Extension of Lithium Discovery at Red Mountain Project
Released
Released
Announcement PDF
20 January 2025
LITHIUM DISCOVERY EXTENDED WITH EXCEPTIONAL
86.9-METRE INTERCEPT AT RED MOUNTAIN, USA
Red Mountain Project delivers the thickest and one of the highest-grade
intersections to date, as the discovery continues to grow
Key Highlights
•
Strong lithium mineralisation returned in assays for drillhole RMDD002, which intersected:
•
86.9m @ 1,470ppm Li from 18.3m, including 32.1m of
high-grade mineralisation @ 2,050ppm Li from 46.2m.
•
RMDD002 marks the thickest intercept recorded to date at
Red Mountain.
•
Mineralisation successfully extended 375m north of
previous northernmost intersections in holes RMRC002 &
003.
•
Lithium mineralisation remains open down-dip to the east
and along strike to the north.
•
Outstanding results strenghten the foundation for a
maiden Mineral Resource Estimate in 2025.
Astute Metals NL (ASX: ASE) (“ASE”, “Astute” or “the Company”) is pleased to report assay results from the
second of two holes from its inaugural diamond drilling campaign at the 100%-owned Red Mountain
Lithium Project in Nevada, USA. Drill-hole RMDD002 has returned an outstanding thick intersection of
some of the highest-grade lithium mineralisation seen to date at the Project, intersecting:
•
86.9m @ 1,470ppm Li / 0.78% Lithium Carbonate Equivalent1 (LCE) from 18.3m, including an
internal high-grade zone grading 32.1m @ 2,050ppm Li / 1.09% LCE from 46.2m
The identification of thick, lithium mineralisation in the northernmost drill-hole at Red Mountain highlights
the immense scale of the project, with strong lithium mineralisation now intersected in all drill-holes now
spanning a north-south strike extent of over 5km and surface sample geochemistry indicating further
potential to the north, south and west of the current drilled extents7, 9 (Figure 4).
Of particular significance in hole RMDD002 is the presence of an internal 32.1m zone of very high-grade
lithium mineralisation averaging 2,050ppm Li. The identification of substantially higher-grade lithium
mineralisation in this hole, as well as that in the previously announced diamond drill hole RMDD001,
indicates strong potential for further high-grade zones to be discovered at Red Mountain.
With all results for the recent diamond drilling now received, the Company is finalising geological
mapping ahead of planning and permitting for the next round of drilling at the Project, which will be
conducted at the earliest opportunity in the 2025 field season.
Astute Chairman, Tony Leibowitz, said:
“Like all great discoveries, Red Mountain continues to grow and improve the more we drill. The
manifest scale and high tenor of mineralisation are testament to Red Mountain being one of the
most important recent US lithium discoveries. This drill hole is the latest in a succession of thirteen,
all of which intersected strong lithium mineralisation, establishing a solid foundation for a maiden
mineral resource estimate to be advanced rapidly in 2025.”
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Background
Located in central-eastern Nevada (Figure 5), the Red Mountain Project was staked by Astute in August
2023.
The Project area has broad mapped tertiary lacustrine (lake) sedimentary rocks known locally as the
Horse Camp Formation2. Elsewhere in the state of Nevada, equivalent rocks host large lithium deposits
(see Figure 5) such as Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project3, American Battery
Technology Corporation’s (OTCMKTS: ABML) 15.8Mt LCE Tonopah Flats deposit 4 and American Lithium
(TSX.V: LI) 9.79Mt LCE TLC Lithium Project 5.
Astute has completed substantial surface sampling campaigns at Red Mountain, which indicate
widespread lithium anomalism in soils and confirmed lithium mineralisation in bedrock with some
exceptional grades of up to 4,150ppm Li2,8 (Figure 4).
The Company’s maiden drill campaign at Red Mountain comprised 11 RC drill holes for 1,518m over a
4.6km strike length. This campaign was highly successful with strong lithium mineralisation intersected
in every hole drilled9. Two diamond drill holes have been drilled at the project.
Scoping leachability testwork on mineralised material from Red Mountain indicates high leachability of
lithium of up to 98%, varying with temperature, acid strength and leaching duration 10.
