com.a
APPENDIX 2 – Red Mountain Drilling Sample Assay Table
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC016 0 5 79.9 0.04 RMRC016 210 215 338 0.18
RMRC016 5 10 90.2 0.05 RMRC016 215 220 293 0.16
RMRC016 10 15 64.3 0.03 RMRC016 220 225 342 0.18
RMRC016 15 20 164 0.09 RMRC016 225 230 222 0.12
RMRC016 20 25 83.2 0.04 RMRC016 230 235 260 0.14
RMRC016 25 30 82.1 0.04 RMRC016 235 240 256 0.14
RMRC016 30 35 350 0.19 RMRC016 240 245 141.5 0.08
RMRC016 35 40 1440 0.77 RMRC016 245 250 200 0.11
RMRC016 40 45 619 0.33 RMRC016 250 255 254 0.14
RMRC016 45 50 319 0.17 RMRC016 255 260 57.7 0.03
RMRC016 50 55 116 0.06 RMRC016 260 265 282 0.15
RMRC016 55 60 103.5 0.06 RMRC016 265 270 82.1 0.04
RMRC016 60 65 172 0.09 RMRC016 270 275 77.6 0.04
RMRC016 65 70 157 0.08 RMRC016 275 280 104.5 0.06
RMRC016 70 75 116 0.06 RMRC016 280 285 216 0.11
RMRC016 75 80 123 0.07 RMRC016 285 290 40.1 0.02
RMRC016 80 85 112 0.06 RMRC016 290 295 60.1 0.03
RMRC016 85 90 105.5 0.06 RMRC016 295 300 269 0.14
RMRC016 90 95 179.5 0.10 RMRC016 300 305 575 0.31
RMRC016 95 100 173.5 0.09 RMRC016 305 310 201 0.11
RMRC016 100 105 49.4 0.03 RMRC016 310 315 82.7 0.04
RMRC016 105 110 523 0.28 RMRC016 315 320 414 0.22
RMRC016 110 115 3970 2.11 RMRC016 320 325 378 0.20
RMRC016 115 120 3130 1.67 RMRC016 325 330 344 0.18
RMRC016 120 125 877 0.47 RMRC016 330 335 337 0.18
RMRC016 125 130 217 0.12 RMRC016 335 340 144.5 0.08
RMRC016 130 135 63.5 0.03 RMRC016 340 345 274 0.15
RMRC016 135 140 45.5 0.02 RMRC016 345 350 472 0.25
RMRC016 140 145 92.6 0.05 RMRC016 350 355 240 0.13
RMRC016 145 150 80.8 0.04 RMRC016 355 360 198.5 0.11
RMRC016 150 155 100 0.05 RMRC016 360 365 287 0.15
RMRC016 155 160 39.4 0.02 RMRC016 365 370 247 0.13
RMRC016 160 165 111.5 0.06 RMRC016 370 375 96 0.05
RMRC016 165 170 46.2 0.02 RMRC016 375 380 45.8 0.02
RMRC016 170 175 332 0.18 RMRC016 380 385 167 0.09
RMRC016 175 180 386 0.21 RMRC016 385 390 40.5 0.02
RMRC016 180 185 359 0.19 RMRC016 390 395 40.2 0.02
RMRC016 185 190 217 0.12 RMRC016 395 400 51.4 0.03
RMRC016 190 195 178 0.09 RMRC016 400 405 190.5 0.10
RMRC016 195 200 118.5 0.06 RMRC016 405 410 65.8 0.04
RMRC016 200 205 393 0.21 RMRC016 410 415 75.1 0.04
RMRC016 205 210 430 0.23 RMRC016 415 420 60.8 0.03
16
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC016 420 425 187.5 0.10 RMRC017 90 95 50.5 0.03
RMRC016 425 430 184 0.10 RMRC017 95 100 108 0.06
RMRC016 430 435 156.5 0.08 RMRC017 100 105 174.5 0.09
RMRC016 435 440 126.5 0.07 RMRC017 105 110 125.5 0.07
RMRC016 440 445 210 0.11 RMRC017 110 115 2200 1.17
RMRC016 445 450 177 0.09 RMRC017 115 120 3340 1.78
RMRC016 450 455 79.4 0.04 RMRC017 120 125 287 0.15
RMRC016 455 460 94.8 0.05 RMRC017 125 130 66.4 0.04
RMRC016 460 465 213 0.11 RMRC017 130 135 68.5 0.04
RMRC016 465 470 133 0.07 RMRC017 135 140 33.6 0.02
