Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 July 2024
JUNE 2024 QUARTERLY REPORT
Significant lithium discovery at Red Mountain Project in Nevada, with multiple
high-grade intercepts; Collaboration agreement to unlock base metals potential at
Georgina Basin; Positive Scoping Study for Governor Broome
Highlights
Lithium Projects, Nevada, USA
Red Mountain Project
•
•
High-grade lithium clay mineralisation discovered over 4.6km of strike, with the first three holes of
the maiden drill campaign all returning high-grade results:
RMRC001:
59.4m @ 1,300ppm Li from 73.2m
RMRC002:
15.2m @ 810ppm Li from 15.2m
RMRC003:
6.10m @ 1,050ppm Li from surface and
12.2m @ 1,060ppm Li from 18.3m
Maiden drill campaign now complete, with additional positive assay results reported subsequent to
quarter-end. Assays for all outstanding drill holes are expected by the end of July 2024.
Georgina Basin, NT
•
Collaboration agreement with Fleet Space Technologies to explore for large-scale copper and
•
Fleet Space’s ANT survey technology has previously been successfully employed by Astute to
silver-zinc-lead deposits at Ranken, in the east of the Georgina Project area.
generate a high-impact IOCG target at Leichhardt East.
Governor Broome, WA
•
•
•
Positive Scoping Study outlines a 10-year mine life of combined dry/dredge mining, producing
Heavy Mineral Concentrate on site with off-site toll treatment into mineral products.
Economic Analysis - Pre-tax NPV10 of A$139M, IRR of 54%, Total EBITDA of $426M and EBITDA Margin
of 34%.
$91m upfront Capex with <2yr payback period.
Corporate
•
Red Mountain claims dispute settled, resulting in Astute acquiring competitor claims to achieve
100% ownership of the Project.
•
Acquisition of the remaining 20% interest in the Georgina Basin IOCG Project completed, giving
•
Fleet Space Technologies acquires a direct equity stake in Astute at a significant price premium to
Astute 100% ownership.
market.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report on its activities for the
quarter ended 30 June 2024, with key highlights including a significant lithium discovery at its Red
Mountain Project in Nevada, the completion of further value-accretive work at the Georgina Basin IOCG
Copper-Gold Project in the Northern Territory, and the delivery of a positive Scoping Study which has
significantly de-risked the Governor Broome Heavy Mineral Sands project in the south-west of Western
Australia.
The activities during the June Quarter have continued to build on the Company’s robust platform for
growth and discovery success and provide for an exciting upcoming 12-month period.
Lithium Projects
Projects Overview
The US State of Nevada hosts several large claystone-hosted lithium deposits and is home to North
America’s only lithium mining operation, Albermarle’s Silver Peak lithium brine operation. Other major
deposits in the district include Ioneer’s (ASX: INR) Rhyolite Ridge Project and Lithium America’s Thacker
Pass deposit, one of the largest lithium deposits in North America (Figure 1).
Figure 1. Location of Astute Lithium Projects, and Nevada lithium deposits.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Red Mountain Project
Background
Located in central-eastern Nevada (Figure 1), the Red Mountain Project was staked by Astute in August
2023.
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the
Horse Camp Formation. Elsewhere in the state of Nevada, equivalent rocks host large lithium deposits (see
Figure 2) such as Lithium Americas’ (NYSE: LAC) 16.1Mt LCE Thacker Pass Project, American Battery
Technology Corporation’s (OTCMKTS: ABML) 15.8Mt LCE Tonopah Flats deposit and American Lithium
(TSX.V: LI) 9.79Mt LCE TLC Lithium Project.
After staking was completed, Astute executed the following exploration work programs:
•
An 819-point soil sampling campaign that revealed strong lithium anomalism in soils, with grades
of up to 1,110ppm lithium and a coherent 50ppm+ anomaly that stretched over 8km strike and up
to 2.8km width (Figure 1).; and
•
A rock-chip sampling campaign at Red Mountain designed to test for lithium at strategic locations
and across a range of outcropping and shallowly sub-cropping rock types revealed the presence
of strongly mineralised claystone, with 10 claystones grading on average 1,102ppm lithium, ranging
from 132-2,190ppm lithium.