Other attractive Project characteristics include the presence of outcropping claystone host-rocks and
close proximity to infrastructure, including the Project being immediately adjacent to the Grand Army of
the Republic Highway (Route 6), which links the regional mining towns of Ely and Tonopah.
Results
Hole RMDD002 successfully intersected an 86.9m thick zone of lithium mineralised clay-bearing
mudstone, sandstone, tuff and limestone, from 18.3m to 105.2m down-hole. The best grades were
developed in the most clay-rich zones, which exhibit a desiccated and cracked appearance in drill core
once dry (Figure 2). An internal very high-grade zone of 32.1m graded 2,050ppm Li, with a maximum
single sample grade of 3,850ppm Li from 59.4-61.5m (195-201.7ft), which is the drill sample with the
highest lithium grade achieved to date at the project.
Figure 1. RMDD002 interpretative cross section, lithium geochemistry and (50-110m off-section) rock chip samples
Interpretation
The two northernmost holes drilled as part of the maiden Red Mountain RC drilling campaign, RMRC002
and RMRC003, intersected thin zones of near-surface lithium mineralisation. It was interpreted at the
time that these two holes ‘clipped’ the edge of a zone of lithium bearing clay-rich rocks that was likely to
thicken towards the east (see ‘open’ arrow in Figure 3)9. RMDD002 was designed to test this interpretation
and, in addition, extend the mineralisation 375m further north beneath an extrapolated zone of strong
rock chip sample results (Figure 1).
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
The technical team’s success in extending the mineralisation further to the north has provided another
375m of strike of the main zone of lithium mineralisation, with a full 86.9m intersection – the thickest
intersection achieved to date at the project.
Surface sampling data indicates that further potential extends at least another 1km north along strike
from RMDD002, and interpreted dip of the prospective stratigraphy to the east indicates excellent downdip potential.
Figure 2. High-grade clay rich RMDD002 drill-core from 48.8-50.3m (160-165ft) which assayed 3,280ppm Li.
Figure 3. RMRC002-003 interpretative cross section, lithium geochemistry and select rock chip samples.
Easting
Northing
(NAD83)
(NAD83)
RMDD001
637549
4286147
RMDD002
637186
4290574
Hole ID
RL
Dip
Azimuth
Depth
(°)
(°)
(m)
1726
-50
270
243.84
1709
-50
270
182.88
Table 1. Drill-hole collar details
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Figure 4. Drill-hole locations and intersections, and gridded soil sample geochemistry over aerial image.
Next Steps
Areas of potential lithium mineralisation identified to the north and down-dip to the east of RMDD002 will
be tested in future drill campaigns at Red Mountain. The Company is currently in the process of finalising
geological mapping undertaken at the Red Mountain Project. This work will be finalised and integrated
with surface sampling data to assist in refining the Company’s drilling plans.
The Company intends to then proceed with planning and permitting the next round of drilling at the
Project, to be conducted at the earliest opportunity in the 2025 field season.
About Lithium Carbonate Equivalent (LCE)
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Unlike spodumene concentrate, which is a feedstock, Lithium Carbonate is a downstream product that
may be used directly in battery production or converted to other battery products such as lithium
hydroxide.
The Benchmark Mineral Intelligence Lithium Carbonate China Index priced lithium carbonate product at
US$10,134/t6 as of 10 January 2025.
Lithium carbonate is the product of many of the most advanced lithium clay projects around the world,
including Lithium Americas’ (NYSE: LAC) 62.1Mt LCE Thacker Pass Project 3, which is currently under
construction. Accordingly, exploration results for Red Mountain have been reported as both the standard
parts-per-million (ppm) and as % Lithium Carbonate Equivalent (LCE) 1.
A full table of assay results is provided in Appendix 2.