RMRC016 470 475 80.9 0.04 RMRC017 140 145 51 0.03
RMRC016 475 480 53.5 0.03 RMRC017 145 150 11.3 0.01
RMRC016 480 485 57.7 0.03 RMRC017 150 155 37.9 0.02
RMRC016 485 490 61.2 0.03 RMRC017 155 160 35.9 0.02
RMRC016 490 495 64.8 0.03 RMRC017 160 165 28.2 0.02
RMRC016 495 500 72.6 0.04 RMRC017 165 170 17 0.01
RMRC016 500 505 106 0.06 RMRC017 170 175 37.9 0.02
RMRC016 505 510 48.3 0.03 RMRC017 175 180 31.2 0.02
RMRC016 510 515 36 0.02 RMRC017 180 185 212 0.11
RMRC016 515 520 90.3 0.05 RMRC017 185 190 75.1 0.04
RMRC016 520 525 159 0.08 RMRC017 190 195 113.5 0.06
RMRC016 525 530 35.8 0.02 RMRC017 195 200 185 0.10
RMRC016 530 535 20 0.01 RMRC017 200 205 243 0.13
RMRC016 535 540 35.6 0.02 RMRC017 205 210 482 0.26
RMRC017 0 5 69.5 0.04 RMRC017 210 215 284 0.15
RMRC017 5 10 78.1 0.04 RMRC017 215 220 105 0.06
RMRC017 10 15 80.3 0.04 RMRC017 220 225 187.5 0.10
RMRC017 15 20 62.7 0.03 RMRC017 225 230 153.5 0.08
RMRC017 20 25 109.5 0.06 RMRC017 230 235 169.5 0.09
RMRC017 25 30 57.7 0.03 RMRC017 235 240 191.5 0.10
RMRC017 30 35 979 0.52 RMRC017 240 245 151.5 0.08
RMRC017 35 40 1150 0.61 RMRC017 245 250 68.2 0.04
RMRC017 40 45 1055 0.56 RMRC017 250 255 84.9 0.05
RMRC017 45 50 232 0.12 RMRC017 255 260 309 0.16
RMRC017 50 55 119.5 0.06 RMRC017 260 265 77.7 0.04
RMRC017 55 60 66 0.04 RMRC017 265 270 53.9 0.03
RMRC017 60 65 161.5 0.09 RMRC017 270 275 42.1 0.02
RMRC017 65 70 145.5 0.08 RMRC017 275 280 47 0.03
RMRC017 70 75 180 0.10 RMRC017 280 285 69.7 0.04
RMRC017 75 80 78.8 0.04 RMRC017 285 290 52.9 0.03
RMRC017 80 85 71.3 0.04 RMRC017 290 295 50.3 0.03
RMRC017 85 90 66.6 0.04 RMRC017 295 300 33.8 0.02
17
newmurchgold.com.a
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%) Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMRC017 300 305 71.4 0.04 RMRC017 510 515 53.9 0.03
RMRC017 305 310 232 0.12 RMRC017 515 520 40.8 0.02
RMRC017 310 315 576 0.31 RMRC017 520 525 32.4 0.02
RMRC017 315 320 219 0.12 RMRC017 525 530 43.7 0.02
RMRC017 320 325 244 0.13 RMRC017 530 535 45 0.02
RMRC017 325 330 207 0.11 RMRC017 535 540 49.3 0.03
RMRC017 330 335 363 0.19 RMRC017 540 545 70.2 0.04
RMRC017 335 340 235 0.13 RMRC017 545 550 47.9 0.03
RMRC017 340 345 224 0.12 RMRC017 550 555 25.3 0.01
RMRC017 345 350 111.5 0.06 RMRC017 555 560 28 0.01
RMRC017 350 355 316 0.17 RMRC017 560 565 5.4 0.00
RMRC017 355 360 123 0.07 RMRC017 565 570 2.2 0.00
RMRC017 360 365 103.5 0.06 RMRC017 570 575 3.2 0.00
RMRC017 365 370 163 0.09 RMRC017 575 580 5.8 0.00
RMRC017 370 375 158 0.08 RMRC017 580 585 4.7 0.00
RMRC017 375 380 71.2 0.04 RMRC017 585 590 14.4 0.01
RMRC017 380 385 48.5 0.03 RMRC017 590 595 14.1 0.01
RMRC017 385 390 38.5 0.02 RMRC017 595 600 9 0.00
RMRC017 390 395 16.8 0.01 RMRC018 0 5 73.4 0.04
RMRC017 395 400 27.1 0.01 RMRC018 5 10 84.1 0.04