As a relatively soft rock type, the claystones at Red Mountain are ‘recessive’, or lie beneath a typically thin
veneer of alluvium. This recessive nature of the claystone means that more claystone may be present
than is immediately apparent, with the harder rock types presenting as outcrop and the claystone being
hidden.
Other attractive Project characteristics include outcropping claystone host-rocks and close proximity to
infrastructure, including the Project being immediately adjacent to the Grand Army of the Republic
Highway (Route 6), which links the regional cities of Ely with Tonopah.
Work completed during the quarter and results
Red Mountain Maiden Drilling Campaign
During the quarter, the Company commenced its maiden RC drilling campaign at the highly prospective
100%-owned Red Mountain Lithium Project in Nevada, USA.
The 10-hole, 1,500m (~5,000ft) drilling campaign was designed to test the thickness and grade of clayhosted lithium mineralisation in strategic locations across an approximate 5km trend. The campaign
commenced during late May and was completed in June, with a total of 11 holes (Table 1) drilled for a
combined 1,518m.
Initial assay results from the first three holes were received during the quarter, returning high-grade
mineralisation, indicating the potential discovery of a significant lithium deposit (Figure 1). Drill results for
Red Mountain have been reported as both the standard parts-per-million (ppm) and as % Lithium
Carbonate Equivalent (LCE). A full table of tabulated assay results is provided in Appendix 2.
The assay results included the following high-grade drill intersections:
•
RMRC001:
59.4m @ 1,300ppm Li / 0.69% Lithium Carbonate Equivalent1 (LCE) from 73.2m
•
RMRC002:
15.2m @ 810ppm Li / 0.43% LCE from 15.2m
•
RMRC003:
6.1m @ 1,050ppm Li / 0.56% LCE from surface, and
12.2m @ 1,060ppm Li / 0.56% LCE from 18.3m
These initial results have confirmed the anticipated discovery of sub-surface lithium mineralisation at Red
Mountain, which has clear potential to emerge as a significant project in the context of North American
exploration efforts for battery metals.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Positive assays for a further four holes were reported subsequent to quarter-end (see ASX Announcement
22 July 2024), with all outstanding assays expected to be reported by the end of July. Once assays for the
remaining drill holes have been received, results will be collated and interpreted in order to guide the next
phase of exploration at the project, which is expected to include follow-up drilling in the second half of the
calendar year.
Drill Hole ID
RMRC001
Easting
Northing
637610
(NAD83)
RL
Dip
Azimuth
Depth Drilled
4285589
1708
1694
180
182.9
4290201
-50
-50
270
128.0
-50
270
137.2
-50
270
182.9
(NAD83)
RMRC002
637105
RMRC004
637782
4288743
637321
RMRC006
637534
4288194
RMRC003
RMRC005
RMRC007
RMRC008
RMRC009
RMRC010
RMRC011
637105
637100
637676
637667
636942
636423
4290201
(m)
1694
1709
1687
4288197
1696
4287805
1672
4286218
1709
4285795
1704
4285791
4286202
1680
1650
(°)
-90
-50
(°)
-
270
(m)
36.6
137.2
-50
270
152.4
-50
270
152.4
-50
270
134.1
-50
-50
Table 1. Drill hole collar details
270
270
152.4
121.9
Red Mountain Rock-Chip Sampling
At the same time as the maiden drilling campaign was being undertaken, a total of 81 additional rock
chip samples were collected at the Project. These samples were designed to add to Astute’s
understanding of the prospective horizons at Red Mountain and complement the drill results from its
maiden drilling campaign. These rock chip assays, together with previous rock chip results and the highgrade drill intercepts outlined above, are shown in Figure 2.