Figure 5. Location of Astute Lithium Projects, and Nevada lithium deposits.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
1 Lithium Carbonate Equivalent wt%(LCE) has been calculated from Lithium parts-per-million (ppm) by the formula LCE = Li (ppm) x 5.323 /10,000
2 ASX: ASE 27 November 2023 ‘Outstanding Rock-Chip Assays at Red Mountain Project’
3 NYSE: LAC 31 December 2024 Updated NI 43-101 Technical Report for the Thacker Pass Project
4 OTCMKTS: ABML 26 February 2023 ‘Technical Report Summary for The Tonopah Flats Lithium Project, Esmeralda.’
5 TSX.V: LI 17 March 2023 ‘Tonopah Lithium Claims project NI 43-101 technical report – Preliminary Economic Assessment’
6 Source: Benchmark Mineral Intelligence – Lithium Carbonate China Index 12/06/2024
7 ASX: ASE 16 December 2024 ‘Major new zones of Lithium Mineralisation at Red Mountain Project’
8 ASX: ASE 8 July 2024 ‘High-grade rock chip assays extend prospective lithium horizon at Red Mountain Project, USA’
9 ASX: ASE 7 August 2024 ‘Red Mountain confirmed as significant lithium discovery following receipt of final assays’
10 ASX: ASE 9 December 2024 ‘Positive initial metallurgical results from Red Mountain’
Authorisation
This announcement has been authorised for release by the Board of Astute.
Astute Metals NL Interactive Investor Hub
Engage with Astute Metals through accessing reports, presentations, interviews and
other Company content.
Ask questions and browse responses to other investors’ questions
Click on https://astutemetals.com/auth/signup and follow the prompts to sign up
More Information
Matt Healy
Executive Director & CEO
mhealy@astutemetals.com
+61 (0) 431 683 952
Nicholas Read
Media & Investor Relations
nicholas@readcorporate.com.au
+61 (0) 419 929 046
Competent Persons
The information in this report that relates to Sampling Techniques and Data (Section 1) is based on
information compiled by Mr. Matthew Healy, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM Member number 303597). Mr. Healy is a full-time employee
of Astute Metals NL and is eligible to participate in a Loan Funded Share incentive plan of the Company.
Mr. Healy has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Healy consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Reporting of Exploration Results (Section 2) is based on
information compiled by Mr. Richard Newport, principal partner of Richard Newport & Associates –
Consultant Geoscientists. Mr. Newport is a member of the Australian Institute of Geoscientists and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person under the
2012 Edition of the ’Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves‘. Mr. Newport consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialisedindustry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheldXRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Triple-tube HQ diamond drilling was
undertaken for drill sample collection.
Samples were collected on a nominal 5-foot
basis or sampled to geological boundaries
based on lithological logging. Samples were
photographed, half-cored, and despatched
to an external lab by an external contractor.
Include reference to measures taken to
ensuresample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation thatare Material to the Public
Report.
Claystone hosted lithium deposits are thought to
form as a result of the weathering of
lithium-bearing volcanic glass within
tertiary-aged tuffaceous lacustrine sediments of
the mapped Ts3 unit. Inputs of lithium from
geothermal sources have also been proposed.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, suchas where there is
coarse gold that has inherentsampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openholehammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Triple tube HQ drilling methods employed. Core
was oriented where possible, although the soft
nature of the lithology precluded this for the
most part.
Drill sample
recovery
Method of recording and assessing core
andchip sample recoveries and results
assessed.
Sample recovery established by recovery
logging and dry sample weights undertaken
by independent laboratory prior to sample
preparation and analysis
Measures taken to maximise sample
recoveryand ensure representative nature
of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gainof fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
innature. Core (or costean, channel, etc.)
photography.
Poor drill core recovery at surface.
Instances of poor recovery are not expected
tomaterially impact interpretation of results
Drill core for the entire hole was logged for
lithology bycompany geologists
Logging is qualitative
Photography of drill core undertaken by
contractors in Elko prior to delivery to external
laboratory
The total length and percentage of the
relevantintersections logged.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Subsampling
techniques
and
sample
preparatio
n
If core, whether cut or sawn and whether
quarter, half or all core taken.
Core half cored at a third part contractor
facility in Elko, and submitted to ALS
Laboratories in Elko for preparation and
analysis.
If non-core, whether riffled, tube sampled,
rotarysplit, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness
of
the
sample
preparationtechnique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivityof samples.
Measures taken to ensure that the sampling
isrepresentative of the in-situ material
collected,including for instance results for field
duplicate/second-half sampling.
Quality of
assay
data and
laboratory
tests
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used
and whether the technique is considered
partial ortotal.
For geophysical tools, spectrometers,
handheldXRF instruments, etc., the parameters
used in determining the analysis including
instrument make and model, reading times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precisionhave been established.