Assay results from the sampling returned high-grade mineralisation of up to 4,150ppm lithium, further
enhancing the project’s exploration and discovery potential. Notable results returned up to 1.4km north
of the recently reported discovery include:
•
4,150ppm Li, brown-green claystone sampled 490m north of RMRC002
•
2,900ppm Li, brown claystone sampled 990m north of RMRC002
•
2,550ppm Li, brown claystone sampled 1.40km north of RMRC002
These results indicate that the targeted high-grade lithium horizon persists further north than previously
interpreted, with a number of high-grade samples located along an approximate north-south trend
stretching 1.4km north of the northernmost drill hole, RMRC002. The extended zone will be tested by future
drilling at the project.
University of Alberta Collaboration
During the quarter, the Company executed an agreement with the University of Alberta (‘UoA’) for a
collaboration project studying methods of extracting lithium from clay, with the objective of developing
lower-cost and environmentally friendly processing methods. Under the agreement, the Company will
provide lithium-bearing clay samples from its Projects, and UoA will undertake mineralogy and
extraction testwork on the samples, at no cost to Astute.
This work forms part of a PhD study being undertaken at UoA, and positive outcomes from the
collaboration may assist the Company in advancing its Nevada lithium projects in due course.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Figure 2. Drill-hole and rock chip locations, gridded soil sample geochemistry over aerial image.
Other matters - ‘Contested Area’ at Red Mountain
As advised in the previous quarter, the Company considered that it had title to a “Contested Area” of
overlapping claims. During the quarter the Company entered into a binding settlement with Rubicon, the
owner of competing claims in the Red Mountain project. Under the terms of the settlement, the Company
has agreed to pay Rubicon $US75,000 on signing and a further $US75,000 in twelve months’ time.
The detailed terms of the settlement are confidential and reflect no admission of liability of either party.
The settlement is an excellent outcome for the Company, one that provides certainty over the whole of
the Red Mountain property.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Cobre Project
Background
The Cobre Project was also staked by the Company in mid-2023 following positive results from
reconnaissance exploration sampling undertaken over a selection of areas identified as part of the same
desktop project generation exercise. The project is located in north-east of Nevada.
Work completed during the quarter
No work done was completed during the quarter at the Cobre Project.
Altair and Polaris Projects
Background
The Altair and Polaris Projects were staked by the Company in Q3 of the 2023 Financial Year. This followed
a systematic review of regional open file data, such as mapped geology, topography, stream sediment
geochemistry, land administration and an assessment of suitable claim-free areas.
Astute’s projects are located in the southern extent of the Big Smoky Valley, south-west of the township of
Tonopah, Nevada, in the heart of one of the world’s most active lithium exploration districts. Close to the
projects, the Siebert formation (Ts3) hosts large claystone lithium deposits, including American Battery
Technology Corporation’s (OTCMKTS: ABML) 15.8Mt Lithium Carbonate Equivalent (LCE) Inferred category
Tonopah Flats Lithium Clay Deposit1 and American Lithium Corporation’s (TSX.V: LI) 9.79Mt LCE Measured
and Indicated category TLC Lithium Project (Figure 2).
Figure 3. Altair, Polaris and selected neighbouring projects.
Work Completed During the Quarter
No work done was completed during the quarter for the Altair and Polaris Projects.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Georgina Basin, Northern Territory IOCG Project
Project Overview
Located in the highly prospective East Tennant Province in the Northern Territory, the Georgina Project
comprises seven granted Exploration Licences and three under application, for a combined total of
approximately 4,500km2 (Figure 4). As detailed below, the Project is now 100%-owned by Astute Metals
following the Company’s acquisition of the remaining 20% interest held by Greenvale Energy Limited (ASX:
GRV) during the quarter.
The East Tennant Province has been the subject of intense geoscientific investigation by both Geoscience
Australia and the Northern Territory Geological Survey for over five years. Pre-competitive work undertaken
as part of the Federal Government’s $225 million Exploring for the Future program (EFTF) included solid
geology interpretation, alteration proxy mapping and mineral prospectivity mapping for Iron Oxide
Copper Gold (IOCG) deposits.
The collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the highly
prospective nature of the region by intersecting prospective host rocks, IOCG-style alteration and sulphide
mineralisation as part of a 10-hole program at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some smaller highgrade variants – most notably those at Tennant Creek. This style of deposit contains elevated levels (1060wt %) of the iron oxide minerals magnetite and hematite, which gives rise to their (typically) elevated
magnetic and gravity (density) properties.
Australian IOCG’s include the Olympic Dam, Prominent Hill and Carrapateena deposits in South Australia;
Ernest Henry in north-west Queensland; and the high-grade Warrego and Juno deposits, located west of
the Georgina Project at Tennant Creek in the Northern Territory.
In the December 2022 Quarter, Astute acquired an 80% interest in the Georgina Basin Project from Knox
Resources Pty Ltd (Knox), a wholly owned subsidiary of Greenvale Energy Limited (ASX: GRV or Greenvale).
Knox is the 100% owner of the Georgina Project tenements. The key terms of the acquisition were set out in
the Company’s announcement of 1 June 2023; as part of the purchase consideration, a 2% gross royalty
is payable to Greenvale for any product arising from the Georgina Basin Project.
Georgina IOCG – Collaboration with Fleet Space
During the quarter, the Company entered into a collaborative partnership with Fleet Space Technologies
(“Fleet Space”) to undertake an ExoSphere Ambient Noise Tomography (“ANT”) geophysical survey across
the highly prospective Ranken tenement area, located in the east of its Georgina IOCG Project in the
Northern Territory (Figure 4).
The Ranken area basement geology consists of interpreted McNamara and South Nicholson Group rocks.
The McNamara and its equivalents are known to host several large-scale base metal deposits, including
the world-class Mt Isa copper and zinc-lead-silver deposits and the Century zinc-lead-silver deposit. Both
copper and silver are currently attracting significant levels of investor interest, driven by surging demand
and predicted supply shortfalls. Copper demand is expected to increase to 30Mtpa by 2035 and silver
deficits are on the rise, driven in part by its use in the manufacture of solar panels.
The partnership will see Fleet Space take an equity interest in Astute through a share subscription
agreement. As part of the agreement, Fleet Space will undertake a two-stage ANT survey aimed at
characterising the thickness of cover and exploring for seismic velocity anomalies in sub-cropping
basement rocks.
The first stage is a wide-spaced 400km2 ‘regional’ survey seeking to detect the shallow part of the subcropping McNamara host rocks. This will be followed by a second stage, high-resolution ~4km2 survey to
more accurately constrain likely cover rock thickness and explore for seismic velocity anomalies.
In general, rocks with higher density (including base metal deposits) tend to have higher seismic velocity
than surrounding rocks and therefore the ANT survey may identify zones of higher prospectivity within
prospective McNamara Group host rocks. The higher resolution survey will be located using results from
the regional ANT survey, once completed, in conjunction with gravity survey data. The field component of
the survey is planned to commence in August 2024, with final results expected to be received early in the
fourth quarter. Results from the surveys will be used to design a maiden drill hole at Ranken.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Figure 4. Geoscience Australia mineral potential ‘heat map’ for clastic-dominated siliciclastic carbonate style
sediment-hosted base metal deposits, with hotter colours more prospective – noting the Ranken Project tenements
EL32285 and EL32286 in the far east of the project, with the proposed ANT survey area.
Figure 5. ExoSphere seismic data is processed in real-time through Fleet’s network of satellites.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Governor Broome Mineral Sands Project, WA
Project Overview
The 100%-owned Governor Broome Mineral Sands Project is located in south-west Western Australia,
approximately 95km by sealed road south of Busselton, 105km south of Iluka’s processing plant at Capel,
and 135km from Bunbury Port and from Picton, where Doral has a heavy mineral separation plant (Figure
6).
A 132kV power line is located just 5km to the north and a three-phase power line passes through the
Governor Broome Project, giving it significant strategic advantages from an infrastructure and access
perspective.
The Company significantly de-risked the Governor Broome Project in 2023, with the successful execution
of in-fill drilling to upgrade the high-value Inferred Mineral Resources to Measured and Indicated status,
the acquisition of the high-grade Fouracres deposit, located along strike from Jack Track, and the
completion of a bulk testwork program on samples from Jack Track drilling.