Verification
of
sampling
and
assaying
Assay quality was monitored using pulp blanks,
as well as certified reference materials (CRMs)
at a range of lithium grades. Pulp blank results
indicated no material contamination of
samples from sample preparation or during the
analytical process. CRM results were within 3
standard deviations of certified values. No
material systematic bias nor other accuracy
related issues were identified.
The verification of significant intersections by
either independent or alternative company
personnel.
Sample intervals to be assigned a unique
sample identification number prior to sample
despatch
The use of twinned holes.
Lithium-mineralised claystone Certified
Reference Materials (standards), pulp
blanks and coarse blanks to be inserted into
the sample stream at regular intervals to
monitor lab accuracy and potential
contamination during sample prep and
analysis
Documentation of primary data, data
entry procedures, data verification, data
storage (physical
and
electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Samples analysed by method ME-MS41 which is
an ICP-MS method employing an aqua-regia
digest. Aqua-regia is not considered a ‘total’
digest for many elements however is
considered fit for purpose for lithium and has
been used extensively by other parties
exploring for lithium claystone deposits in the
USA.
Accuracy and quality of surveys used to
locatedrill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Drill collar locations determined using handheld GPS with location reported in NAD83 UTM
Zone 11. Expected hole location accuracy of +/10m
Downhole survey data yet to be validated.
For the purposes of drill sections, drill holes
have been plotted at the setup azimuth of
270° (Grid). This is not expected to make a
material difference to interpretation of
results.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing is appropriate for early exploration
purposes
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
MineralResource and Ore Reserve estimation
procedure(s) and classifications applied.
5-foot sample interval, or to geological
boundaries where appropriate, widely adopted
as standard practice in drilling in the USA.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
Claystone beds are regionally shallow-dipping at
~20°-45° to the east and varying locally across
the Project with some evidence of faulting and
potential folding
Sample
security
The measures taken to ensure sample security.
Samples stored at secure yard and shed located
in township of Currant until delivered by staff or
contractors to the core processing contractors at
Elko, and then to ALS lab at Elko, NV
Audits or
reviews
The results of any audits or reviews of
samplingtechniques and data.
Not applicable
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 1 - JORC Code, 2012 Edition – Table 1
Section 2 - Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
Red Mountain Claims held in 100% Astute
subsidiary Needles Holdings Inc.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration
byother parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Claims located on Federal (BLM) Land
Drilling conducted on claims certified by the
Bureau of Land Management (BLM)
No known previous lithium exploration
conducted at Red Mountain
Exploration conducted elsewhere in Nevada by
other explorers referenced in announcement
body text
The principal target deposit style is claystone
hosted lithium mineralisation. Claystone hosted
lithium deposits are thought to form as a result of
the weathering of lithium-bearing volcanic glass
within tertiary-aged tuffaceous lacustrine
sediments of the mapped Ts3 unit.
Lacustrine environments formed as a result of
extensional tectonic regime that produced ‘basin
and range’ topography observed across the
stateof Nevada. Inputs of lithium from
geothermal sources have also been proposed.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
◦ easting and northing of the drill hole collar
◦ elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
◦ dip and azimuth of the hole
◦ down hole length and interception depth
◦ hole length.
Drillhole locations, orientations and drilled
depths are tabulated in body report
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations should
be shownin detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Intersections, where quoted are weighted by
length. Lengths originally recorded in feet are
quoted to the nearest 10cm.
Rounding is conducted to 3 significant figures
A 500ppm Li cut-off was used to quote
headline intersections, with allowance for 5ft of
internal dilution by lower grade material.
Low grade mineralisation (300-500ppm Li) is
present outside of the quoted intersections
Intersections are quoted in both lithium ppm and
as wt% Lithium Carbonate Equivalent (LCE). LCE is
calculated as LCE = Li (ppm) x 5.323 / 10,000, as
per industry conventions.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
Insufficient information available due to early
exploration status, although interpretation to
date is that intersections in this hole
approximate true width.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
notknown’).
Diagrams
Appropriate maps and sections (with scales)
andtabulations of intercepts should be included
for any significant discovery being reported
These should include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Included in ASX announcement
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
This release describes all relevant information
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysicalsurvey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
This release describes all relevant information
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions orlarge-scale step-out drilling).