Tenement
Category
Tonnage
R70/58 - Jack Track
Measured
20.2
R70/53 - Governor Broome
R70/22 - Fouracres
Project
Indicated
HM
Slimes
4.2
8.4
(Mt)
(%)
21
3.5
(%)
7.9
Total
41
3.9
8.2
Measured
8.0
5.0
13
Inferred
7
3.5
12
Indicated
44
5.0
13
Total
59
4.8
12.5
Indicated
0.72
11.4
6.5
Total
0.93
9.6
7.1
Measured
28.4
4.4
9.7
Inferred
7
3.5
12
Inferred
Indicated
Total
Resources
0.2
66
101
3.5
4.5
4.5
9
12
11
Table 2. Governor Broome Project Resources – at 2% HM lower block-cut-off grade2.
Note that the above figures have been appropriately rounded.
The Fouracres Resources estimated at a 3% Heavy Mineral (HM) lower block-cut-off grade
Governor Broome and Jack Track Resources estimated at a 2% HM lower block-cut-off grade
The bulk testwork program was highly successful, demonstrating the amenability of the Jack Track
Deposit to processing through the feed preparation circuit using conventional mineral sands processing
equipment. The material was processed without difficulty with the sand fraction containing the valuable
heavy minerals (Heavy Mineral Concentrate/HMC) readily liberated from the slimes without the need for
energy intensive processing equipment.
Furthermore, subsequent dry testwork demonstrated that a range of ilmenite, leucoxene, rutile and zircon
products could be recovered from the Heavy Mineral Concentrate. Monazite was also recovered to a
para-magnetic concentrate stream. Product qualities were consistent with other heavy mineral products
on the market.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Figure 6. Governor Broome Project Location, WA.
Work During the Quarter
Scoping Study
During the Quarter, the Company delivered a Scoping Study for the Governor Broome Project. The financial
metrics from the Study were exceptionally positive, as tabulated below:
Metric
Unit
Value
Average annual revenue
A$ million
125
Capital cost
Average annual operating cost
Pre-tax NPV (at 10% discount rate)
Pre-tax IRR
A$ million
A$ million
A$ million
%
Weighted average revenue to cash cost ratio
83
139
54
1.9
(payback period)
Capital Payback Period
91
Years
<2
Table 3. Scoping Study Material outputs.
The full release for the Scoping Study, including detailed assumptions, results and Cautionary Statements
is available in the ASX Announcement dated 4 April 2024
Needles Gold Project, Nevada
No work was undertaken during the quarter on the Needles Gold Project.
East Kimberley Diamond Project
No work was undertaken during the quarter for the East Kimberley Diamonds Project. The Company
continues to explore other opportunities for this asset.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
Corporate
Settlement of dispute in Red Mountain Project
During the quarter, the Company entered into a binding settlement with Rubicon, the owner of competing
claims at its Red Mountain Lithium Project located in the highly prospective lithium claystone district of
Nevada, USA.
Under the terms of the settlement, the Company has agreed to pay Rubicon $US75,000 on signing and a
further $75,000 in 12 months. The detailed terms of the settlement are confidential and reflect no admission
of liability by either party.
Share Subscription by Fleet
As part of the proposed arrangements for services to be performed by Fleet Space Technologies at the
Georgina Project (as outlined above), Astute issued 8,510,638 fully paid ordinary Astute shares (Shares)
at A$0.047 for a total value of A$400,000 to Fleet Space. The issue price represented a 67% premium to the
last closing price of the Company’s shares on 6 June 2024. The shares were issued under the Company’s
existing capacity pursuant to ASX Listing Rule 7.1.
Acquisition of the remaining 20% of Georgina Basin
Following the receipt of shareholder approval, during the quarter the Company completed the acquisition
of the remaining 20% interest in the Georgina IOCG Project (Georgina) held by Greenvale Energy (ASX:
GRV). The acquisition provides Astute with a 100% ownership position, simplifying the project’s ownership
and management structure.
The consideration payable was 5,000,0000 Astute Shares plus an additional 5,000,000 Shares if any of the
following is achieved within a 4-year period from completion:
1.
The Sale of 100% of Knox or the Georgina Project to a third party; or
2.
A Discovery, where Discovery is defined as a drill-hole that intersects:
a. 100m at 1% Copper (Cu), or equivalent where the length multiplied by the length-weighted average
grade in wt% units equals 100, provided a minimum intersection grade of 1% Cu (e.g. 10m @ 10% Cu,
50m @ 2% Cu); or
b. 100m @ 1.3g/t gold (Au), or equivalent where the length multiplied by the length-weighted average
in g/t units equals 130, provided a minimum intersection grade of 1.3g/t (e.g. 10m @ 13g/t Au, 50m
@ 2.6g/t Au); or
3.
A Mineral Resource Estimate, prepared according to JORC Code guidelines, where the Mineral
Resource is located on any tenement area forming the Georgina Project, including those currently
in application.
ASX Additional Information
The Company provides the following information pursuant to ASX Listing Rule requirements:
1.
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was $1,086,968.
Full details of exploration activity during the 30 June 2024 quarter are set out in this report.
2.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and development
activities for the quarter.
3.
ASX Listing Rule 5.3.5: Payment to related parties of the Company and their associates during the
quarter was $180,426 in cash.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
The Company advises that this relates to remuneration of Directors only. Set out below is the following
additional information in relation to the cash flow statement:
Name of
Nature of Payment
Director
Amount
[excluding any
GST]
Tony
Ongoing Non-Executive Chairman
John
Ongoing Non-Executive Director fees
22,500
Matthew
Ongoing
fees,
53,926
Vincent
Executive
Company
74,000
Leibowitz
fees
Young
Healy
Executive
Director
including superannuation
Fayad
Director,
Secretary and Chief Financial Officer
Total
($)
30,000
180,426
Table 4. Director’s remuneration
Tenements
In accordance with Listing Rule 5.3.3, Appendix 1 sets out a list of the Company’s exploration licences held
at the end of the quarter.
End Notes
The information contained in this announcement related to the Company’s past exploration results is
extracted from, or was set out in, the following ASX announcements which are referred to in this Quarterly
Activities Report:
Date
of
announcement
Name of announcement
4 April 2024
Governor Broome Mineral Sands Project -
29 April 2024
Quarterly Activities/Appendix 5B Cash Flow
13 May 2024
27 May 2024
31 May 2024
Scoping Study
Report
Settlement of Red Mountains Claims Dispute
Maiden Drilling Campaign commences at
Red Mountain
Results of General Meeting
7 June 2024
Collaboration with Fleet Space to explore the
18 June 2024
Significant Lithium Discovery at Red Mountain
Georgina Basin
Project
Table 5: Summary of announcements
Authorisation
This announcement has been authorised for release by the Board of Astute.
Suite
6, Level
5, 189
St, Sydney
2000
| GPO
2733,
Sydney
Suite
6, Level
5, 189
KentKent
St, Sydney
NSWNSW
2000
| GPO
Box Box
2733,
Sydney
NSWNSW
20012001
+61
(0)
2
8046
2799
|
admin@astutemetals.com
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
www.astutemetals.com
More Information
Matt Healy
Executive Director
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report that relates to:
Nevada Lithium Projects
The information in this report that relates to Nevada Lithium Projects Sampling Techniques and Data
(Section 1) is based on information compiled by Mr Matthew Healy, a Competent Person who is a Member
of The Australasian Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr Healy is a fulltime employee of Astute Metals NL and is eligible to participate in a Loan Funded Share incentive plan of
the Company. Mr Healy has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Healy consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
The information in this report that relates to the Nevada Lithium Projects Reporting of Exploration Results
(Section 2) is based on information compiled by Mr Richard Newport, principal partner of Richard Newport
& Associates – Consultant Geoscientists. Mr Newport is a member of the Australian Institute of
Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity whic
Share your feedback
Discover