Drill results demonstrate further work at the Red
Mountain project is warranted.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Suite 6, Level 5, 189 Kent St, Sydney NSW 2000 | GPO Box 2733, Sydney NSW 2001
+61 (0) 2 8046 2799 | admin@astutemetals.com
www.astutemetals.com
APPENDIX 2 – Red Mountain Drilling
Sample Assay Table
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
Hole ID
From
(ft)
To (ft)
Li
(ppm)
LCE (%)
RMDD002
0
3.9
24.3
0.01
RMDD002
225.4
230
1625
0.86
RMDD002
3.9
9.5
48.3
0.03
RMDD002
230
235
1475
0.79
RMDD002
9.5
15
26.5
0.01
RMDD002
235
241
436
0.23
RMDD002
15
20
120
0.06
RMDD002
241
247.4
773
0.41
RMDD002
20
25
258
0.14
RMDD002
247.4
252.2
1500
0.80
RMDD002
25
30
220
0.12
RMDD002
252.2
257
2300
1.22
RMDD002
30
35
237
0.13
RMDD002
257
260.6
725
0.39
RMDD002
35
40
133
0.07
RMDD002
260.6
264.4
1050
0.56
RMDD002
40
45
75.4
0.04
RMDD002
264.4
270
1590
0.85
RMDD002
45
50
146.5
0.08
RMDD002
270
275
1715
0.91
RMDD002
50
55
284
0.15
RMDD002
275
280
2380
1.27
RMDD002
55
60
420
0.22
RMDD002
280
285
1980
1.05
RMDD002
60
65
938
0.50
RMDD002
285
290
359
0.19
RMDD002
65
70.5
932
0.50
RMDD002
290
295
821
0.44
RMDD002
70.5
76.6
1915
1.02
RMDD002
295
300
935
0.50
RMDD002
76.6
80
1525
0.81
RMDD002
300
305
1180
0.63
RMDD002
80
85
468
0.25
RMDD002
305
310
1130
0.60
RMDD002
85
90
904
0.48
RMDD002
310
315
1080
0.57
RMDD002
90
96
522
0.28
RMDD002
315
320
1125
0.60
RMDD002
96
102.3
262
0.14
RMDD002
320
325
1225
0.65
RMDD002
102.3
105.5
1035
0.55
RMDD002
325
330
697
0.37
RMDD002
105.5
109.5
1535
0.82
RMDD002
330
335
1480
0.79
RMDD002
109.5
115
2130
1.13
RMDD002
335
340
1505
0.80
RMDD002
115
120
1115
0.59
RMDD002
340
345
1240
0.66
RMDD002
120
125
780
0.42
RMDD002
345
348.7
386
0.21
RMDD002
125
130
1285
0.68
RMDD002
348.7
352
241
0.13
RMDD002
130
135
807
0.43
RMDD002
352
355.5
432
0.23
RMDD002
135
140
860
0.46
RMDD002
355.5
360
504
0.27
RMDD002
140
145.5
404
0.22
RMDD002
360
365
455
0.24
RMDD002
145.5
151.6
1265
0.67
RMDD002
365
370
243
0.13
RMDD002
151.6
155
3130
1.67
RMDD002
370
375
195.5
0.10
RMDD002
155
160
2960
1.58
RMDD002
375
380
187.5
0.10
RMDD002
160
165
3280
1.75
RMDD002
380
385
206
0.11
RMDD002
165
170
2710
1.44
RMDD002
385
390
75.2
0.04
RMDD002
170
175
2650
1.41
RMDD002
390
395
60.4
0.03
RMDD002
175
180
2510
1.34
RMDD002
395
400
143
0.08
RMDD002
180
186
2770
1.47
RMDD002
400
404.4
120
0.06
RMDD002
186
190.5
2890
1.54
RMDD002
404.4
409.5
299
0.16
RMDD002
190.5
195
2240
1.19
RMDD002
409.5
415
219
0.12
RMDD002
195
201.7
3850
2.05
RMDD002
415
420
341
0.18
RMDD002
201.7
206
1535
0.82
RMDD002
420
425.3
417
0.22
RMDD002
206
211
110
Share your feedback
Discover